ML20006A778

From kanterella
Jump to navigation Jump to search
Forwards Haddam Neck Plant 1989 Refueling Outage Steam Generator Tube Insp Rept
ML20006A778
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 01/19/1990
From: Miller D
CONNECTICUT YANKEE ATOMIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20006A779 List:
References
NUDOCS 9001300192
Download: ML20006A778 (1)


Text

1c s

-i l

CONNECTICUT YANKEE: ATOMIC POWER C'O M P A N Y HADDAM NECK PLANT RR#1

  • BOX 127E
  • EAST HAMPTON, CT 06424-9341 January 19,1990 T S. # 4.10.1 t

Docket 50-213 Ltr# EN 90-0038 lq U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Haddam Neck Plant 1989 Steam Generator Tube Inspection Report, dated October 22,1989

+

Connecticut Yankee Plant Technical Specification # 4.10.1, " Inservice Inspection 1

of Steam Generator Tubes", requin:s that the complete results of the Steam Generator Tube Inservice Inspection be reported to the Commission within 90 days after completion of the inspection.

The results of the inspection are attached.

Very truly you,

. p.

'onY B. Miller, Jr.

d Station Superintendent DBM:CJG/jts

Attachment:

Steam Generator Tube Inspection Report ec:

l W.T. Russell J.T.Shediosky A. Wang E. J. Mroczka (w/o attachments)

W. D. Romberg (w/o attachments) 9001300192 900119

{DR ADOCK 05000213 PDC l

Yl 1028-3 REV.10-87

(

.