TOLEDO EDISON Docket Number 50-346
, 3,,,,,, w,,,
License Number NPF-3 DONALD CL SHELTDN Serial Number 1762
$[l7l$$*" ~
1 January 29, 1990 l'
United States Nuclear Regulatory Commission NRC Document Control Desk Washington, D. C.
I
Subject:
Revision 10 to the Updated Safety Analysis Report Gentlemen:
The Toledo Edison Company is submitting, pursuant to 10CFR50.71, one (1)'
original plus ten copies of Revision 10 to the Updated Safety Analysis Report (USAR) for the Davis-Besse Nuclear Power Station, Unit Number 1.
+
USAR, Revision 10 is an interim submittal, the purpose of which is limited to incorporation of comments made by the NRC during the review of Revision 9 to i
USAR Section 17.2.
These changes were discussed-vith members of the NRC staff on-October 19, 1989 and November 14, 1989. provides a summary I
description of the changes.
Certain changes made in Revision 9 to the USAR should have been considered reductions in commitment by Toledo Edison and as such should have been reviewed by your staff prior to implementation.
These changes have been i
discussed with your staff, found to be acceptable and concurrence was given pending review of this submittal. also summarizes these changes.
i Please insert Revision 10 material, dated January,-1990 into the Updated Safety Analysis Report per the attached instructions (Attachment 3).
I Should you require additional information-concerning this matter, please contact Mr. R.
V.~ Schrauder, Manager - Nuclear Licensing at (419) 249-2366.
Very tr
- yours, h
JCS/ssg 9002020198 900129 PDR ADOCK 05000346 h
Attachments K
PDC J
/
P. M. Byron, DB-1 NRC Resident Inspector
)\\\\
cc:
b T. V. Vambach, DB-1 NRC Project Manager A. B. Davis, Regional Administrator, NRC Region III THE TOLEDO EOISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO, OHIO 43652
~,.-
'D'ock t Nu:bar 50-346
't
.Licens3 Nu2ber NPF-3_
Serial Number 1762 Page 1 i
i SUBMITTAL OF REVISION 10 l
.TO THE DAVIS-BESSE UPDATED SAFETY. ANALYSIS REPORT (USAR)
FOR DAVIS-BESSE NUCLEAR POWER STATION UNIT NO. 1 i
I Enclosed are the original-and 10. copies'of Revision 10 to the Davis-Besse i
Nuclear Power Station, Unit No. 1, Updated Safety Analysis' Report.
I I
By:
f M
D. C. Shelton, Vice President Nuclear
,j Sworn and subscribed before me this 29th day of January 1990.
- i Notary Pubfic, State of Ohio j
EVELYNLDRESS NOTARYPUBU0,STATEOF0H10 a
MyCommissionEgiresJd/2B,1994
. M.__M t-Docket ~ Number 50-346 License Number NPF-3 Serial Number 1762 Page 1 ATTACHMENT 2
SUMMARY
OF USAR REVISION 10 CHANGES No changes were made in Chapters 1 through 15.
Changes were made to Chapter 17 in response to NRC comments pertaining to Revision 9 of the USAR. The changes are as follows.
Revision 9 Change Revision 10 Change 1.
'Page 17.2-8, Manager - Engineering Assurance /
1.
The word " selective" has been deleted Engineering Programs. Revision 9 states that and the Engineering Assurance reviev.
Engineering Assurance. activities include the of procurement documents has been review of' selective procurement, documents.- The
' clarified as Nuclear Safety.
addition of the word selective-reduces a Related procurement documents.
commitment in the OA Program description.
NRC concurrence was given pending review-of this change.
2.
Page 17.2-21, Design: Package Review. Revision 9
. 2.
The vord " selectively" has been deleted states that design package development is selectively and the Engineering Assurance review of-
. monitored by Engineering Assurance. The addition of design package development has been the word selectively reduces a commitment inlthe
' clarified as Nuclear Safety Related QA Program description.
design packages. NRC concurrence was given pending review of this change.
3.
Page 17.2-21, Procurement Document Control. -Revision 9 3.
The allowance for an expedited deleted the allowance for an expedited procurement-procurement process to support unanticipated requirements has been process.
reinstated.
4.
Page 17.2-23, Procurement Document Review. Revision 9 4.
.The requirement to'have Engineering stated that the Engineering Department reviewed review and approve procurement-procurement documents but did not stipulate that they documents has been clarified.
i should also approve them.
g,
+ _
.m e
a_...wm.
-uam--
---"*.meman=%----**--'Ne'm
- " '^ - - * - ' " "
- Docket Nunber 50-346 Licensa Nu;ber NPF-3 Serial Number 1762 Page 2 Revision 9 Change Revision 10 Change 5.
Page 17.2-24, Instructions, Procedures and Drawings 5.
NRC approval was given'for removal of Reviev & Approval. Revision 9 deleted the requirement the requirement to perform 10CFR50.54 &
to perform 10CFR50.54 and 10CFR50.59 reviews for 10CFR50.59 reviews for changes to the changes to the Nuclear Quality Assurance Manual.
NOAM. Additionally, 10CFR50.54 is being This reduces a commitment in the QA Program description.
deleted as this CFR does not apply.
to the listed documents. NRC concurrence vas given pending review of the deletion of 10CFR50.54 reviews of the listed documents.
6.
Page'17.2-27, Restricted Documents. Revision 9 6.
Deleted item a.
incorporated the discussion of Safeguards documents into the first. paragraph last sentence, however, item a., control of Safeguard documents was not deleted.
7.
Page 17.2-28, Source Verification. Changes were made 7.
The Quality Assurance Department that created confusion as to who was to perform source is identified as performing source verification activities: (i.e., surveillances, ' audits, verification activities.
and inspections).
8.
Page 17.2-29, Acceptance of Services..The paragraph
- 8..
The paragraph discussing Toledo Edison's discussing Toledo' Edison's acceptance of services was acceptance of services has been deleted.- The deletion'of-methods used to accept reinstated in Revision 10 to the USAR.
services reduces a commitment in the.0A Program i
description. Although deleted in Revision 9!these activities continued to be performed.
9.
Page 17.2-31,. Procedures. Revision 9 deleted the
- 9..
Added clarifying sentence.
example ' listing of the possible contents of special process procedures. Also seen as redundant to discussion of qualifications of procedures,.
equipment & personnel in the first paragraph.
w m.y g
y
~
._...,__.,j
~
Docket Number 50-346 License Number NPF-3 Serial Number 1762 Page 3 10.
Page 17.2-43, 10CFR21 Reporting. Revision 9
- 10. -The requirement to notify Toledo Edison-deleted the commitment to have 10CFR21 Reports of vendor identified 10CFR21 Reports has__
sent to the QA Director. 'This deletion reduces a been reinstated. The Engineering--
commitment in the'0A Program description.
Department receives & reviews 10CFR21 Reports for applicability to Davis-Besse.
]
NRC concurrence was given pending review-of'this change.
l 11.
Page 17.2-17, General (discussion of design 11.
None. -This change does not deviate from package development). Revision 9 states that
'10CFR50 Appendix B, Reg Guide 1.64 or conceptual design. packages are developed if required.
ANSI.N45.2.11 as'they do'not require This change allowed the conceptual design to be development of a conceptual design vaived when determined appropriate by the package. Revision 9 change was responsible engineer & approved by his supervisor.
post-approved by the NRC.
The addition of the vording if required reduces a commitment-in tne QA Program description.
12.
Page 17.2-34. Inspection Reports. Revision 9
- 12. None. This change did not reduce the deleted the requirement for review of inspection requirement to have a technical adequacy reports by OC supervision. The deletion of the review performed by a Level II inspector, requirement to have OC supervision review or above, to ensure the technical inspection reports reduces a commitment in the adequacy of the inspection and the QA Program description.
acceptability'of the inspection results.-
The Revision'9 change was post-approved
~
by the NRC.
_ _ _ _ _ _