- II 5
Duke frarr Company Hu 3 hu
' l'O Bat 33198 ike l* resident Chartone, NC 28N2 Nudeur 1% duction (IVI)3734531 DUKEPOWCR January 17, 1990 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.
20555-
Subject:
McGuire Nuclear Station, Units 1 and 2 Catawba Nuclear Station, Units 1 and 2
-Dacket Nos. 50-369 and 50-370; 50-413 and 50-414 Requested Technical Specifications Changes Removal of Cycle-Specific Parameter Limits From Technical Specifications (NRC Generic Letter 88-16)
(T.S.'s 1.0, 3/4.1.1.3, 3/4.1.3.1, 3/4.1.3.5, 3/4.1.3.6, 3/4.2.1, 3/4.2.2, 3/4.2.3, and 6.9.1.9)
Gentlemen Attached (pursuant to *0CFR 50.4 and 50.90) are License Amendment Requests to Appendix A Technical Specifications, of Facility Operating Licenses NPF-9 and NPF-17 for McGuire Nuclear Station Units 1 and 2, and Facility Operating Licenses NPF-35 and NPF-52 for Catawba Nuclear Station Units 1 and 2, respectively. The requested amendments remove certain cycle-specific parameter units ftom the Technical Specifications and relocate them to a
" Core Operating Limits Report" (COLR). These changes eliminate the need for a License Amendment to update the cycle-specific parameter limits for a fuel cycle. and~ result from NRC' Generic Letter 88-16. (A and B) contains the requested Technical Specifications changes (" pen and ink" markups, identified by vertical margin lines). contains the justification and safety analysis to support the requested changes.
Included in Attachment 2 (Attachment 2A) is a draft typical McGuire/ Catawba Core Operating Limits Report (note that the information in this " typical" COLR doesn't represent a specific station / unit / cycle's limits, and an actual report which would be suomitted to the NRC would address only 1 station / unit).
Pursuant to 10CFR 50.91, provides the analysis performed in accordance with the standards contained in 10CFR 50.92 which concludes that the requested amendments-do not involve a significant hazards consideration, and Duke is forwardirm a copy of this amendment request application and no significant hazards consideration analysis to the appropriate North Carolina and South Carolina state officials. The requested amendments have been reviewed and approved by the station managers and the Nuclear Safety Review Board in accordance with McGuire/ Catawba Technical Specifications 6.5.1.2 and 6.5.2.8.d, and have been determined to have no adverse safety or environmental impact.
9001260238 900117 ni PDR ADOCK 05000369 Mp/
P PDC V
j l'g t
Q i
Document Control Dnk January 17, 1990 page 2-Note that in addition to the guidance contained in NRC Generic Letter 88-16, this amendment request was prepared basically ir. accordance with the Westing, house Owners Group (WOG) Core Operating liimits Report License Amendment package to support implementation of the COLR for current plant Technical Specifications based on specific COLR improvements from the WOG MERITS Program (Ref. J. D. Campbell's September 6, 1989 letter to WOG primary representatives), as supplemented by guidance provided by the NRC during their, review / approval of the V. C. Summer Nuclear Station COLR Technical Specification Change (note that this sometimes resulted in wording different from that ptovided in the Generic Letter, but which maintains consistency with COLR Anendments previously approved by the NRC). Note also that Duko elected not to relocate the refueling boron conca:itration limit (T,S. 3/4.9.1) into the McGuire/ Catawba COLR at this time (although it is allowed by the NRC) but may pursue it in the future.
It. is requested that the desired amendments be expeditiously reviewed and approved in order that they can be taken advantage of for-the upcoming fuel cycle (Cycle 5) on Catawba Unit 1.
Approval of this requested amendment ptior to March 1990 will obviate the need for approval of a separate amendment request regarding rod back insertion limits for that fuel r"icie and for later use on Catawba Unit 2 (Ref, my letter to NRC dated Novernber 10, 1989), and a planned submittal for McGuire Units 1 and 2, as those changes would then be able to be performed via 10CFR 50.59.
The currently
. scheduled cycle startup date Ior Catawba Unit 1 is March 27, 1990 [ note the next cycle startup dates for Catawba Unit 2 and McGuire Units 1 (which is currently in an extended refueling outage) and 2 occur after Catawba Unit l's].
The NRC staff will be kept apprised of any changes to this schedule.
This mattar has previously been discussed with Mr. D. S. Hood of your staff.
Should there be any questions concerning these amendment requests or if additional information is required, please contact Mr. P. B. Nardoci at (704)'373-7432.
Very truly yours, L
kn Hal B. Tucker PBN185/lcs Attachments
fi { p E lE
.g Document' Control Dehk.
~
s;
- J;nuary. 17,:1990.
s Page 3 y
S xc:.;(w/attnehments) o Mr. S; D. Ebneter-
_ Regional Administrator.
U. S. Nuclear' Regulatory Commission p
. Region 11 101'Marietta Street, NW, Suite 2900 Atlanta, Georgia-30329 V
E:
Mr. D.!H. Brown.. Chief Radiation Protection Branch y
- Division of Facility Services Department of Human Services L
701 Barbour' Drive-Raleigh,-N. C..27603-2008 j
Mr. D. S. Hood; l
Office of Nuclear Reactor Regulation U. S., Nuclear Regulatory Commission Washington, D.C.
20555
- Mr. P. K.'VanDoorn NRC Resident Inspector-McGuire Nuclear Station I
Mr. Heyward Shealy,. Chief Bureau of-Radiological Health S. C.-Department of Health & Environmental Control i
'2600. Bull Street; i
Columbia, South Carolina. 29201 American Nuclear' Insurers c/o Dottie Sherman, ANI Library The Exchange,. Suite ~245; 270 Farmington Avenue i
F Farmington,.CT 06032
- M & M Nuclear Consultants 1221' Avenue of the Americas
' Suite 1500 r
1100 Circle 75 Parkway Atlanta, Georgia 30339 Mr. W. T.' Orders NRC Resident Inspector Catawba Nuclear Station
.Dr. K.'N. Jabbour Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission One White Flint North Washington, D.C.
20555 4
p_
-Document Control Desk January 17, 1990 Page 5 llal B. Tucker, beint, duly sworn, states that he is Vice President of Duke Power Company; that he is authorized on the part of said Company to sign and file with the Nuclear Regulatory Commission this revision to the McGuire Nuclear Station Technical Specifications. Appendix A to Facility Operating License Nos. NPF-9 and NPF-17, and the Catawba Nuclear Station Technical i
Specifications, Appendix A to Facility Operating License Nos. NPF-35 and NPF-52; and that all statements and matters set forth therein are true and-correct to the best of his knowledge, d
Y /
'llal B. Tucker, Vice President Subscribed and sworn to before me this 17th day of January, 1990.
/