Special Rept:On 891231,Fire Door 73,located in Control Bldg at 93-ft Elevation,Inoperable Due to Failure in Door Latch Mechanism.Parts Will Be Installed When Received.Local Smoke Detectors Checked & Fire Watch Patrol Established
ML20006D131
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 01/30/1990
From: Yundt C
PORTLAND GENERAL ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CPY-035-90, CPY-35-90, NUDOCS 9002120134
Download: ML20006D131 (1)


Text

V

.I O

6 Wg Te

-)

Portland General Electric Company Trojan Nuclear Plant January 30, 1990 71760 Columbia River liwy CPY-035-90 Rainier, Oregon 97048 (503) $$6 3713 U.S. Nuclear Regulatory Commission Document Control Desk Washington DC 20555 Gentlemen:

221d 1.1 Resort Trojan Technical Specification (TTS) 3.7.9, " Penetration Fire Barriers" Limiting Condition for Operation (LCO) requires submittal of a special Report if a 3-hour ftre barrier is nonfunctional.for greater than 7 days..

On December 31, 1989, Fire Door No. 73, located in the Control Building 93 foot elevation (entry to the Control Roon Vestibule), became inoperable due to a failure in the door latch mechanism. The latch mechanism is in the door's emergency opening hardware assembly (commonly called a "Penic" or " Crash" bar) and parts were not readily available for this.installa-tion. Parts are on order and will be installed when received.

p^

'The compensatory measures of TTS 3.7.9 (checking local smoke dotectors and establishing a hourly fire patrol) were established se required.

L Sincerely, Dhh.1k l

r E P. Yundt Genersi Manager

b Trojan Weolear Plant L

c1 Mr. John B. Martin I

Regional Administrator, Region Y l

U.S. Nucioar Regulatory Commission Mr. David Stewart-Smith i

State of Oregon

?

Department of Ene'rgy Mr. R. C. Barr i;

USNRC Resident Inspector l

Trojan Nuclear Plant i