Fc r -

e '..}

~

~

CH ATTANOOGA. TENNESSEE 37401 I

SN 157B Lookout Place FEB 141990 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.

20555 Gentlemen:

In the Matter of

)

Docket Nos. 50-327.

Tennessee Valley Authortty

)

50-328

, SEQUOYAfi NUCLEAR PLANT (SQN) - COMPLETION OF COMMITMENTS FOR GENERIC LETTER 88 INSTRUMENT AIR SUPPLY SYSTEM PROBLEMS AFFECTING SAFETY-RELATED EQUIPMENT-

Reference:

Letter from TVA to NRC dated Februa.y 23, 1989, " Browns Ferry Nuclear Plant (BFN), Sequoyah Nuclear Plant (SQN), and Watts Bar.

Nuclear Plant (WBN) - Response to Generic. Letter 88 '

Instrument Air Supply System Problems Affecting Safety-Related Equipment" This. letter provides written notification that all actions associated with the nine SQN commitments contained in the reference letter are complete, Enclosed' is a listing of the commitments made for SQN in Enclosure 4 of the referenced.

' letter and the-~ completion date for each.

Please direct questions concerning this issue to D. V.-Goodin at (615) 843-7734'.

Very truly yours, TENNESSEE VALLEY AUTHORITY h

Managei,Nuclea%/

r Licensing 4

H i

and Regulatory Affairs

~

Enclosure cc: See.Page 2

^

I-

)

9gRo2260037 900214 g

ADOCK0500g7 j

j i t i

An Equal opportunity Employer k

k,. 4 (l9 7

E -.

i i1 '

H,;

i 2

,+

  • LU.S. Nuclear Regulatory Commission

.FEB 14 B90 L^

-+

1 cc (Enclosure):

.MS. S. C.-Black, Assistant Director L'

for Projects l

L' LTVA Projects Division _

l U.S. Nuclear Regulatory Commission.

o One White Flint, North L,' l b:

_11555 Rockville Pike

[

Rockville, Maryland 20852 l

Mr. B. A. Wilson, Assistant Director for Inspection Programs; L,

TVA Projectt Division U.S. Nuclear Regulatory Commission F

Region II.

F 101 Marietta. Street, NW, Suite 2900 Atlanta, Georgia 30323 lNRC Resident Inspector

'n

!Sequoyah Nuclear Plant.

2600 Igou. ferry Road r

Soddy Daisy, Tennessee 37379 a

n 1

. c i

i e

"k e

+

i 4

4 s

i I

J q

~.

ppnoy gd

- q Q jy a f,5 /

f ENCLOSURE g

f*", ' M-GENERIC LETTER 88-14. -.

SUMMARY

LIST Of COMMITMENTS

,e SQN.

1 1.

"PMT-84,.which is still open, will be revised to require air quality

'3 l

verification for. lubricant content at the rotary screw compressor's discharge downstream of the 2-stage pipeline filter.

The scoping document for PMT 84 will be revised by May 4, 1989, and PMT-84 will be performed by July 31, 1989."

h

Completed April 24. 1989,' and July 28, 1989, respectivaly, e
2.. " Plant procedures will.be revised to require routine. set point l

verification of moisture elements in the ACA and SCSA systems by l

h July 31, 1989."

j

/

Completed August 28, 1989.

e Y

3. " Routine air quality testing will be impleinented by August 28,:1989."

Completed September 12, 1989.

4.

"The need for local filters for 28 users will be evaluated by June 1, 1989."'

' Completed May 25, 1989.

5.

"New procedures will be created or_ existing procedures will be revised by May,15, 1989, to. ensure adequate PM for syster drain traps."

Completed April 26, 1989.

6.

"NE will perform a review of-A01-10 to ensure the. air systems events are adequately covered and responded to by Operations ~from an engineering standpoint. Any identified deficiencies will be transmitted to Operations to eliminate possible interface problem between NE and-Operations.

This= review will be complete by September 29, 1989."

~ Completed September 27, 1989.

7.

"As part of TVA's. review of SOER 88-01, a review is being conducted to

' identify improvements required to the SCSA and ACA pneumatic accumulators a:

-and check valves and their maintenance testing procedures.

Thh review p,1

^

is being done to ensure that (1) accumulator check valves will' properly

~

rescat upon both a gradual and rapid loss of upstream pressure, (2) check g'

valves are properly designed for air service, (3) low accumulator tank 4

pressure _is properly annunciated, and (4) accumulator tank design 1s-properly documented by calculations.

This review will be complete by April;3, 1989."

L

-Completed Apr11 3, 1989.

I l

f% / Q"W Rn% ?j.W{ ?

e p,; M s

b

+,.

y. w;;p:.

.. z.

4 m n+ a,m+

o o %,u:p 7 @ n;.,.'

q ; mem of :g,, "An evalu'atio.will?be performediby' September 15,21989, to determinelif 0:

p >.

-v-

..t n

-;the failure ~ position ofc18 unmarked users:should;beishown.:and drawings

@QF A will:be/ revised *accordingly."

^

4 m

N-f'J Completed September 30, 1989.

,t-U,y 9.1

'.An evaluation ~cf the proper failure po'sition:of 10.' air-operated j

ventilation dampers will be completed by May 4 1989."'

3

,..'yi, Comple'te'd'Aprili21, 1989.

g n

i I

7'..

s

. p.

t

[

},

b f

I : l:c

'f o

fj m

)

i t

Ts

- ?

.t 2..j _ '

}'

.s.

l' j

... s t V-s s

t i

e g!

I i

--'t

.. ; j <

r 1

y h.f '

t M

t t

}&,

]

7

.i

f.,

J

'7 1

le '

3 i

=

l p

.1

{

5 g

hna t

3

+

-E3

.. I R

?

'm;"

a l ; * ', [\\.

g f,i '

A t

L?

g

l p 6

.[$ t.

[

^

.c.

r

.g b

j~

Y.. '. _.;

g

.,s g

I w

r1 j ',

{' ['

$ ).

j

- g r

s I.'-

t I

5 9

i i

ticrr

_i-

)

a; m;

a.. >>

V 5

1 h ayh*l *:;i;[

y ut.

k -.

.ki

.m,

3"

_,u,_

,