Summary of 900131-0202 Meeting W/Numarc & Owners Groups to Resolve Outstanding Issues Re Development of New STS Chapter 3.6 Re Containment Sys.Forwards Draft NUREG Re Improvements to Tech Spec Surveillance Requirements.W/O Encl
ML20006D400
Person / Time
Issue date: 02/06/1990
From: Lobel R
Office of Nuclear Reactor Regulation
To: Calvo J
Office of Nuclear Reactor Regulation
References
NUDOCS 9002130150
Download: ML20006D400 (2)


Text

.f.

Tebruary 6,1990 MEMORANDUM FOR: Jose A. Calvo, Chief Technical Specifications Branch Division of Operational Events Assessnent, NRR FROM:

Richard M. Lobel, Section Chief Special Projects Section Technical Specifications Branch Division of Operational Events Assessment, NRR

SUBJECT:

PRELIMINARY MINUTES OT ONGOING MEETING WITH OWNERS GROUPS TO RESOLVE OUTSTANDING ISSUES RELATED TO NEW STS CHAPTER 3.6 CONTAINMENT On January 31 and February 1-2, 1990, the NRC staff met with NUMARC and the Owners Groups to resolve outstanding issues related to the development of the new Standard Technical Specifications (STS) Chapter 3.6 on Containment Systems.

Review and resolution of issues was completed for all PWR submittels with few open issues. Review and resolution of issues was comnenced for the BWR submittal and will be completed during the week of February 5, 1990.

Final meeting minutes will be disseminated upon completion of the EWR review.

On February 2,1990, the Owners Groups and licensees of Lead Plants involved in the development of the new STS were provided copies of the draft NUREG report on " Improvements to Technical Specifications Surveillance Requirements". A copy of the report (enclosed) is also being placed in the Public Document Room (PDR). These actiuns are consistent with the guidance set forth in exception (4) of NRR Office Letter 106, Revision 1

" Release of NRC Draft or Predecisional Docurents and Information." The Owners Groups will incorporate the NRC staff reconnendations of the report into the new STS prior to its completion in mid-1990. The reconnendations of this report and the new STS will both require the approval of NRC management and the Connittee to Review Generic Requirements (CRGR)priortopublication.

It was explained to the industry representatives at this meeting that the report is predecisional and is therefore only for their use in preparing the new Standard Technical Specifications.

It cannot be used as a basis for plant specific changes to Technical Specifications until its approval by NRC management and CRGR, 63 lirffn'aI Shntd By Richard M. Lobel, Section Chief o

L

,o@hj Special Projects Section Technical Specifications Branch oDo.

$5 Division of Operational Events Assessment, hRR

',N

Enclosure:

As stated g

/Q7 oc DISTRIBUTION:

N Please see attached

}O ) < (l)[,

a

,j-p,cG g@

DOCUMENT NAME: MEMO PRELIN MINS CONTAIN B0BT L

(D\\

a e

OTSB:00EA:NRR 07SB:00EA:NRR OTSB:D0EA:NRR

,gl [,

OITRTjader:pmc

/$MReinhart RMLobel 02/ (, /90 02/6 /90 02/h/90 k

kh i

T.

n e'

r DISTRIBUTION: (withoutenclosure)

F Itmurley JHConran PDR (with enclosure)

I' JH5niezek CHBerlinger OTSB Members FJMiraglia CJHaughney OTSB R/F

'DMCrutchfield JLieberman 00EA R/r SAVarga BDLiaw

. Contra 1111es,;79 CERossi JWRoe GClainas ELJordan FJCongel CIGrimes FPG111espie WGKennedy Regional Administrators, 1. 11, III, IV, Y BKGrimes MGMalsch-GMHolahan ACThadani JGPartlow JERichardson JACalvo s

1 i

)

h i

I i

1