Forwards Schedules & Assignments for Emergency Operating Procedures Insp at Plant
ML20006B479
Person / Time
Site: Callaway Ameren icon.png
Issue date: 01/18/1990
From: Hasse R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Hopkins J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 9002020273
Download: ML20006B479 (12)


Text

+

i i ;;

3

  • ~

4 JAN 18.1993 r

MEMORANDUM'FOR:

J.-A.' Hopkins DRS, RIII C. H.' Brown, RI, Callaway J. Sears, COMEX q

B. Paramore, SAIC

+

FROM:

R. A.'Hasse, DRS, RIII

SUBJECT:

'E0P' INSPECTION AT CALLAWAY-1 r

Attached are the schedules and assignments for the subject inspection. The

[

Resident Inspector (RI) will not be:available to participate during.the first week of the inspection. This will increase the number of desktop reviews to.

.. j be done by the other team members.

I have tried to compensate for this by assigning several of the more time consuming field walkdowns.to the RI which can be done during the second week.

Original signed by R. A Hasse' i

R. A. Hasse Team Leader Attachments: As stated-cc:

R. L. Hague M. P. Phillips i

+

9002020273 900118 ADOCK0500g3 DR BIII yIb

,R J

-Iasse/cg P

ips

/fIgue sl M\\ %

(

l8,01,

m

".1 a

e' s

"o v.:,

SCHEDULE i

Monday January 22', 1990 Leave s tel - 7:002.m.

Arrive at site - 8:00a.m..

I Badging

. 8:00a.m.'

'10:00a.m.

[

Entrance - 1:30p.m. ORC conference room

- Team ~ meeting '10:30a.m.

Schedule walkdowns and-interviews -

r 1

Start desktop -

-Leave for motel - 4:30p.m.

3 Normal Daily Schedule Breakfast --6:45a.m.

Leave motel - 7:30a.m.

Leave for motel - 4:30p.m..

Monday and Tuesday' January'29 and January 30 I

leave motel - 6:15a.m.

Simulator Scenarios -~ 7:00

'11:00a.m.

-Leave for motel - 3:30 p.m.

Friday 2/2

i Exit - 9
00a.m.

Leave site'- 10:00a.m.

~ Licensee schedules 1

Staff.- approximately 7:00a.m. - 3:30p.m. (Flex schedule) 7 Shift-~- 7:00a.m. - 3:00p.m.

Saturday 1/27 l

To be-scheduled-t Activity Schedule Desktop-- January.22 - 27 Incerviews January 24 - 29 CR and field walkdowns; - January 26-31 V&V; QA; -

Scenario validation - 1/24 (10:00a.m.).

Simulator exercises - January 29 and 30 (7:00 - 11:00a.m.)

Licensee debrief - February 1 Exit - February 2 l

ASSIGNMENTS Hasse:

Desktop; V&V;.QA; Training (if necessary); Post accident radiation levels; Scenario observations.

Hopkins:

Desktop; Control Room and plant walkdowns; Administer simulator I

exercises; Simulator validation.

Sears:

Desktop; Control Room and Plant walkdowns; Simulator i

observations.

Paramore:

Hunan factors analysis of procedures; Writers guide; Field and control room walkdowns; Simulator observations; Interviews; V&V.

Brown:

Field walkdowns; Simulator observations (as desired).

i l

3 E

DATES-12/19/89 UNION ELECTRIC COMPANY' PAGE:

1 i

TIME: 15:14:55' DOCUMENT _. CONTROL. SYSTEM

.ARDC5931 i

CALLAWAY PLANT PROCEDURE INDEX

~

CSF PROCEDURE NUMBER'/

TITLE RESPONSIBLE DEPARTMENT

hkS5t; CSF-01

. OPERATIONS

, CRITICAL SAFETY FUNCTION STATUS TREES k

t 8

1 r

P f

\\

-1

i

'i

,' s u-.

l DATE :12/19/89' UNION ELECTRIC COMPANY PAGE:

1 l

' TIME:'15:15:27 DOCUMENT CONTROL SYSTEM

.ARDC5931 CALLAWAY PLANT PROCEDURE INDEX j

E-0 i

PROCEDURE NUMBER /

TITLE RESPONSIBLE DEPARTMENT

?

't' -

e f\\tfi(.g (13 OPERATIONS E-0 REACTOR TRIP OR SAFETY INJECTION i

l 4

t f+

f

(

t

-l

(

y

(,

-(

[,

c4 -

DATE
?12/19/89 UNION ELECTRIC COMPANY PAGE:

1

'J TIME: 15:15:27 DOCUMENT CONTROL' SYSTEM ARDC5931 CALLAWAY. PLANT PROCEDURE INDEX E-1 s

PROCEDURE NUMBER /

TITLE RESPONSIBLE DEPARTMENT b

E-1 OPERATIONS

' g.tS 3 LOSS OF REACTOR OR SECONDARY COOLANT 1

4 h

'N$D 4

Y l~

i

n, D ATE s 12/19/89-LUNION ELECTRIC' COMPANY PAGE:

1

' ' ' TIME :15:15:27' DOCUMENT CONTROL SYSTEM ARDC5931 CALLAWAY PLANT PROCEDURE INDEX.

i

'E-2 PROCEDURE NUMBER /.

TITLE RESPONSIBLE DEPARTMENT ih\\k55(L,

E-2 OPERATIONS FAULTED STEAM GENERATOR ISCLATION r

a 4

o t

-(::

m i

7, l

a.

p 1

..4..

_ DATER 12/19/89L UNION. ELECTRIC COMPANY PAGEi-1 TIME: ~ 15:15:27 DOCUMENT CONTROL SYSTEM ARDC5931 n'+.

CALLAWAY PLANT PROCEDURE INDEX L.

E-3 a

+

PROCEDURE NUMBER /

TITLE RESPONSIBLE DEPARTHENT'

!.Ig(zg c.

E-3 5 OPERATI0tlS STEAM GENERATOR TUBE RUPTURE s

t

. h k

I p.

l '

1 l

l-L 1

l-o.

v

"Y -

+:

I,.

[DATE:12/19/89 UNION ELECTRIC COMPANY-PAGE:

.I

-TIME:;15:15:16 DOCUMENT CONTROL SYSTEM ARDCS931

' ; (.....

'CALLAWAY PLANT PROCEDURE INDEX ES-PROCEDURE NUMBER /.

TITLE RESPONSIELE DEPARTMENT

\\k DITsIng ES-0.0 OPERATIONS J

.REDIAGNOSIS o.

.ES-0.1

' OPERATIONS REACTOR TRIP RESPONSE ES-0.2 OPERATIONS NATURAL CIRCULATION COOLDOWN I

ES-0.3'ik OPERATIONS'

= NATURAL CIRCULATION COOLDOWN WITH STEAM VOID. IN VESSEL (WITH RVLIS)

=

ES-0.4 OPERATIONS NATURAL CIRCULATION C00LDOWN WITH STEAM VOID IN VESSEL (W/0 RVLIS)

M.

.gigg p;g.

ES-1.1 OPERATIONS y

SI TERMINATION l

ES-1.2 OPERATIONS POST LOCA C00LDOWN AND DEPRESSURIZATION i

.2)

ES-1.3'kr OPERATIONS TRANSFER T0 COLD LEG RECIRCULATION ES-1.6 OPERATIONS

{

TRANSFER TO HOT LEG RECIRCULATION

.ggggg q

~ES-3.1 OPERATIONS POST-SGTR C00LDOWN USING BACKFILL

-(

ES-3.2 OPERATIONS i

POST-SGTR C00LDOWN USING BLOWDOWN ES-3.3 OPERATIONS POST-SGTR C00LDOWN USING STEAM DUMP

-t s

11 I

i-

!=

l 7

d g,

4:

.. ~ - i :

g

+d

DATE:llE/19/89 UNION ELECTRIC COMPANY' PAGE:

1

. p".

' TIME: 15:15:27-DOCUMENT-CONTROLtSYSTEM ARDC5931 t

CALLAWAY PLANTEPROCEDURE INDEX (fo ECA-PROCEDURE NUMBER /

TITLE RESPONSIBLE DEPARTMENT f

3 -(g pg '

ECA-0.0 N OPERATIONS

(

j LOSS OF ALL AC POWER

(.w M Mswn ny.ccou o hr win.in 3d ECA-0.1 10PERATIONS e

LOSS OF ALL AC POWER RECOVERY WITHOUT SI REQUIRED ECA-0.2 OPERATIONS LOSS OF ALL AC POWER RECOVERY WITH SI REQUIRED M

ECA-1.1 i(-

OPERATIONS

-hDTNh5 LOSS OF EMERGENCY COOLANT RECIRCULATION ECA-1.2-OPERATIONS LOCA OUTSIDE CONTAINMENT

29 i

$(

'?'

'ECA-2,14(

OPERATIONS y

UNCONTROLLED DEPRESSURIZATION OF ALL STEAM GENERATORS v3 y 'ECA-3.1 %

OPERATIONS SCTR WITH LOSS OF REACTOR COOLANT - SUBC00 LED RECOVERY DESIRED

=(

ECA-3J2 OPERATIONS 1

SGTR WITH LOSS OF REACTOR COOLANT - SATURATED RECOVERY DESIRED ECA-3.3 OPERATIONS-SGTR WITHOUT PRESSURIZER-PRESSURE CONTROL F

h

m l '

(,','

-?+[

.e h[ a DATE: 12/19/89 UNION ELECTRIC COMPANY PAGEs-I r

TIME: 15:12:25 DOCUMENT CONTROL SYSTEM ARDCS931 l

i g

CALLAWAY PLANT PROCEDURE INDEX FR-(

j n:f.;!iDURE WUMBER /

gg, q FR-C.I-M-OPERATIONS RESPONSE TO INADEQUATE CORE COOLING FR-C.2 OPERATIONS RESPONSE TO DEGRADED CORE COOLING FR-C.5 OPERATIONS RESPONSE TO SATURATED CORE COOLING 14~

FR-H.I OPERATIONS Y

RESPONSE TO LOSS OF SECONDARY HEAT $1NK 1-FR-H.2 OPERATIONS RESPONSE TO STEAM GENERATOR OVERPRES$URE FR-H.3 OPERATIONS RESPONSE TO STEAM OENERATOR HIGH LEVEL FR-H.4 OPERATIONS RESPONSE TO LOSS OF NORMAL STEAM RELEASE CAPABILITIES w

FR-H.S OPERATIONS l

RESPONSE TO STEAM GENERATOR LOW -LEVEL ggt FR-I.I OPERATIONS RESPONSE TO HIGH PRES $UkIE R LEVEL FR-1.2 OPERATIONS RESPONSE TO LOW PRESSURIZER LEVEL k'

FR-I.3 OPERATIONS RESPONSE TO V01D3 IN REACTOR VESSEL i

l FR-P.I OPERATIONS RESPONSE TO IMMINENT PRESSURIZED THERMAL SHOCK CONDITION I

FR-P.2 OPERATIOP!'

RESPONSE 10 ANTICIPATED PRESSURIZED THERMAL SHOCK C0tiOITION i

i f'

l

g., ~

p -

0, DATE: 12/19/89 UNION ELECTRIC COMPANY PAGE:

2 TIME:~15:12:25 DOCUMENT CONTROL SYSTEM ARDC5931 CALLAWAY PLANT PROCEDURE INDEX PROCEDURE NUMBER /

TITLE RESPONSIBLE DEPARTMENT l-3 Qf $

FR-S.1 #

OPERATIONS

r.

RESPONSE TO NUCLEAR POWER GENERATION FR-S.2 OPERATIONS L

RESPONSE TO LOSS OF CORE SHUTDOWN 3

FR-Z.1 OPERATIONS RESPONSE 10 HIGH CONTAINMENT PRESSURE FR-Z.2 OPERATIONS RECPONSE TO HIGH CONTAINMENT RECIRC SUMP LEVEL FR Z.3 OPERATIONS RESPONSE TO HIGH CONTAINMENT RADIATION LEVEL M

Qkhh b DI

[b) hDkD O.hkb$

h" C Ww%how n By G e gw n snA 9% cwt ^ ort on I/30 1 L'.b4t4-3',0% 9 ).

i

.