ML20006E242
| ML20006E242 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 02/12/1990 |
| From: | Michael Ray TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20006E243 | List: |
| References | |
| NUDOCS 9002220401 | |
| Download: ML20006E242 (3) | |
Text
gy. : 7.;
s y
z h
a-
+'
4,
.J i> utr s
TENNESSEE VALLEY AUTH'ORITY:
CH ATTANOOGA. TENNESSEE 37401 SN'1578 Lookout' Place-Qg i
LLS. Nuclear Regulatory Commission
-- ATTN : Document Control Desk Hashington,-D.C. '20555 i
Gentlemen:
m In;the Matter-of
)
)
Docket No. 50-328 Tennessee Valley Authority SEQUOYAH NUCLEAR PLANT (SQN) UNIT.2 - ANALYSIS OF REACTOR VESSEL IRRADIATION.
CAPSULE U 1
Enclosed is the final report, prepared by Southwest Research Institute,-on-testing of :the subject reactor vessel specimen that was removed during the SQN UnitL2 Cycle 3 refueling outage.
The measured fluence rates for' Cycle 3 are approximately-38 percent ' lower than the fluence rates reported for Cycles 1 and= 2 because of the use of a low-leakage core configuration.
This report is being submitted in.accordance with Technical Specification 3/4.4.9 and-t
'l 10 CFR 50,. Appendix H.
'TVA has conducted a review of'the_ enclosed report and determined that the projected material toughness for operating through'32 effective full power
. years is-supported by the data.
Based on the test results, the SQN Unit 2 reactor vessel can be expected-to operate for its design life without exceeding material toughness criteria.
Please direct questions concerning this issue to Bruce S. Schofield at (615) 843-6172.
Very truly yours, TENNESSEE VALLEY AUTHORITY
\\
G
- Manager, uclear Litehsing and Regulatory Affairs L
Enclosure cc:
See page 2 9002220401 900212 u
PDR ADDCK 05000328 P
PNU
/)d68 An Equal opportunity Employer
/[/
peg y
s -
w.
1.
m.
, 1.
?
- y L
- g.
O.S.[;Nucleat: Regulatory Commissioni cc (Enclosures):
Ms. S.!C.' Black, Assistant Director
,z for Projects TVA Projects Division.
U.S.LNuclear Regulatory Commission 1,1
- s
. One White Flint, North _-
- cy 11555 Rockville Pike'
~
Rockville,' Maryland ~ 20852
.Mr. B. A.-Wilson, Assistant Director
,i P W ifor~ Inspection Programs-
- TVA Projects Division-U.S. Nuclear Regulatory Commission
.i RegionJII T
10leMarietta Street, NW, Suite 2900-LAtlanta, Georgia 30323 NRC Resident I'nspector-
'Sequoyah Nuclear Plant J
~2600 Igou Ferry _ Road.
~37379 Soddy. Daisy, Tennessee e
L t
b 4)
- l 8
,I
?
'(
'},
v,
)
n, 3
r i;.
+ >
k
.; i.
- f. :c i
y 4:
L.
' ENCLOSURE t -c.
..y
>- } s'
. REACTOR' VESSEL MATERIAL SURVEILLANCE L.,
- PROGRAM FOR SEQUOYAH UNIT 2:. ANALYSIS
.)'
0F CAPSULE D' (B25.' 900125. 002) m
. ]
J
- f..
I
\\
4 4
)
k
.f l
l
.s