Notifies of Preliminary Audit Scheduled for 900214-15 Re Advanced BWR Design.Audit Team Members Listed
ML20006F558
Person / Time
Site: 05000605
Issue date: 02/09/1990
From: Scaletti D
Office of Nuclear Reactor Regulation
To: Marriott P
GENERAL ELECTRIC CO.
References
NUDOCS 9002280162
Download: ML20006F558 (1)


Text

-

J

\\

fe; February 9, 1990 j

L Docket No. SIN 50-605 Patrick W. Marriott, Manager Licensing & Censulting Services GE Nuclear Energy General Electric Conpany 175 Curtner Avenue San Jose, California 95125-

Dear Mr. Marriott:

SUB7ECT: PRELIMINARY A&lR DESIGN IEIAIL AUDIT As you are aware 10 CFR Part 52 requires applications for design certification be able to d.is. Late a level of design detail sufficient to allow the developnent. of procurement specifications and ve-Luction and installation specifications for a certified standard design. It is the intent of the staff to review the ABWR, in order to make the r civeary finding, through a design detail audit of the agugiate files in GE's San Jose Offices, m is letter is to notify you of a preliminary audit scheduled with your staff for February 14-15, 1990. The intent of this preliminary audit is to familiarize the staff with the ABWR files that will be available for a detailed team audit to be scheduled in the near future.

The preliminary audit team will be made qp of the following individuals:

E. Imbro, section leader, R. Parkhill, team 1*, H. Wang, structures, of the Vendor Inspection Brarrh; T. DalGaizo, mechanical systems, C. Crane, electrical systems, A. DuBouchet, mechanical ccmponents, J. I.civo, instrumentation and control, consultants; C. Miller, Director, Standardization and Life Extension Project Directorate; ard myself. We expect the morning of the first day to L

focus on a discussion of the ptrpoce of this audit, as tell as a presentation-by GE relative tc the ABWR design process and resultant level of detail. The remaining time should spent with the individual discipline leaders meeting with the responsible GE engineers. If you have any questions regarding this audit, please call me at (301) 492-1104.

Sincerely,

[Ino C. scaletti, Project Manager Standardization and Life Extension Project Directorate Division of Reac.or Projects - III, IV, V and Special Projects i

I Office of Nuclear Reactor Regulation b

DISTRIBUTION:

NRC PIR E. Imbro C. Miller i -

W Omntral'Filef R. Parkhill G. Holahan l

PDS S

PDSL PDSL~ R/F"

J. Partlow J. Sniezek etti (Miller ACRS F. Miraglia T. Murley 02/(/90 0

/90 02/g /90 W. Travers B. Grimes

.9002280162 900209 U

/06 t' '

PDR ADOCK 05000605 P

\\g A

PDC i?