Responds to NRC Bulletin 89-002, Stress Corrosion Cracking of High Hardness Type 410 Stainless Steel Internal Preloaded Bolting in Anchor Darling...Swing Check Valves.... No Subj Swing Check Valves Installed at Facility
ML20006A715
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 01/22/1990
From: Cockfield D
PORTLAND GENERAL ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
IEB-89-002, IEB-89-2, NUDOCS 9001300087
Download: ML20006A715 (1)


Text

-

-i v

'42 a

y PortlandGeneralElectricCong)any

, l t

David W. Cockfield Vice President, Nuclear

. January 22,- 1990 Trojan Nuclear Plant Docket'50-344 License NPF-1

'U.S.'Wuclear Regulatory Commission Attn: Document Control Desk-r Washington DC,20555.

Dear Sirs:

Nuclear Regulatory Commission (NRC)'

-[

Bulletin 89-02 -- Stress Corrosion Cracking of High-Hardness Type 410 Stainless Steel Internal Proloaded Bolting in Anchor Darling Model S350W Swing check Valves or Valves of similar Desian-The purpose of this letter is-to report to the NRC that Portland General i

Electric Company (PGE) has completed an evaluation of all safety-related check valves as required per Bulletin 89-02.

The results of our evaluation' s

conclude that the Trojan Nuclear Plant has no swing check valves with internal preloaded bolting material of American Society for Testing Materials-(ASTM)= Specification A193 Crade B6 Type 410 stainless steel.

No'further action will be taken by PGE-on Bulletin 89-02.

Sincerely, c:

Mr. John B. Martin Regional Administrator, Region V U.S. Nuclear Regulatory Commission Mr. David Stewart-Smith State of' Oregon

~, Department of Energy Mr. R. C. Barr i

NRC Resident Inspector l-

' Trojan Nuclear Plant L

~

Subscribed and sworn to before me this 22nd day of January, 1990.

hh hhh Notary Public of Or4gond_.

4 Lc--d f

Q My Commission Expires:

Mn.d 'I/Y/

1 l

f5&

L 121 S.W Salmon Street, Portand. Oregon 97204 M