Provides Addl Info to 891129 Response to Generic Ltr 89-10, Safety-Related Motor-Operated Valve Testing & Surveillance. No safety-related motor-operated Valves Required to Be Operable W/Plant in Defueled Condition
ML20006E117
Person / Time
Site: Rancho Seco
Issue date: 02/01/1990
From: Keuter D
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
AGM-NUC-90-027, GL-89-10, NUDOCS 9002220078
Download: ML20006E117 (1)


Text

-

k r

)

-e SACRAMENTO MUNICIPAL UTluTY DISTRICT D P. O nox 1583o, Sacramento CA is952,

2 3211 4

AN ELECTRIC SYSTEM SERVING ME HEA d

ORNIA =

.AGM/NUC 90-027

.: ih February 1,i990 h,

.{

l U. S. Nuclear Regulatory Commission

~ Attn:

J. B. Martin, Regional Administrator Region V

-1450 Maria Lane, Suite 210

~Halnut Creek, CA 94596 Docket No. 50-312 Rancho Seco Nuclear Generating Station License No.-DPR-54

-s NRC GENERIC LETTER 89-10, SAFETY-RELATED MOTOR-OPERATED VALVE TESTING AND SURVEILLANCE-

Reference:

Letter No. AGM/NUC 89-253, Dan R. Keuter to J. B. Martin, Regarding Deferral of Commitments, dated November 29, 1989

Dear Mr. Martin:

i By our. letter of November 29, 1989 referenced above, we responded generally that.for systems required for-cold shutdown and the SAFSTOR decommissioning mode, Rancho Seco meets the requirements of Generic Letter 89-10 regarding safety-related motor-operated valve testing and surveillance.

To supplement our previous general response, we are providing this additional information pertaining.to the Generic Letter.

Hith the plant 'defueled, we have no safety-related motor-operated valves

' required to be OPERABLE in the. current plant' condition. As such, we consider the requirements of Generic Letter 89-10 to be no longer applicable to Rancho 4

Seco.

1 Members.of your staff with questions requiring additional-information or clarification may contact-Steve Rutter at (209) 333-2935, extension 4911.

Sincerely, WYklYr f

Dan R. Keuter y

Assistant General Manager

Nuclear

^

pbh cc:

A. D'Angelo, NRC, Rancho Seco i {0 6

j Document Control Desk, Washington DC hed 900222007e 900201 I @2 P

DR ADDCK 0500 2

nRANCHO SECO NUCLEAR GENERATING STATION O 1444o Twin Cities Road, Herald, CA 95638-9799;(209) 333 2935 m