Recommends That NRC Cancel Yellow Ticket 0899213 Re Proposed Tech Specs for Containment Purge & Vent Sys, Based on Util 900123 Request to Withdraw Proposed Amend Request.New Licensee Proposal Forthcoming
ML20006B104
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 01/24/1990
From: Jocelyn Craig
Office of Nuclear Reactor Regulation
To: Partlow J
Office of Nuclear Reactor Regulation
References
NUDOCS 9001310418
Download: ML20006B104 (1)


Text

_ _..

l C.

l

-(-

1 l

January 24, 1990

'HEMORANDUM FOR: James G. Partlow DISTR'BUTION o

l Associate Director for Projects

centphynef Office of Nuclear Reactor Regulation PD32 Reading NRC PDR Local PDR' FROM
.

John W. Craig, Director CPATEL Project Directorate III-2 LLUTHER Division of Reactor Projects - III.

JCRAIG IV, Y and Special Projects WSHAFER i

Office of Nuclear Reactor Regulation

SUBJECT:

CANCELLATION OF YELLOW TICKET 1

In a memorandum dated September 13, 1989 from T. Murley to R. Licciardo, (Enclosure 1) the staff was directed to issue its safety evaluation of the proposed Zion Technical Specifications for containment purge and vent system.

This assignment was reflected in Yellow Ticket No. 0899213 dated September 27,;

1989.

l By letter dated January 23, 1990 the Commonwealth Edison Company requested (Enclosure B to withdraw the proposed amendment request. At present, the' operation.. the containment purge and vent system at Zion is in accordance j

with the Confirmatory Order issued in February 1980. These restrictions were imposed as part of many other restrictions for the operation of Zion Station following the accident at TMI-2. The licensee has notified the Project Manager.

l of its intention to evaluate the existing requirenents in the Order, and provide a new request to modify the Order and revise the Technical Specifi-caticus. We will take appropriate actions after we receive a new proposal from the licensee.

Based on the above, I recommend that we cancel this yellow ticket.

/s/

John W. Craig, Director Project Directorate III-2 Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation

Enclosure:

As stated cc:

J. Sniezek G. Holahan J. Zwolinski D. Mossbu PD3 P

PD b

CPATEL/bj iJCRAIG

.t** u# 1 a b.hh O

/y[/90 i l t@'

i \\Mh90

/p

/ / 4/90 t

y, I\\

)

9001310418 900124 PDR ADOCK 03000295 P

PDC

..)

e

ENCLOSURE 1-

)

4' SEP 1-S ngg s

MENORANDUM FOR: RobertB.A.Licciardo,ReactorEngineer(Nuclear) f Plant Systems Branch L

Division of Systems Technology L

i 1

FROM:

Thomas E. Murley, Director Office of Nuclear Reactor Regulation

SUBJECT:

DIFFERINGPROFES$10NALVIEW(DPV)

References:

1.. Memorandum, Licciardo to Murley, dtd May 11, 1989 2.

Memorandum Murley to Miraglia, et al, dtd May 26, 1989-3.

Memorandum and Report from DPV Standing Review Panel to Murley dtd August 31, 1989 On May 11,1989 (Reference 1), you sent me a Differing Professional View regarding containment isolation valves (42" purge supply and exhaust-valves) at Zion. Pursuant to NRC Manual Chapter 4125, and NRR Office Letter No. 300, I established a Panel to review your Differing Professional View and make recomendations to me regarding appropriate disposition of your concerns (Reference 2).

I have reviewed the Panel's report and have discussed these issues with you in a meeting in my office on September 8, 1989. Based on sqy review of.the Panel's report and on our discussions, I have concluded that the following actions should be taken:

1.

The staff should issue its evaluation of the proposed Zion Technical W Specifications. (Action.. Projects A/D for Region III & V Reactors) n%f#i 2.

The staff should ensure that pressure and temperature effects during a g LOCA are considered in the review of new and advanced fuel designs.

mg (Action-.ReactorSystemsBranch)

The staff should revise the Standard Review Plan to clarify the relation-3.

during the normal SRP update process.- (Action.. Inspection an ship between DNBR and fuel failbre. Such clarifications may be made-OM CtB e,

ProgramBranch)

Original signed b5 j

l thomasE.31urley l

Thomas E. Murley, Director F

Office of Nuclear Reactor Regulation i

Enclosure:

Memorandum and Report from Panel dtd 8/31/89

.cc; F. Miraglia Distribution:

F. Gillespie TEMurley r

J. Partlow JHSniezek i)F E :N: R I

.....f: D OUR r.........:..........:............:............:............:........-.-

0.... ;..g NAME :JHS ek

TEMurley

..... :.....\\..... :. b....... :............ :............ :.......

DATE :9/12/8

9 9

d/-

0FFICIAL RECORD COPY

-??l04& % W a2P$'

e:M 84:15 NO.343_

Pee 2 ENCLOSURE'2-

f s'

1 Commonweehh Edson l

0 w Fire Nesonal Men CNeses Encis asereas repry m: Pos amoe sea rs7 y

CNosso. Basis 80000 0767 January 23. 1990

-l Dr. Thomas E. Nurley Office of Nuclear Reactor Regulstion U.S. Nuetear Regu1 story Commission Washington, DC-10555

Subject:

Eton Station Units 1 and 1 License Nos. DPR-39 and DPR48 2 Withdrawal of Proposed Technical.Speciflaation i

Mke hacket Maa. SD-itl.==d E Ma l

1 References a)-February.11, 1986, letter from P.C. LeBlond to 5.R. Denton' b) September 25, 1989, letter from G.E. Tesyna to T.R. Nurley c) September 29, 1989, letter from 0.5. Trsyna-to T.E. Nurley d) November 21, 1989 -letter from 0.5. Trayne to T.E. Nurley Dear Dr. Murley Cosenonwealth Edison submitted pro Amendments in References (s),.(b), and (c) posed Technical Specification regarding the operation of the Containment Purge & Vent System. Most recently, reference (d) provided a revised Amendment request that superceded the previous submittals. At this tiene Cosumonwealth Edison requests that the proposed Amendments -referenced-ebove regarding the operation of the Containment Purge and Vent System be

+

withdrawn.' The withdrawal of the proposed Amendment is being requested to permit the inclusion of the evaluetion of the Confirestory Order in tho' Significant Hasards Consideratica.

In the near future Commonwealth Edison piens to propose an' Amendment l

request on this topic that will include a request to revise the Eion Station Confirmatory Order.

Please direct any further questions on this matter to this office.

Very truly yours R.A.

hrsanoweli Nuclear Lie noing Administrator