ML20006E905
| ML20006E905 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 01/31/1990 |
| From: | Hairston W, Dennis Morey ALABAMA POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9002260519 | |
| Download: ML20006E905 (5) | |
Text
iy ~
i ' ) ' 'e n
Alabama Power Company 40 lnverness Center Parkway j
Post Office Box 1295 Birmingham, Alabama 35201 Telephone 205 868 5501 W. G. Hairston,111 Senior Vice President i
Nuclear Operations AlabamaPbwer r
the southem electre system f
February 15, 1990
.i
/
Docket No. 50-364 p
i I
j' U. S. Nuclear Regulatory Commission ATIN: Document Control Desk l
L washington, D. c.
20555 Joseph M. Farley Nuclear Plant
~;
Unit 2 Monthly Operating Data Report I
A Attached is the January 1990 tionthly Operating Report for Joseph M. Farley t&telear Plant Unit 2, required by Section 6.9.1.10 of the Technical Specifim tions.
If you have any questions, please advise.
j Respectfully submitted, f
g
'I GC a ston, II JGS sme/1.6 Attachment cca Mr. S. D. Ebneter Mr. E. A. Reeves Mr. G. F. Maxwell 1
i 1
F 9002260519 900131 gDR ADOCK 05000364 PNU V
t; '
n OrtswrIN3 InTh REFORT DOCKET NO.
50-364 IWit 2/2/90 CCMP1Jr!M) BY D. N. Morey
'IEEEPHCEE (205)899-5156 OPERETING S1RIUS Notes
- 1. Unit Names Joseph M. rarley - Unit 2
- 2. Reporting Period:
January, 1990
- 1) Cumulative data since
- 3. Licensed Thermal Power (fMt):
2,652 7-30-81, date of
- 4. Nameplate Rating (Gross MNe):
860 commercial operation
- 5. Design Electrical Rating (Net fMe): 829
- 6. Maxinum Dependable Capacity (Gross MNe):
868.6
- 7. Maxinum Dependable Capacity (Net MWe):
828.2
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
Items #6 and 47 have been changed due to evaluation of operating experience.
- 9. Power Level 1b Which Restricted, If Any (Net MWe):
N/A
- 10. Reasons For Restrictions, If Any:
N/A
=
'Ihis Month Yr-to-Date Cumlative j
t
- 11. Hours In Reporting Period 744 744 74 553
- 12. Number Of Hours Reactor Was Critical 744.0 744.0~
~5
.T'
- 13. Reactor Reserve Shutdown Ilours 0.0 0.0 35T'
- 14. Hours Generator On-Lir.e 744 T
~744.0 63,816.0
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross '1hermal Energy Generated (IMI)
I~?I70,306 1,970,306 152,226,573 654,930 E, 21,172
~
- 17. Gross Electrical Energy Generated (MNH) 654,930
~ 624,764 P, 66,154
- 18. Net Electrical Energy Generated (PMI) 624,764
- 19. Unit Service Factor 100.0
'100.0 85.6
- 20. Unit Availability Factor 100.0 100.0 85.6
~
- 21. Unit Capacity Factor (Using MDC Net) 101.4 101.4 82.9 22L Unit Capacity Factor (Using DER Net) 101.3 101.3 81.8
- 23. Unit Forced Outage Rate 0.0 0.0 4.5
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup: N/A
- 26. Units In Test Status (Prior to Comercial Operation):
Forecast Achieved INITIAL CRITICALITY 05/06/81 05/08/81 INITIAL ELECTRICITY 05/24/81_
05/25/81 C0fGEERCIAL OPERATICM 08/01/81 07/30/81
(
rorm 2/30 1
ymwy r
,7 4
4 c r.m w
"+-
p
- c s,
+
' JOSEFH M. ' FARLEY NUCLEAR ILWT LNIT 2 NAHRATIVE SitHARY OF OPERATIONS January, 1990 E'
hm were no unit shutdowns or signifloant power reductions during the O
~ month of January.
c.
N following major safety-related r.aintenatee was perfonned in the month I
of January:-
f e
,1.
A water leak was repaimd ard a new coolirW ' coil was installed on the -
p-
+
' 2A~ service water pianp motor.
u te 2.. 'Ihe turbine driven auxiliary feedwater pump overspeed tappett assembly was mplaced.
p p
3.- The 2A incore detector ard clutch were mplaced.
p f.'
4.
Miscelleneaus corrmet.ive ard rWventive mairatetunce was perfonned on -
T, L
the diea#1 r eerators.
I!'
g p.
Lfr Ll:
Til 1
n re
_rw' m
L'
(
1
~ - _.
t
^
r t
DOCKET No.
50-364 UNIT 2
MTE rebruary 2,1990 t
CCMPLETED BY D. N. Morey TELEPHONE (205)899-5156 I
MONDI January MY AVERAGE MILY POWER LEVEL Mt AVERAGE MILY MMER LEVEL (le9e-Net)
(IMe-Net) t-1 845 17 836 2
845 18 838 3
842 19 835 4
839 20 833 5
839 21 838 6
840 22 843 7
840 23 842 s '
8 843 24 837 9
027 25 835 1
10 816 26 846 11 842 27 845 12 845 28 841 13 846 29 839 14 845 30 845 15 843 31 845 16 839 1
INSTRUCTIONS on this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
. Form 13/21
-r-.
.;[ h UNIT SEUTDotfFS JWrD roWEm mEDUCrloWS DoCERT Wo.54-364 IC UWtr WhfE J. M. FaRLEr
'JWIT 2 _/.
DkrE FESSWhar 2, 19*9 comEno n
- o. w. - Er erront n ye sanoami rEzarnosE (mesi m -s154 l
l l
l l
l MErWoD OF
-l LICENSEE l
l CaWSE & CORmECrIVE.
l I
I I
I numeros 1 i Snverras i EvEnr i Srn.m I u m I
actron to
(
ino.
I narE I rrrE.I <noemS)
I =EaSon I no== mEacrom' I mEroar e !cooE' !em i
reEv m mEcumet cE I
.i 2
5 i
l 1
1 I
I i
.I I
I I
lenEmE wEmE no owir Sauroo S om Szo rrreant co En mEnverro S ovarma.r=E Mourn oe annuaar.
1 IL I
I I
I I
I i
1 l
i I
I I
I I
-I i
i i
I I
I I
I I
I I
I i
I i
l-1 I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
i i
I I
I I
I I
I I
I I
I I
I I
I I
l~
l l
I I
I I
I I
I I
I I
I I
I I
i i
i l
I i
I i
l i
I i
i i
i i
i i
l i
l l
I I
I I
I I
I I
I I
I i
i i
i I
I I
I I
I I
I i
.I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
i i
i i
l I
I I
I I
I I
I I
I I
I I
i l
I i
l I
I i
i i
i l
I i
i I
I i
i i
i i
i l
l I
I I
i i
i i
l I
i I F: Forced Reasons Meth63*
Exhibit G-Instructions-S: Scheduled a-Equipment Failure (Explain) 1-Manual for preparation of Data B-Maintenance or Test 2-Manni Scran, Entry Sheets for Licensee C-Refueling 3-autoestic Scree.
Event neport(LEm) File (NUmEG-D-Regulatory mestriction 4-other *Explaine 0161)
E-operator Training s License Examination F-administrative
' Exhibit ! -Same Source G-operational Error (Explain)
(9/77) n-other (Explaint M Rxa M
-