ML20006D131
| ML20006D131 | |
| Person / Time | |
|---|---|
| Site: | Trojan File:Portland General Electric icon.png |
| Issue date: | 01/30/1990 |
| From: | Yundt C PORTLAND GENERAL ELECTRIC CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| CPY-035-90, CPY-35-90, NUDOCS 9002120134 | |
| Download: ML20006D131 (1) | |
Text
V
.I O
6 Wg Te
-)
Portland General Electric Company Trojan Nuclear Plant January 30, 1990 71760 Columbia River liwy CPY-035-90 Rainier, Oregon 97048 (503) $$6 3713 U.S. Nuclear Regulatory Commission Document Control Desk Washington DC 20555 Gentlemen:
221d 1.1 Resort Trojan Technical Specification (TTS) 3.7.9, " Penetration Fire Barriers" Limiting Condition for Operation (LCO) requires submittal of a special Report if a 3-hour ftre barrier is nonfunctional.for greater than 7 days..
On December 31, 1989, Fire Door No. 73, located in the Control Building 93 foot elevation (entry to the Control Roon Vestibule), became inoperable due to a failure in the door latch mechanism. The latch mechanism is in the door's emergency opening hardware assembly (commonly called a "Penic" or " Crash" bar) and parts were not readily available for this.installa-tion. Parts are on order and will be installed when received.
p^
'The compensatory measures of TTS 3.7.9 (checking local smoke dotectors and establishing a hourly fire patrol) were established se required.
L Sincerely, Dhh.1k l
r E P. Yundt Genersi Manager
- b Trojan Weolear Plant L
c1 Mr. John B. Martin I
Regional Administrator, Region Y l
U.S. Nucioar Regulatory Commission Mr. David Stewart-Smith i
State of Oregon
?
Department of Ene'rgy Mr. R. C. Barr i;
USNRC Resident Inspector l
Trojan Nuclear Plant i
/p?
- n21ggg gnjjp g
~. -
-