Informs of Change in Forecast Dates for Spent Fuel Pool Investigation from Dates Presented to NRC at 900124 Meeting at Plant Site.Change Necessitated by Procurement Delay on Replacement Parts for Traveling Hoist
ML20006E542
Person / Time
Site: Rancho Seco
Issue date: 02/13/1990
From: Keuter D
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
AGM-NUC-90-035, NUDOCS 9002230531
Download: ML20006E542 (2)


Text

E

.)[y

~

O

[ 4 suun

. SACRAMENTO MUNICIPAL UTILITY DISTRICT D P. O. Box 15830, Sacramento CA 95852-1830,(916) 452 3211 AN ELECTRIC SYSTEM SERVING THE HEART OF CAL.tFORNIA i

AGM/NUC 90-0'35' L

February -13,.'1990 ^

y U.:S. Nuclear Regulatory Commission F' '

' Attn:

Document Control Desk lHashington,DC-20555 i

Docket No,'50-312 Rancho Seco Nuclear Generating Station
License No. OPR-54 SPENT-FilfL POOL INVESTIGATION r

Attention:'. George Knighton lThis letter is to' inform you of a change in the' forecast dates for the Spent ~

Fuel Pool Investigation from those arcsented to the-Commission on January 24,.

1990,-at a meeting held at Rancho SOLO Nuclear Generating Station.

The anticipated changes'are shown on Attachment 1, which is a revised copy of a.

handout from the January 24, 1990 meeting.

This change in forecast dates was

necessitated by a procurement delay on replacement parts for a traveling hoist which will-beLneeded to move spent fuel. racks, thus-delaying inspection and evaluation of the area under the racks.

Members 1of'your staff with questions requiring additional.information or y

clarification may contact' Rita Bowser at.(209) 333 2935, extension 4522.

Sincerely,

}

. Dan R. Keuter Assistant Genera 1' Manager J

~'

Nuclear
Y l

l Attachment 1

cc.w/atch:

J. B. Martin, 'NRC, Halnut Creek G. Yuhas, NRC Halnut Creek A. D'Angelo, NRC, Rancho Seco 3

i i

):.

sM 9002230531 900213 h9

.j

{DR. ADOCKOS00gi2

/

p

' RANCHO SECO NUCLEAR GENERATING STATION O 1444o Twin Cities Road, Herdd, CA 95638 9799;(209) 333 2935

..j

~

x,;:

y SPENT FUEL POOL INVESTIGATION-PLANNED INVESTIGATION FORECAST

- COMPLETE

  • Design / Procure Materials / Construct Rack Handling Fixture 43/90 5/24/90-
  • Evaluate Suspect Embedments 5/M/90

- Apply Sealant-

- Perform Weld Repairs

  • Complete North Wall VBT/ Weld Repair if Required TBD
  • Install " Drinking Bird" Flow Meter 3/14/90
  • Evaluate Results 6/M/90 7/20/90

- Continue Search or Close Issue j

- Issue Final Report l

.J