Forwards Notice of Violation,Inadvertently Omitted During Transmittal of Insp Rept 50-083/89-04
ML20006A705
Person / Time
Site: 05000083
Issue date: 01/04/1990
From: Julian C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Vernetson W
FLORIDA, UNIV. OF, GAINESVILLE, FL
References
NUDOCS 9001300065
Download: ML20006A705 (2)


See also: IR 05000083/1989004

Text

/ 's .

- '

'

,

Q

>

,

(p

q

',,

a

.

-

. January 4. 1990

'

Mn

f

Docket No.!50-83

License No. R-56

.

~ University of Florida

ATTN: Dr. W..C. Vernetson-

.

.

Director of. Nuclear Facilities

.'

202 Nuclear Sciences Center

Gainesville,-FL .32611

Gentlemen:

'

SUBJECT: > ERRATA LETTER-FOR NRC INSPECTION REPORT NO. 50-083-89-04

i

The subject : inspection report. was transmitted to you by our letter, dated .

- December 18, 1989.- ' Inadvertently, the report was transmitted without .the -

Notice of Violation.

We have enclosed the Notice of Violation.

Please insert

i

4

the Notice of Violation:into your copy of the report,

_

w

Sincerely,

Original signed by

,

Caudie A. Julian

,

Caudie A. Julian, Chief

,

Engineering Branch

.

Division of Reactor Safety

Enclosure:. ..

,

,

Notice of. Violation

, ,

,

,

cc.w/ encl:;.

'.

Dr. J.-S. Tulenko, Chairman

Nuclear Engineering Sciences Department

i

L

University of Florida

?

<

202 Nuclear Sciences Center

'Gainesville, FL 32611

3j

.

Dr.-Ratib A. Karam, Director

'

.,

J

L

. Neely Nuclear Research Center

!

i>

Georgia Institute of Technology

^,

900 Atlantic Drive, NW

Atlanta, GA -30332

i

--

j

Garry D. Miller, Associate Director

,

Nuclear-Reactor Program

i

North Carolina State University

'

Box-.7909.-

Raleigh, NC 27695-7909

1

'

(cc w/enci cont'd - see page 2)

9002300065 9001o4

gDR

ADOCK 0500g 3

pgg[. j

.

_

m

.

.

___. _ , . . _ -

_

!k 4

e

-

i

~~

L

. -

..

? #5

- .

  • P

-

_

'

. University!of Florida:

2:

. January 4, 1990

'

,

,

,

cc w/ enc 1 cont'd.

Dr. R. U. Mulder Director.

Reactor Facility.

-University of Virginia

. Charlottesville, VA 22901

>

4

Administrator-

Department of Environmental ~ Regulation

Power Plant Siting Section-

'

State of Florida

2600 Blair Stone Road

LTallahassee, FL 32301-

State Planning and Development

Clearinghouse.

Office of. Planning and Budgeting

Executive Office of the-Governor

The Capitol Building

~ Tallahassee, FL 32301

,

.

-Ulray Clark. Administrator

1

Radiological. Health Services

<

Department of llealth and

Rehabilitative Services

1323 Winewood Boulevard 1

-Tallahassee. FL 32301

State of Florida

bec w/ enc 1:

Document Control Desk:

T. Michaels, NRR

LG. Belisle

.P. Burnett

n1

RII: RC

RII:D

P urnett:gb

GBerisle

01/j/90

01/g/90

' j

, -

1

.

_

-

.-

n:

-v1

, , ,

.- i

1*'

j

"3'

)

.,.

p.

L.

ENCLOSURE 1

i

NOTICE OF VIOLATION

University of Florida

Docket No. 50-83

i

Gainseville, Florida

License No. R-56

.

During the Nuclear Regulatory Commission (NRC) inspection conducted on

November 13-16, 1989, a violation of NRC requirements was identified.

In

accordance with the " General Statement of Policy and Procedure for. NRC

"

. Enforcement Actions," 10 CFR Part 2, Appendix C (1989), the violation is listed-

below:

Technical Specification 4.0 requires that surveillance tests must be

,

performed within the specified frequencies.

,

Contrary to the above, a blade drop time check was not performed within

eight months (248 calendar days) after being performed on December 5,

i

1988, and quarterly scram checks were not performed within four months

~

(124calendardays)afterbeingperformedonFebruary 21, 1989.

,

This is a Severity Level V violation (Supplement I).

Pursuant to the provisions of 10 CFR 2.201, University of Florida is hereby

required to submit a written statement or explanation to-the Nuclear Regulatory

Commission, ATTN: Document Control Desk, Washington, DC 20555, with a copy to

the Regional Administrator, Region II, within 30 days of the date of the letter

transmitting-this Notice. This reply should be clearly marked as a " Reply to a

NoticeofViolation"andshouldinclude[foreachviolation]:

(1)admissionor

denial of the violation, (2) the reason for the violation if admitted, (3) the

corrective steps which have been. taken and the results achieved, (4)(5) the

the

corrective steps which will be: taken to avoid further violations, and

date when full compliance will be achieved.

Where good cause is shown,

consideration will be given to extending the response time.

If an adequate

reply is not received within the time specified in this Notice, an order may be

issued to show cause why- the license should not be modified, suspended, or

revoked or why such other action as may be proper should not be taken.

FOR THE NUCLEAR REGULATORY COMMISSION

b'

Caudie A. Julian, Chief

Engineering Branch

Division of Reactor Safety

Dated at Atlanta, Georgia

this % day of January 1990