ML20006A705
| ML20006A705 | |
| Person / Time | |
|---|---|
| Site: | 05000083 |
| Issue date: | 01/04/1990 |
| From: | Julian C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Vernetson W FLORIDA, UNIV. OF, GAINESVILLE, FL |
| References | |
| NUDOCS 9001300065 | |
| Download: ML20006A705 (2) | |
See also: IR 05000083/1989004
Text
/ 's .
- '
'
,
Q
>
,
(p
q
',,
a
.
-
. January 4. 1990
'
Mn
f
Docket No.!50-83
License No. R-56
.
~ University of Florida
ATTN: Dr. W..C. Vernetson-
.
.
Director of. Nuclear Facilities
.'
202 Nuclear Sciences Center
Gainesville,-FL .32611
Gentlemen:
'
SUBJECT: > ERRATA LETTER-FOR NRC INSPECTION REPORT NO. 50-083-89-04
i
The subject : inspection report. was transmitted to you by our letter, dated .
- December 18, 1989.- ' Inadvertently, the report was transmitted without .the -
We have enclosed the Notice of Violation.
Please insert
i
4
the Notice of Violation:into your copy of the report,
_
w
Sincerely,
Original signed by
,
Caudie A. Julian
,
Caudie A. Julian, Chief
,
Engineering Branch
.
Division of Reactor Safety
Enclosure:. ..
,
,
Notice of. Violation
, ,
,
,
cc.w/ encl:;.
'.
Dr. J.-S. Tulenko, Chairman
Nuclear Engineering Sciences Department
i
L
University of Florida
?
<
202 Nuclear Sciences Center
'Gainesville, FL 32611
3j
.
Dr.-Ratib A. Karam, Director
'
.,
J
L
. Neely Nuclear Research Center
!
i>
Georgia Institute of Technology
^,
900 Atlantic Drive, NW
Atlanta, GA -30332
- i
--
j
Garry D. Miller, Associate Director
,
Nuclear-Reactor Program
i
North Carolina State University
'
Box-.7909.-
Raleigh, NC 27695-7909
1
'
(cc w/enci cont'd - see page 2)
9002300065 9001o4
gDR
ADOCK 0500g 3
pgg[. j
.
_
m
.
.
___. _ , . . _ -
_
!k 4
e
-
i
~~
L
. -
..
? #5
- .
- P
-
_
'
. University!of Florida:
2:
. January 4, 1990
'
,
,
,
cc w/ enc 1 cont'd.
Dr. R. U. Mulder Director.
Reactor Facility.
-University of Virginia
. Charlottesville, VA 22901
>
4
Administrator-
Department of Environmental ~ Regulation
Power Plant Siting Section-
'
State of Florida
2600 Blair Stone Road
LTallahassee, FL 32301-
State Planning and Development
Clearinghouse.
Office of. Planning and Budgeting
Executive Office of the-Governor
The Capitol Building
~ Tallahassee, FL 32301
,
.
-Ulray Clark. Administrator
1
Radiological. Health Services
<
- Department of llealth and
Rehabilitative Services
1323 Winewood Boulevard 1
-Tallahassee. FL 32301
State of Florida
bec w/ enc 1:
Document Control Desk:
T. Michaels, NRR
LG. Belisle
.P. Burnett
- n1
RII: RC
RII:D
P urnett:gb
GBerisle
01/j/90
01/g/90
' j
, -
1
.
_
-
.-
n:
-v1
, , ,
.- i
1*'
j
"3'
)
.,.
p.
L.
ENCLOSURE 1
i
University of Florida
Docket No. 50-83
i
Gainseville, Florida
License No. R-56
.
During the Nuclear Regulatory Commission (NRC) inspection conducted on
November 13-16, 1989, a violation of NRC requirements was identified.
In
accordance with the " General Statement of Policy and Procedure for. NRC
"
. Enforcement Actions," 10 CFR Part 2, Appendix C (1989), the violation is listed-
below:
Technical Specification 4.0 requires that surveillance tests must be
,
performed within the specified frequencies.
,
Contrary to the above, a blade drop time check was not performed within
eight months (248 calendar days) after being performed on December 5,
i
1988, and quarterly scram checks were not performed within four months
~
(124calendardays)afterbeingperformedonFebruary 21, 1989.
,
This is a Severity Level V violation (Supplement I).
Pursuant to the provisions of 10 CFR 2.201, University of Florida is hereby
required to submit a written statement or explanation to-the Nuclear Regulatory
Commission, ATTN: Document Control Desk, Washington, DC 20555, with a copy to
the Regional Administrator, Region II, within 30 days of the date of the letter
transmitting-this Notice. This reply should be clearly marked as a " Reply to a
NoticeofViolation"andshouldinclude[foreachviolation]:
(1)admissionor
denial of the violation, (2) the reason for the violation if admitted, (3) the
corrective steps which have been. taken and the results achieved, (4)(5) the
the
corrective steps which will be: taken to avoid further violations, and
date when full compliance will be achieved.
Where good cause is shown,
consideration will be given to extending the response time.
If an adequate
reply is not received within the time specified in this Notice, an order may be
issued to show cause why- the license should not be modified, suspended, or
revoked or why such other action as may be proper should not be taken.
FOR THE NUCLEAR REGULATORY COMMISSION
b'
Caudie A. Julian, Chief
Engineering Branch
Division of Reactor Safety
Dated at Atlanta, Georgia
this % day of January 1990
g f b g. y - { g,.
.
--
. . - . .
-- -
-_
-
O
,-
. --