GE-Hitachi ABWR Design Control Document Tier 1 & 2, Rev. 7 - Chapter 21 - Engineering Drawings - Volume 1
ML20007E361
Person / Time
Site: 05200001, 05200045
Issue date: 12/20/2019
From: Michelle Catts
GE-Hitachi Nuclear Energy Americas
To:
Office of Nuclear Reactor Regulation
Shea J
References
GEHITACHIABWR, GEHITACHIABWR.SUBMISSION.8, 25A5675.P, 25A5675.P.7
Download: ML20007E361 (111)


Text

25A5675BB Revision 7 October 2019 ABWR Design Control Document Tier 2 Chapter 21 Volume 1 Copyright 1994, 2010, 2016, 2019 GE-Hitachi Nuclear Energy Americas LLC All Rights Reserved

Chapter 21 Figure TOC Volume 1-i 25A5675BB Revision 7 Design Control Document/Tier 2 ABWR Figure 1.2-2 Reactor Building, Arrangement Elevation, Section A-A............................................21-1 Figure 1.2-2a Reactor Building, Arrangement Elevation, Section B-B............................................21-2 Figure 1.2-3 Upper Drywell, Arrangement Elevation, Section A-A...............................................21-3 Figure 1.2-3a Upper Drywell, Arrangement Elevation, Section B-B................................................21-3 Figure 1.2-3b Lower Drywell, Arrangement Elevation, Section A-A...............................................21-4 Figure 1.2-3c Wetwell, Arrangement Elevation, Sections A-A & B-B............................................21-5 Figure 1.2-4 Reactor Building, Arrangement Plan at Elevation -8200 mm....................................21-6 Figure 1.2-5 Reactor Building, Arrangement Plan at Elevation -1700 mm....................................21-7 Figure 1.2-6 Reactor Building, Arrangement Plan at Elevation 4800/8500 mm.............................21-8 Figure 1.2-8 Reactor Building, Arrangement Plan at Elevation 12300 mm....................................21-9 Figure 1.2-9 Reactor Building, Arrangement Plan at Elevation 18100 mm..................................21-10 Figure 1.2-10 Reactor Building, Arrangement Plan at Elevation 23500 mm..................................21-11 Figure 1.2-11 Reactor Building, Arrangement Plan at Elevation 27200 mm..................................21-12 Figure 1.2-12 Reactor Building, Arrangement Plan at Elevation 31700/38200 mm.......................21-13 Figure 1.2-13a Drywell, Arrangement Plan at Elevation 12300 mm................................................21-14 Figure 1.2-13b Drywell, Arrangement Plan at Elevation 15600 mm................................................21-15 Figure 1.2-13c Drywell, Arrangement Plan at Elevation 18100 mm................................................21-16 Figure 1.2-13d Drywell Steel Structure at Elevation 18100 mm.......................................................21-17 Figure 1.2-13e Lower Drywell, Arrangement Plan at Elevation -6600 to -1850 mm.......................21-18 Figure 1.2-13f Lower Drywell, Arrangement Plan at Elevation -1850 to 1750 mm........................21-19 Figure 1.2-13g Lower Drywell, Arrangement Plan at Elevation 1750 to 4800 mm.........................21-20 Figure 1.2-13h Lower Drywell, Arrangement Plan at Elevation 4800 to 6700 mm.........................21-21 Figure 1.2-13i Wetwell, Arrangement Plan at Elevation -8200 mm................................................21-22 Figure 1.2-13j Wetwell, Arrangement Plan at Elevation -1700 mm................................................21-23 Figure 1.2-13k Wetwell, Arrangement Plan at Elevation 4800 mm..................................................21-24 Figure 1.2-14 Control and Service Building, Arrangement Elevation, Section A-A......................21-25 Chapter 21 Volume 1 List of Figures

Volume 1-ii Chapter 21 Figure TOC 25A5675BB Revision 7 Design Control Document/Tier 2 ABWR Figure 1.2-15 Control and Service Building, Arrangement Elevation, Section B-B.......................21-26 Figure 1.2-16 Control Building, Arrangement Plan at Elevation -8200 mm...................................21-27 Figure 1.2-17 Control and Service Building, Arrangement Plan at Elevation -2150 mm...............21-28 Figure 1.2-18 Control and Service Building, Arrangement Plan at Elevation 3500 mm................21-29 Figure 1.2-19 Control and Service Building, Arrangement Plan at Elevation 7900 mm................21-30 Figure 1.2-20 Control and Service Building, Arrangement Plan at Elevation 12300 mm..............21-31 Figure 1.2-21 Control and Service Building, Arrangement Plan at Elevation 17150 mm..............21-32 Figure 1.2-22 Control and Service Building, Arrangement Plan at Elevation 22200 mm..............21-33 Figure 1.2-23a Radwaste Building at Elevation -1500 mm..............................................................21-34 Figure 1.2-23b Radwaste Building at Elevation 4800 mm................................................................21-35 Figure 1.2-23c Radwaste Building at Elevation 12300 mm..............................................................21-36 Figure 1.2-23d Radwaste Building at Elevation 21000 mm..............................................................21-37 Figure 1.2-23e Radwaste Building, Section A-A..............................................................................21-38 Figure 1.2-24 Turbine Building, General Arrangement at Elevation 5300 mm.............................21-39 Figure 1.2-25 Turbine Building, General Arrangement at Elevation 12300 mm............................21-40 Figure 1.2-26 Turbine Building, General Arrangement at Elevation 20300 mm............................21-41 Figure 1.2-27 Turbine Building, General Arrangement at Elevation 30300 mm............................21-42 Figure 1.2-28 Turbine Building, General Arrangement, Longitudinal Section A-A.......................21-43 Figure 1.2-29 Turbine Building, General Arrangement, Section B-B.............................................21-44 Figure 1.2-30 Turbine Building, General Arrangement, Section C-C.............................................21-45 Figure 1.2-31 Turbine Building, General Arrangement, Section D-D............................................21-46 Figure 1.7-1 Piping and Instrumentation Diagram Symbols (Sheets 1-2)....................................21-47 Figure 3H.1-23 Reactor Building Reactor Cavity Shield Blocks.......................................................21-49 Figure 3H.1-28 Configuration of RPV Pedestal.................................................................................21-50 Figure 3H.1-29 Rebar Arrangement of F/P Girder and Slab (1/2).....................................................21-51 Figure 3H.1-30 Containment Structure Wall Reinforcement.............................................................21-52 List of Figures (Continued)

Chapter 21 Figure TOC Volume 1-iii 25A5675BB Revision 7 Design Control Document/Tier 2 ABWR Figure 3H.1-31 Containment Structure Opening Reinforcement.......................................................21-53 Figure 3H.1-32 Containment Structure Opening Reinforcement.......................................................21-54 Figure 3H.1-33 Containment Structure Top Slab Reinforcement......................................................21-55 Figure 3H.1-34 Reactor Building Foundation Reinforcement (Sheet 1)............................................21-56 Figure 3H.1-35 Reactor Building Foundation Reinforcement (Sheet 2)............................................21-57 Figure 3H.1-36 Diaphragm Floor Reinforcement..............................................................................21-58 Figure 3H.1-37 List of Seismic Wall Sections...................................................................................21-59 Figure 3H.2-21 Control Building Floor Plan at Elevation -8200 mm................................................21-60 Figure 3H.2-22 Control Building Framing Plan at Elevation -2150 mm...........................................21-61 Figure 3H.2-23 Control Building Framing Plan at Elevation 3500 mm............................................21-62 Figure 3H.2-24 Control Building Framing Plan at Elevation 7900 mm............................................21-63 Figure 3H.2-25 Control Building Framing Plan at Elevation 12300 and 13100 mm.........................21-64 Figure 3H.2-26 Control Building Framing Plan at Elevation 17150 and 18250 mm.........................21-65 Figure 3H.2-27 Control Building Framing Plan at Elevation 22200 and 22750 mm.........................21-66 Figure 3H.2-28 Control Building Section...........................................................................................21-67 Figure 3H.2-29 Control Building Section and Details.......................................................................21-68 Figure 3H.2-30 Control Building Details...........................................................................................21-69 Figure 3H.3-11 Radwaste Building, Reinforced Concrete Basemat..................................................21-70 Figure 3H.3-12 Radwaste Building, Structural Steel Framing Plan, Typical Floor...........................21-71 Figure 3H.3-13 Radwaste Building, Structural Steel Framing Plan, Elevation 28000 mm...............21-72 Figure 3H.3-14 Radwaste Building, Section A-A..............................................................................21-73 Figure 3H.3-15 Radwaste Building, Exterior Walls Sections............................................................21-74 Figure 3H.3-16 Radwaste Building, Sections and Details..................................................................21-75 Figure 4.6-8 Control Rod Drive System P&ID (Sheets 1-3)........................................................21-76 Figure 4.6-9 Control Rod Drive System PFD................................................................................21-79 Figure 5.1-3 Nuclear Boiler System P&ID (Sheets 1-11).............................................................21-80 List of Figures (Continued)

Volume 1-iv Chapter 21 Figure TOC 25A5675BB Revision 7 Design Control Document/Tier 2 ABWR Figure 5.2-8 Leak Detection and Isolation System IED (Sheets 1-10).........................................21-91 Figure 5.4-4 Reactor Recirculation System P&ID (Sheets 1-2).................................................21-101 Figure 5.4-5 Reactor Recirculation System PFD.........................................................................21-103 Figure 5.4-8 Reactor Core Isolation Cooling System P&ID (Sheets 1-3)..................................21-104 List of Figures (Continued)

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-1 ABWR Figure 1.2-2 Reactor Building, Arrangement Elevation, Section A-A

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-2 ABWR Figure 1.2-2a Reactor Building, Arrangement Elevation, Section B-B

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-3 ABWR Figure 1.2-3 Upper Drywell, Arrangement Elevation, Section A-A Figure 1.2-3a Upper Drywell, Arrangement Elevation, Section B-B

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-4 ABWR Figure 1.2-3b Lower Drywell, Arrangement Elevation, Section A-A

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-5 ABWR Figure 1.2-3c Wetwell, Arrangement Elevation, Sections A-A & B-B

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-6 ABWR Figure 1.2-4 Reactor Building, Arrangement Plan at Elevation -8200 mm

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-7 ABWR Figure 1.2-5 Reactor Building, Arrangement Plan at Elevation -1700 mm

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-8 ABWR Figure 1.2-6 Reactor Building, Arrangement Plan at Elevation 4800/8500 mm

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-9 ABWR Figure 1.2-8 Reactor Building, Arrangement Plan at Elevation 12300 mm

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-10 ABWR Figure 1.2-9 Reactor Building, Arrangement Plan at Elevation 18100 mm

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-11 ABWR Figure 1.2-10 Reactor Building, Arrangement Plan at Elevation 23500 mm

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-12 ABWR Figure 1.2-11 Reactor Building, Arrangement Plan at Elevation 27200 mm

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-13 ABWR Figure 1.2-12 Reactor Building, Arrangement Plan at Elevation 31700/38200 mm

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-14 ABWR Figure 1.2-13a Drywell, Arrangement Plan at Elevation 12300 mm

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-15 ABWR Figure 1.2-13b Drywell, Arrangement Plan at Elevation 15600 mm

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-16 ABWR Figure 1.2-13c Drywell, Arrangement Plan at Elevation 18100 mm

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-17 ABWR Figure 1.2-13d Drywell Steel Structure at Elevation 18100 mm

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-18 ABWR Figure 1.2-13e Lower Drywell, Arrangement Plan at Elevation -6600 to -1850 mm

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-19 ABWR Figure 1.2-13f Lower Drywell, Arrangement Plan at Elevation -1850 to 1750 mm

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-20 ABWR Figure 1.2-13g Lower Drywell, Arrangement Plan at Elevation 1750 to 4800 mm

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-21 ABWR Figure 1.2-13h Lower Drywell, Arrangement Plan at Elevation 4800 to 6700 mm

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-22 ABWR Figure 1.2-13i Wetwell, Arrangement Plan at Elevation -8200 mm

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-23 ABWR Figure 1.2-13j Wetwell, Arrangement Plan at Elevation -1700 mm

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-24 ABWR Figure 1.2-13k Wetwell, Arrangement Plan at Elevation 4800 mm

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-25 ABWR Figure 1.2-14 Control and Service Building, Arrangement Elevation, Section A-A

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-26 ABWR Figure 1.2-15 Control and Service Building, Arrangement Elevation, Section B-B

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-27 ABWR Figure 1.2-16 Control Building, Arrangement Plan at Elevation -8200 mm

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-28 ABWR Figure 1.2-17 Control and Service Building, Arrangement Plan at Elevation -2150 mm

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-29 ABWR Figure 1.2-18 Control and Service Building, Arrangement Plan at Elevation 3500 mm

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-30 ABWR Figure 1.2-19 Control and Service Building, Arrangement Plan at Elevation 7900 mm

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-31 ABWR Figure 1.2-20 Control and Service Building, Arrangement Plan at Elevation 12300 mm

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-32 ABWR Figure 1.2-21 Control and Service Building, Arrangement Plan at Elevation 17150 mm

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-33 ABWR Figure 1.2-22 Control and Service Building, Arrangement Plan at Elevation 22200 mm

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-34 ABWR Figure 1.2-23a Radwaste Building at Elevation -1500 mm

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-35 ABWR Figure 1.2-23b Radwaste Building at Elevation 4800 mm

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-36 ABWR Figure 1.2-23c Radwaste Building at Elevation 12300 mm

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-37 ABWR Figure 1.2-23d Radwaste Building at Elevation 21000 mm

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-38 ABWR Figure 1.2-23e Radwaste Building, Section A-A

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-39 ABWR Figure 1.2-24 Turbine Building, General Arrangement at Elevation 5300 mm

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-40 ABWR Figure 1.2-25 Turbine Building, General Arrangement at Elevation 12300 mm

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-41 ABWR Figure 1.2-26 Turbine Building, General Arrangement at Elevation 20300 mm

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-42 ABWR Figure 1.2-27 Turbine Building, General Arrangement at Elevation 30300 mm

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-43 ABWR Figure 1.2-28 Turbine Building, General Arrangement, Longitudinal Section A-A

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-44 ABWR Figure 1.2-29 Turbine Building, General Arrangement, Section B-B

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-45 ABWR Figure 1.2-30 Turbine Building, General Arrangement, Section C-C

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-46 ABWR Figure 1.2-31 Turbine Building, General Arrangement, Section D-D

25A5675BB Revision 7 Design Control Document/Tier 2 21-47 ABWR Figure 1.7-1 Piping and Instrumentation Diagram Symbols (Sheet 1 of 2)

25A5675BB Revision 7 Design Control Document/Tier 2 21-48 ABWR Figure 1.7-1 Piping and Instrumentation Diagram Symbols (Sheet 2 of 2)

25A5675BB Revision 7 Design Control Document/Tier 2 21-49 ABWR Figure 3H.1-23 Reactor Building Reactor Cavity Shield Blocks

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-50 ABWR Figure 3H.1-28 Configuration of RPV Pedestal

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-51 ABWR Figure 3H.1-29 Rebar Arrangement of F/P Girder and Slab (1/2)

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-52 ABWR Figure 3H.1-30 Containment Structure Wall Reinforcement

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-53 ABWR Figure 3H.1-31 Containment Structure Opening Reinforcement

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-54 ABWR Figure 3H.1-32 Containment Structure Opening Reinforcement

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-55 ABWR Figure 3H.1-33 Containment Structure Top Slab Reinforcement

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-56 ABWR Figure 3H.1-34 Reactor Building Foundation Reinforcement (Sheet 1)

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-57 ABWR Figure 3H.1-35 Reactor Building Foundation Reinforcement (Sheet 2)

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-58 ABWR Figure 3H.1-36 Diaphragm Floor Reinforcement

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-59 ABWR Figure 3H.1-37 List of Seismic Wall Sections

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-60 ABWR Figure 3H.2-21 Control Building Floor Plan at Elevation -8200 mm

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-61 ABWR Figure 3H.2-22 Control Building Framing Plan at Elevation -2150 mm

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-62 ABWR Figure 3H.2-23 Control Building Framing Plan at Elevation 3500 mm

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-63 ABWR Figure 3H.2-24 Control Building Framing Plan at Elevation 7900 mm

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-64 ABWR Figure 3H.2-25 Control Building Framing Plan at Elevation 12300 and 13100 mm

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-65 ABWR Figure 3H.2-26 Control Building Framing Plan at Elevation 17150 and 18250 mm

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-66 ABWR Figure 3H.2-27 Control Building Framing Plan at Elevation 22200 and 22750 mm

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-67 ABWR Figure 3H.2-28 Control Building Section

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-68 ABWR Figure 3H.2-29 Control Building Section and Details

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-69 ABWR Figure 3H.2-30 Control Building Details

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-70 ABWR Figure 3H.3-11 Radwaste Building, Reinforced Concrete Basemat

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-71 ABWR Figure 3H.3-12 Radwaste Building, Structural Steel Framing Plan, Typical Floor

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-72 ABWR Figure 3H.3-13 Radwaste Building, Structural Steel Framing Plan, Elevation 28000 mm

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-73 ABWR Figure 3H.3-14 Radwaste Building, Section A-A

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-74 ABWR Figure 3H.3-15 Radwaste Building, Exterior Walls Sections

25A5675BB Revision 7 Security-Sensitive Information Withhold from Public Disclosure under 10 CFR 2.390 Design Control Document/Tier 2 21-75 ABWR Figure 3H.3-16 Radwaste Building, Sections and Details

25A5675BB Revision 7 Design Control Document/Tier 2 21-76 ABWR Figure 4.6-8 Control Rod Drive System P&ID (Sheet 1 of 3)

25A5675BB Revision 7 Design Control Document/Tier 2 21-77 ABWR Figure 4.6-8 Control Rod Drive System P&ID (Sheet 2 of 3)

25A5675BB Revision 7 Design Control Document/Tier 2 21-78 ABWR Figure 4.6-8 Control Rod Drive System P&ID (Sheet 3 of 3)

25A5675BB Revision 7 Design Control Document/Tier 2 21-79 ABWR Figure 4.6-9 Control Rod Drive System PFD

25A5675BB Revision 7 Design Control Document/Tier 2 21-80 ABWR Figure 5.1-3 Nuclear Boiler System P&ID (Sheet 1 of 11)

25A5675BB Revision 7 Design Control Document/Tier 2 21-81 ABWR Figure 5.1-3 Nuclear Boiler System P&ID (Sheet 2 of 11)



&+59$/9(6 566 566



9$/9(/

25A5675BB Revision 7 Design Control Document/Tier 2 21-82 ABWR Figure 5.1-3 Nuclear Boiler System P&ID (Sheet 3 of 11)

25A5675BB Revision 7 Design Control Document/Tier 2 21-83 ABWR Figure 5.1-3 Nuclear Boiler System P&ID (Sheet 4 of 11)

25A5675BB Revision 7 Design Control Document/Tier 2 21-84 ABWR Figure 5.1-3 Nuclear Boiler System P&ID (Sheet 5 of 11)



566 566



/7



25A5675BB Revision 7 Design Control Document/Tier 2 21-85 ABWR Figure 5.1-3 Nuclear Boiler System P&ID (Sheet 6 of 11) 13 RSS 004 LT B

13 RSS

25A5675BB Revision 7 Design Control Document/Tier 2 21-86 ABWR Figure 5.1-3 Nuclear Boiler System P&ID (Sheet 7 of 11)

25A5675BB Revision 7 Design Control Document/Tier 2 21-87 ABWR Figure 5.1-3 Nuclear Boiler System P&ID (Sheet 8 of 11)

25A5675BB Revision 7 Design Control Document/Tier 2 21-88 ABWR Figure 5.1-3 Nuclear Boiler System P&ID (Sheet 9 of 11)

25A5675BB Revision 7 Design Control Document/Tier 2 21-89 ABWR Figure 5.1-3 Nuclear Boiler System P&ID (Sheet 10 of 11)

25A5675BB Revision 7 Design Control Document/Tier 2 21-90 ABWR Figure 5.1-3 Nuclear Boiler System P&ID (Sheet 11 of 11)

25A5675BB Revision 7 Design Control Document/Tier 2 21-91 ABWR Figure 5.2-8 Leak Detection and Isolation System IED (Sheet 1 of 10)

25A5675BB Revision 7 Design Control Document/Tier 2 21-92 ABWR Figure 5.2-8 Leak Detection and Isolation System IED (Sheet 2 of 10)

25A5675BB Revision 7 Design Control Document/Tier 2 21-93 ABWR Figure 5.2-8 Leak Detection and Isolation System IED (Sheet 3 of 10)

25A5675BB Revision 7 Design Control Document/Tier 2 21-94 ABWR Figure 5.2-8 Leak Detection and Isolation System IED (Sheet 4 of 10)

25A5675BB Revision 7 Design Control Document/Tier 2 21-95 ABWR Figure 5.2-8 Leak Detection and Isolation System IED (Sheet 5 of 10)

25A5675BB Revision 7 Design Control Document/Tier 2 21-96 ABWR Figure 5.2-8 Leak Detection and Isolation System IED (Sheet 6 of 10)

25A5675BB Revision 7 Design Control Document/Tier 2 21-97 ABWR Figure 5.2-8 Leak Detection and Isolation System IED (Sheet 7 of 10)

25A5675BB Revision 7 Design Control Document/Tier 2 21-98 ABWR Figure 5.2-8 Leak Detection and Isolation System IED (Sheet 8 of 10)

25A5675BB Revision 7 Design Control Document/Tier 2 21-99 ABWR Figure 5.2-8 Leak Detection and Isolation System IED (Sheet 9 of 10)

25A5675BB Revision 7 Design Control Document/Tier 2 21-100 ABWR Figure 5.2-8 Leak Detection and Isolation System IED (Sheet 10 of 10)

25A5675BB Revision 7 Design Control Document/Tier 2 21-101 ABWR Figure 5.4-4 Reactor Recirculation System P&ID (Sheet 1 of 2)

25A5675BB Revision 7 Design Control Document/Tier 2 21-102 ABWR Figure 5.4-4 Reactor Recirculation System P&ID (Sheet 2 of 2)

25A5675BB Revision 7 Design Control Document/Tier 2 21-103 ABWR Figure 5.4-5 Reactor Recirculation System PFD

25A5675BB Revision 7 Design Control Document/Tier 2 21-104 ABWR Figure 5.4-8 Reactor Core Isolation Cooling System P&ID (Sheet 1 of 3)

25A5675BB Revision 7 Design Control Document/Tier 2 21-105 ABWR Figure 5.4-8 Reactor Core Isolation Cooling System P&ID (Sheet 2 of 3)

25A5675BB Revision 7 Design Control Document/Tier 2 21-106 ABWR Figure 5.4-8 Reactor Core Isolation Cooling System P&ID (Sheet 3 of 3)