Forwards Final Rept, Reactor Vessel Matl Surveillance Program for Sequoyah Unit 2:Analysis of Capsule U. Measured Fluence Rates for Cycle 3 Approx 38% Lower than Fluence Rates Reported for Cycles 1 & 2
ML20006E242
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 02/12/1990
From: Michael Ray
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20006E243 List:
References
NUDOCS 9002220401
Download: ML20006E242 (3)


Text

gy. : 7.;

s y

z h

a-

+'

4,

.J i> utr s

TENNESSEE VALLEY AUTH'ORITY:

CH ATTANOOGA. TENNESSEE 37401 SN'1578 Lookout' Place-Qg i

LLS. Nuclear Regulatory Commission

-- ATTN : Document Control Desk Hashington,-D.C. '20555 i

Gentlemen:

m In;the Matter-of

)

)

Docket No. 50-328 Tennessee Valley Authority SEQUOYAH NUCLEAR PLANT (SQN) UNIT.2 - ANALYSIS OF REACTOR VESSEL IRRADIATION.

CAPSULE U 1

Enclosed is the final report, prepared by Southwest Research Institute,-on-testing of :the subject reactor vessel specimen that was removed during the SQN UnitL2 Cycle 3 refueling outage.

The measured fluence rates for' Cycle 3 are approximately-38 percent ' lower than the fluence rates reported for Cycles 1 and= 2 because of the use of a low-leakage core configuration.

This report is being submitted in.accordance with Technical Specification 3/4.4.9 and-t

'l 10 CFR 50,. Appendix H.

'TVA has conducted a review of'the_ enclosed report and determined that the projected material toughness for operating through'32 effective full power

. years is-supported by the data.

Based on the test results, the SQN Unit 2 reactor vessel can be expected-to operate for its design life without exceeding material toughness criteria.

Please direct questions concerning this issue to Bruce S. Schofield at (615) 843-6172.

Very truly yours, TENNESSEE VALLEY AUTHORITY

\\

G

Manager, uclear Litehsing and Regulatory Affairs L

Enclosure cc:

See page 2 9002220401 900212 u

PDR ADDCK 05000328 P

PNU

/)d68 An Equal opportunity Employer

/[/

peg y

s -

w.

1.

m.

, 1.

?

y L

- g.

O.S.[;Nucleat: Regulatory Commissioni cc (Enclosures):

Ms. S.!C.' Black, Assistant Director

,z for Projects TVA Projects Division.

U.S.LNuclear Regulatory Commission 1,1

  1. s

. One White Flint, North _-

cy 11555 Rockville Pike'

~

Rockville,' Maryland ~ 20852

.Mr. B. A.-Wilson, Assistant Director

,i P W ifor~ Inspection Programs-

TVA Projects Division-U.S. Nuclear Regulatory Commission

.i RegionJII T

10leMarietta Street, NW, Suite 2900-LAtlanta, Georgia 30323 NRC Resident I'nspector-

'Sequoyah Nuclear Plant J

~2600 Igou Ferry _ Road.

~37379 Soddy. Daisy, Tennessee e

L t

b 4)

l 8

,I

?

'(

'},

v,

)

n, 3

r i;.

+ >

k

.; i.

f. :c i

y 4:

L.

' ENCLOSURE t -c.

..y

>- } s'

. REACTOR' VESSEL MATERIAL SURVEILLANCE L.,

- PROGRAM FOR SEQUOYAH UNIT 2:. ANALYSIS

.)'

0F CAPSULE D' (B25.' 900125. 002) m

. ]

J

f..

I

\\

4 4

)

k

.f l

l

.s