Ack Receipt of 891111 Petition Requesting Commission to Order Util to Meet Design & Safety Criteria of NRC
ML20006B133
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 01/24/1990
From: Murley T
Office of Nuclear Reactor Regulation
To: Beemon J
CONCERNED CITIZENS FOR THE CHARLEVOIX AREA
Shared Package
ML20006B134 List:
References
NUDOCS 9001310499
Download: ML20006B133 (2)


Text

January 24, 1990 i

DISTRIBUTION:

Docket No. 50-155

~ MIR T"7 TEN /incomiltrJonly GPA/PA (10CFR92.206)

NRC & LOCAL PDRs

^ ~ ' ' ' ' DMOSSBURG#0004982 EDO#0004982 PD31 R/ File EDO READING FILE VSTELLO Mrs. Jo Anne Bier Beemon TMURLEY/JSNIEZEK ASLAB President, Concerned Citizens JPARTLOW ACRS(10) for the Charlevoix Area GHOLAHAN ASLBP 204 Clinton Street JZWOLINSKI YYANEZ(2)

Charlevoix, Michigan 49720 JTHOMA RPULSIFER PSHUTTLEWORTH CCARTER

Dear Mrs. Beemon:

This letter acknowledges receipt of your petition dated November 11 1989, requesting that action be taken with regard to the Big Rock Point Plant.

Specifically, you request that the Commission order Consumers Power Company to meet all current NRC design and safety criteria for the Big Rock Point Plant and allege that the fe.cility currently does not meet these criteria.

Your petition has been referred to me pursuant to 10 CFR $2.206 of the Commission's regulations. As provided by Section 2.206, action will be taken on your request within a reasonable time.

However, a preliminary review of the concerns in your petition does not indicate any need to take immediate action as you request because Big Rock Point Plant is subject to the same regulations -

as all other nuclear plants and your petition does not reveal any new operational safety issues that pose an immediate safety concern for continued operation of the plant.

I have enclosed for your information a copy of the notice that is being filed with the Office of the Federal Register for publication.

Sincerely,

[0riginal signed by Frank P. Gillespie]

(f0d Thomas E. Murley, Director Office of Nuclear Reactor Regulation

Enclosure:

As stated A/PD31:DRSP

DRSP Rill (f@

31:DRSP TECH EDJTOR PSHUTTLEWORTH RU IFER WAXELSON JUI

h. y 1/pg/90 1//$ /90 1//7/90 1/ft/9 1/gq/90

/

PRA.

0GC M AD:DRS SPL JZWOLINSKI CMcCRACKEN RB HAM JGOLDBERG 1/e/9p 1////90 1/ /00 L

/90 1//5/90 0

)

R DD (47hl; P

if

@JPA LOW J

K TM EY dOLAHAN

/

/

90 1/

1 90 1/g7,/90 l

y 9001310499 900124 PDR ADOCK 05000153 P

PDC

1 1

6 e

' [p% E80

'o S

~,,

UNITED STATES g

NUCLEAR REGULATORY COMMISSION 5

E WASHINGTON, D. C. 20665 a,,

January 24, 1990 i

4 Docket No. ~ 50-155 (10 CFR 62.206)

Mrs. Jo Anne Bier Beemon i

President, Concerned Citizens for the Charlevoix Area 204 Clinton Street Charlevoix, Michigan 49720

[

Dear Mrs. Beemon:

This letter acknowledges receipt of your petition dated November 11, 1989,-

requesting that action be taken with. regard to the Big Rock Point Plant.

Specifically, you request that the Commission order Consumers Power Company to meet all current NRC design and. safety criteria for'the Big Rock Point Plant and allege that the facility-currently does not meet these criteria.

i Your petition has been referred to me pursuant to.10 CFR 92.205 of the Commission's regulations. As provided by-Section 2.206, action will be taken-on your request within a reasonable time.

However, a preliminary review of the concerns in your petition does not indicate any need to take immediate action as you request'because Big Rock Point Plant is subject to the same regulations as all other nuclear plants and your petition does not reveal any new. operational safety issues that pose an imediate. safety concern for continued operation of l

the plant.

I have enclosed for your information a copy of the notice that is l

being filed with the Office of the Federal Register for publication.

Sincerely, I-p O

L Thomas. Murle, Director g

Office of Nucl ar. Reactor Regulation

Enclosure:

As stated

)

-