Forwards Amend 124 to License DPR-40 & Safety Evaluation. Amend Adds Operating Mode Number for Each Operating Mode in Tech Spec Table 3-4 & Incorporates That Water Testing & Analysis Not Required When Total Core off-loaded
ML20006C603
Person / Time
Site: Fort Calhoun 
Issue date: 01/31/1990
From: Bournia A
Office of Nuclear Reactor Regulation
To: Morris K
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML20006C604 List:
References
TAC-75376, NUDOCS 9002080277
Download: ML20006C603 (3)


Text

-

~

Docket No. 50-285 Mr. Kenneth J. Morris Division 14anager - tiuclear Operations Omaha Public Power District 1623 Harney Street Omaha, Nebraska 68102

Dear fir. Norris:

SUBJECT:

FORT CALHOUN STATION, UNIT tt0.1 - AMENDMENT 110. 124 TO FACILITY OPERATitlG LICENSE NO. DPR-40 (TAC NO. 75370 The Comission has issued the enclosed Amendment flo.124 to Facility Operating

' ' cense fio. DPR-40 for the fort Calhoun Station, Unit No.1.

This amendment consists of changes to the Technical Spcifications in response to your application dated December 1,1989.

The amendment edes an operating mcde number for each c.eratir.g mode in Table 3-4 of the Technical Specifications.

In acidition in the Refueling Shutdown mode, when fuel is in the core, a water sampling and analysis is required. However, when the total core has been off-loaded, this amendment incorporates that water testing and analysis is not required since there is no fuel in the core.

A copy of our related Safety Evaluation is enclosed. The notice of issuarice will be included in the Commission's next biweekly Federal Register notice.

Sincerely, original signed by:

Anthony Bournia, Project thiager Project Directorate IV Division of Reactor Projects - III, IV, V and Special Prciects Office of Nuclear Reactor Regulation

Enclosures:

1.

Amendirent flo 124 to DPR-40 t<

g 2.

Safety Evaluation cc w/ enclosures:

gy See next page moa 58 DISTRIBUTION:

on TUCCRet F1Te-NRC PDR Local PDR PD4 Reading "O

G. Holahan ADR4 F. Hebdon P. Noonar Q

A. Bournia (2)

OGC-Rockville D. Hagan E. Jordan No G. Hill (4)

Wanda Jones J. Calvo PD4 Plant File 80 ACRS (10)

GPA/PA ARM /LFMB g

ex

  • See previous concurrence I

ha DOCUMEt4T NAME: FT. CALHOUN 75376 O\\

PD4/Qg)i

\\\\\\

  • PD4/LA
  • PD4/PM
  • 0GC-Rockyi11e FHebdol PNoonan ABournia:

01/11/90 01/11/90 01/23/90 01/ai/90

\\

3

-.;- n.

1x s, s..

,.t q;

~ 1 4e* 8844, 6

4

- g 8( ~* '

j9,

' UNITED sTATT..t C

NUCLEAR REGULATORY COMMISSION.

i

[

WASHINGTON. D. C. 20565

-l

'1 %

January 31, 1990

  • ..+

t Docket No. 50-285:

H

-Mr.1 Kenneth J. Morris Division Manager - Nuclear Operations

.0maha.Public' Power District 1623.Harney Street Omaha, Nebraska 68102 1

Dear Mr. Morris:

TORT CALHOUN STATION, UNIT NO. 1 - AMENDMENT I40.124 TO FACILITY f

SUBJECT:

~ OPERATINGLICENSENO.DPR-40(TACNO.75376) f L

The Comission has issued the enclosed Amendment No.124 to Facility Operating o

. License No.'DPR-40 for the Fort Calhoun Station, Unit No. 1.

This amendment W

' consists of changes to the Technical Specifications in rer.,ponse to your iapplication dated December 1, 1989.

+

The ama dment adds an operating mode number for each operating mode,in Table'3 4 of the Technical Specifications.

In addition,.in the-Refueling j

Shutdown mode, when fuel is' in the core, a water sampling and analysis-is-

>1 required.

However, when the total core has been off-loaded.- this amendment H

incorporates thtt this water testing and analysis is not. required since there j

L is no fuel in the core.

J l

.A copy of our related Safety Evaluation is. enclosed. The notice of' issuance 1

Lwill be included in the Commission's next biweekly Federal' Register notice, j

y

-Sincerely, j

%1 eu.AS4A Anthony Bournia, Project Manager Project Directorate IV 1

_m*a' Division of Reactor Projects - III, IV,-V and Special: Projects Office of-Nuclear Reactor Regulation.

.)

Enclosures:

j 1.

Amendment No.124 to DPR-40 i

4

~ 2.

Safety Evaluation j

_cc w/ enclosures:

I

See'next page n

i?

fu.

il

I 1:,

Mr.# enneth J. Morris Fort Calhoun Station--

K Omaha-Public Power District Unit No. 1 -

cc:

W Harry H. Voigt,- Esq.

. LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, NW Washington; 9.C.

20036 N

Mr. Jack 44t.sen;JChairman Washington County Board of Supervisors Blair, Nebraska 68008 Mr. Phillip Harrell, Resident Inspector

.U.S. Nuclear Regulatory Comission

~

P. O. Box 309-Fort.Calhoun, Nebraska 68023-Mr. Cherles B.' Brinkman, Manager

Washington Nuclear Operations Combustion Engineering, Inc.

12300 Twinbrook Parkway, Suite 330 Rockville, MD 20852

. Regional' Administrator,. Region IV U.S. Nuclear Regulatory Comission Office of Executive Director for Operations 611 Ryan Plaza Drive, Suite 1000

' Arlington.) Texas-76011 Harold Borchert, Director Division of-. Radiological _. Health.

Departnent of Health.

'301 Centennial Mall, South P.O. Box-95007 Lincoln. Nebraska 68509 Mr. G. R. Peterson, Manager Fort Calhoun Station-P. O. Box 399 Fort-Calhoun.. Nebraska 68023