ML20006C525

From kanterella
Jump to navigation Jump to search
Expresses Appreciation in Assuring That Promised Info Re Listed Action Items,Received by 900215,to Support Preparation of Rept Documenting Accomplishments of Project
ML20006C525
Person / Time
Issue date: 01/30/1990
From: Dennig R
NRC OFFICE FOR ANALYSIS & EVALUATION OF OPERATIONAL DATA (AEOD)
To: Will Smith
NUCLEAR ENERGY INSTITUTE (FORMERLY NUCLEAR MGMT &
References
NUDOCS 9002080167
Download: ML20006C525 (2)


Text

hh 2hasi kN g-

, ]M@l 1

UNITED STATES.

4 9

W

-n1 NUCLEAR RE2ULATORY COMMISSION f,

J ' Jt p

wAsHmoToN, D. C. 20666

.t L

~Mr.' Walter Smith i

R_

-Operations and Management Support Services

. Nuclear Management Resources Council

~

-1776 Eye Street, N.W.

Washington. D. C. 20006-2496 l

m-

Dear Mr. Smith:

5 m~

l,

' Below'is a list of. action ite.ns agreed upon by individual ' utilities in the Maintenance Indicator Demonstration Project.

Li (1)-

Southern. California Edison Company (SCE) will review the specific list.

l u

L<,

of equipment monitored by the NRC staff's proposed maintenance indicator.

f'

'for. San Onofre Units 1, 2, and 3 and designate those components that based on SCE's RCM, would be maintained by corrective maintenance only L'

'and would result in a-degraded failure report to NPRDS.

o

+

P

-(2)

.SCE will' provide the component selection methodology and scarch strategy for CFAR analysis.-

.(3)

Rochester Gas and Electric Corporation (RG&E) will prepare a list of.

M equipment, based on their experience with reliability-centered maintenance,:that'in_their veiw should'be monitored with the NRC's

+

proposed maintenance ~ indicator'during the 18-month trtal period.

(4)

. RG8E will1 furnish. two years.of component data for-each of the twelve systems' analyzed toidate within the Ginna Reliability-Centered

~ Maintenance Program.-

(5)-

Duke Power Company will provide information.on their maintenance r

organization (responsibilities for equipment classes), examples of.

failure' trend reports and FAT output, and a method for using CFAR as a trending tool.

'(6)

Although the matter was only discussed during our meeting with Duke Power, we also need. descriptions of the corporate and site maintenance 1

and-maintenance' support' organizations from the other five utility-

_ participants.

In this sense, the.. term " maintenance" refers to the broader definition stated in'the Commission's Maintenance Policy Statement (e.g., shows the relationship to engineering).

y V

YY i</

((

9 ER 6

i mem ess c0W fY r

yy w

'S' s

utwc.

ne;g r.

-r

'JAN 8 01990 i

ur 4

l 10 2-r.

h.

',LWe would appreciate your assistance in assuring that we receive. the promised -

q informatien;by February 15,.1990 to support preparation of our report

- docunenting = the. accomplishments of 'the project..

Sincerely yours, n

Robert L. Dennis, Chief Trends and Patterns Section Trends and Patterns Analysis Branch

+

Office for Analysis and Evaluation s

'of Opc-rational Data-cc:

Tom Tipton,-NUMARC Nikel'Rodin, SCE Thomas.Marlow, RG&E Paul Kuhel, Ceco-Joel Dimmette, SERI o.

' Tom Dente, Northeast Utilities 1

Wayne-Hallman, Duke Power-Jay Wells, INPO Gary Fader, INP0

.\\

Distribution:

' Central File-

.TPAB RF' TNovak VBenaroya MW1111ams RDennig-o

~ PO'Reilly; l

PDR

.x 3

i k...h

'0FC :TPA Q:T

.NAME]: PORE 111y:gep:RDennig

,DATEL: 1/3990'

.:i/)e/90 OFFICIAL-RECORD COPY

[-

2 _..