Forwards Insp Rept 50-160/90-01 on 900116-19.No Violations or Deviations Noted
ML20006E758
Person / Time
Site: Neely Research Reactor
Issue date: 02/05/1990
From: Cline W
NRC Office of Inspection & Enforcement (IE Region II)
To: Karam R
Neely Research Reactor
Shared Package
ML20006E759 List:
References
NUDOCS 9002260321
Download: ML20006E758 (2)


See also: IR 05000160/1990001

Text

m

.

.

g,w

+

.

,.

,

e

+

i

,o

.

.

F

FEB 5

1999

'

n

j

g

h

Docket No. 50-160-

O

License No. R-97

'

'..

~

g"

Georgia Institute of Technology

ATTN: Dr, Ratib A. Karam,. Director

i

Neely Nuclear Research Center

,

225 North Avenue

3

Atlanta, GA 30332

l

i

'

6

Gentlemen:

w[

'

. SUBJECT: NRC INSPECTION REPORT NO. 50-160/90-01

L

This -refers to the Nuclear Regulatory Commission (NRC) inspection conducted

l

by C. H. Bassett on January 16-19, 1990.

The inspection included a review of

' activities authorized for your Georgia Institute of Technology Research Reactor

F

(GTRR) facility.

At the conclusion of the inspection, the findings were

-

'. discussed with those members. of your staff identified in the enclosed

!

Inspection Report,

'

,

Areas examined during' the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

,

andDrepresentative . records, interviews with personnel, and observation of

i

activities in progress.

l

"'

.

!

'With'in the . scope of the inspection, no violations or deviations were

"

identified.

,

In accordan'ce with Section 2.790 of the NRC's " Rules of Practice," Part 2,

l

Title 10,. Code of Federal Regulations, a copy of this letter and its enclosure

i

l'

will be.placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please' contact us.

.

Sincerely,

L

[;

ORIGINAL SIGNED BY

{

WILLIAM E. CLINE

'

William E, Cline, Chief

b

Nuclear Materials Safety and

O

'

Safeguards Branch

/2

,

Division of Radiation Safety

.

'

r.,

and Safeguards.

Enclosure:

NRC Inspection Report

.

.cc w/ enc 1:

(See page 2)

.

9002260321 900205

D

PDR

ADOCK 05000160

h

Ik

.9,

. PDC

d

b

,

,

y

-

l1

7.-

FEB 5

1990

Georgia Institute of~Techno1'ogy

2

h

cc w/ enc 1:

Dr. G. Pohlein, Vice President

-

for Interdisciplinary Programs

Georgia Institute of Technology-

225 North Avenue

r

'

'

Atlanta, GA 30332

!

Dr. William Vernetson

Director'of Nuclear Facilities

<

'

'

Department of Nuclear' Engineering

Sciences

University _of Florida.

202 Nuclear Sciences Center

Gainesville, FL 32611

1

Garry D. Miller, Associate Director

Nuclear Reactor Program

North Carolina' State University

Box 7909

Raleigh, NC 27695-7909

'

Dr. R. U. Mulder, Director

6-

Reactor Facility

'

University of Virginia

Charlottesville, VA 22901

-i

' James G. Ledbetter, Commissioner

Department of Human Resources

47 Trinity Avenue

' Atlanta, GA 30334

-

Charles H. Badger

Office of Planning and Budget

Management Review Division

Room 608

270 Washington, Street, SW

,

Atlanta, GA _30334

-. Mayor of the City of Atlanta

.

.

Atlanta, GA 30301

,

'. State-of Georgia

bec w/ enc 1:

Document' Control Desk

A. Adams, NRR

C. Bassett, RII

'ARII

6 ine

SS

l'

ser

01/M/90

g

90