e MAR 1 1879 MD10RANDlM FOR:
J. H. Sniezek, Director, FFMSI FRCM
- 8. H. Grier, Director, R!
StSJECT:
RADIAT!0R SURVEYS IN NORTON/ATTLEBORD, MASSACHUSETT5 I
AREA 4
n Attached is Region I. Report No. 078-154 regarding. radiation surveys and sample analyses associated with our investigation of allegations that radioactive enterial was buried in certain ' andff11 sites in the.1orton/
k Attleboro, Massachusetts area. As a result of extensive surveys and-t sampling at the alleged burial sites conducted by Region I and state of
[
i l
Massachusetts personnel, redicactive material was,'in fact, found at two locations. One location in'Norton was.found to have material (uranium)
(
subject to 00E er.HRC. regulatory control. The other locationg,in Attleboro, i
l was found to.contain redoom only (not subject, to NMC regulatory control),
l I
for which the state of Massachusetts has assumed ibility. The l
investigation into the source of material found in Novem site is continuing and will be the sehject of a saperater report.. As of. February 1
L 27,1979 the source of the esterial has not beam' established..". a As pmviously discussed with the Headquarters staff,,in order to assure I
there are no other locations in the Norton/Attlebore area where radioactive material may have been deposited, we request a detailed Aerial Monitoring System (AMS) overflight of the Norton/Attleboro, Massachusetts area. We L
reccamend the overflight be performed in early spring after the snow cover is gone and be made by helicopter to maximize sensitivity. We believe this flight should be given priertty over routinely scheduled flights.
As you recognize there art tuo subjects that need 1sendiate Headquarters attention. These are:
1.
Informing the City of Norton of the present status of the situation and what they can expect in terus of twsolution.-
2.
Release of the attached report to the public.
We can expect requests for both items 1 and 2 before long. We request
,f prompt Headquarters guidance on these two items.
9003060213 900305 2 r'ib I
l pj i
CALHOUN90-78 PDR i
omes>
- FFMS,
,FFMS DEP DI
. DIR T B___
_,611
'g_ __Gej,cj. __ _
,,5$
' M
.s svanama > Stohr,1L,,,,,
7/28,/19
___..MM... __
d1.
i oare >
NRC Form 318 (RI) (5-76) NRCW 02040
'u. s. tortween Pamias arrect is7s.trMo j
/
/
.*./',,.-
.s.e i
J. H. Sntezek 2
i w
A third item directif related to itam 1 above is our future
' action.
the Norton site have been unsuccessful.As we understand. efforts to course of 4
establish responsibility for ownershir or possession of the material Asstning we are unable to or the timelit-was-deposited on the Schpack (Norton) property that must be answered is, what should HRC do to resolve the at
, the question the interest of the health and safety of the public situation in
" 'Ufailed to establish who poss s dgation into the source of the material o So far. investi-j licensed,or' AEC contract work, it and whether the material came from e se as j
, Although DOE has shown a lack of interest in assuming respon i
-(apparently based on our inability to prove the material came fr contract work). turning the site over to DOE still seems the most log alternative.
om Therefore we recommend that this " turnover" be pursued at a hjgher.) vel than our presently used working levelt
~4 able to acc(omplish this a co which we would obviously have to have done by contractnsiderable tas
},
This would be the subject of a separate memo.we will provide a If this happens,
>g er.
Commonwealth of MassachusettsPending yest review we intend to sen
'(
o the t
the Town of Norton, and the PDR.
('
also prepared staff contact *,,to provide a cop,y 16' Congresswoman Heckler's designated We are i
i i
The Region I contact;is J. P. Stohr;(488-1260).
LA m
![
Doyce H. Grier Director
({!
)
cc:
(
D. Thompson (w cy of enc 1)
E. M. Howard B. Weiss (w/o(cy of enc 1w/ocyofenc1)
D. Sly (w/o cy of enc 1) )
3 bCC' lI ii i
W. G. Martin, SG i
I
'I
- i OF F tCE >.................,.......**...***...
}
om l
\\
8Q att (9 77)
% U. S. GOVE ttNME NT PMtNTINO Of f lCE 1977-237-026
................