Text
LM
.i 2c.2 l
- [""%
J.
,; fi (
.E NUCLEAR REGULATORY COMMISSION
[
o;j WASHINGTON, D. C. 20$$$
l
' foy.....,/ "
January 31, 1990 f;
i 4 Docket110. 99901066/89-01-.
L'"
Mr. Martin Hunt i
Quality Assurance Manager e
m Rotork Controls, Limited Bath, England.
BA1 3JQ.
l
Dear Mr. Hunt:
This letter addresses the inspection of your facility at Bath, England
~
conducted by. Messrs. Edward Baker and Uldis Potapovs on October 9-10, 1989,
-and the discussion of their findings with you and other members of your staff at the conclusion of the inspection.
The,) purpose of the inspection-was to review portions of your Quality Assurance' s
(QA program related to the. production.and supply of actuator parts and
-actuators to the commercial nuclear industry in the United States of America.-
.i
- During the inspection it was found that the implementation of your QA program failed to meet certain NRC requirements that were imposed on Rotork Controls,
>: Limited by contract.- While the inspectors found that assembly.ard testing-o activities conducted in your facility were well controlled, the inspectors determined that Rotork's QA program was not adequately controlling subcon-tractor's. performance.
Rotork's QA program does not assure that _ subcontractors
.are ' effectively implementing their QA programs. This has resulted in problems-with nonconformino or indeterminate hardware, drive pins, wormshafts, 0-rings, and, terminal blocks.. These issues are discussed in more detail in the enclosed report.
During this inspection it was found that:the implementation of your.QA program i
failed to meet certain NRC requirements. The specific findings and references
~
_to.the pertinent requirements are identified in the enclosures to this letter.-
t 1
1
- Please provide us within 30 days from the date of your receipt of this letter a 0
written statement containing:
(1) a description of steps that have been or
,will be taken to correct these items; (2) a description of steps that have been l=,
or will be.taken to prevent recurrence; and (3) the dates your corrective _
' actions and preventive measures'were or will be-completed. We will consider 1
extending the response time if you can show good cause for us to do so.
I The-response requested by this letter is not subject.to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.
l u
Y t
W i
j' l
s i
~Nr.MartinHunt 2
. January 31, 1990 i
V 1
In 'accordance with 10 CFR 2.790 of the Commission's regulations, a copy of' this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.
Should you have any questions concerning this inspection, we will be pleased 6
to discuss lthem with you.
Sincerely, Original Si:r) by Gus C. Lainas, Acting Director-Division of Reactor Inspection and Safeguards Office of Nuclear Reactor Regulation
Enclosures:
1.
Appendix A. Notice of Nonconformance 2.
Appendix B. Inspection Report 99901066/89 01 DISTRIBUTION
' epockettcontrol/RIDStCoderlE:09' 5
VIB Reading-.
i UR15 Rt.ading BKGrimes EWBrach--
ETBaker UPotapovs RHauber,-GPA
!.4 i.
- Previously concurred L,0FC..:C:RI5-1:VIB*
- C:VIB:DRI5*
- AD RI5:NRR*
j......:...............:..............:............:...............:..............:.............
l-NAME
- ETBaker:nrp
- EWBrach-ainas
!'DATE- :01/16/90
- 01/24/90
- 01/25/90 OFFICIAL RECORD COPY.
Ap#a
~ Document Name: MARTIN HUNT LETTER 1.
1 1
+
~t t
- ~
t 0
- - - - - -