Application for Amends to Licenses DPR-77 & DPR-79, Consisting of Tech Spec Change 88-42,modifying Trip Setpoint & Allowable Value Units for intermediate-range Neutron Flux Detector & source-range Neutron Flux Detector
ML20006A280
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 01/12/1990
From: Michael Ray
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20006A281 List:
References
NUDOCS 9001260074
Download: ML20006A280 (2)


Text

,

=

, l' c-?

i

' TENNESSEE. VALLEY ' AUTHORITY

. CHATTANOOGA. TENNESSEE 37401 SN 157B Lookout. Place JAN 121990 TVA-SQN-TS-88-42 10 CFR 50.90 U.S.. Nuclear Regulatory Commission ATTN:

Document Control Oesk Hashington, D.C.

20555 Gentlemen:

Inithe Matter of

)

Docket Nos. 5 -327 Tennessee Valley-Authority

)

50-328

'SEQUOYAH NUCLEAR PLANT (SQN)

TECHNICAL SPECIFICATION (TS) CHANGE 88-42

References:

1.

TVA letter to NRC dated December 2,1988 0

2. -TVA letter to NRC dated January 24, 1989 In accordance with 10 CFR 50.90, we are enclosing a requested amendment to licenses DPR-77 and-DPR-79 to change the TSs of SQN Units 1 and 2.

The proposed change modifies the trip setpoint and allowable value units for the-intermediate-range nuclear flux detector and revises the applicability

--requirements for the source range nuclear flux detector.

The. proposed TS' change is identified in Enclosure 1.

The justification for-

-the proposed TS change is provided in-Enclosure 2.

A. proposed determination of no significant hazards-consideration performed pursuant to 10 CFR 50.92 is provided in Enclosure 3.

The' enclosed TS. change will supersede the previously submitted TS 88-42 that was provided by Reference 1.

The enclosed change reflects a revised schedule with Unit 1 being the lead unit.

This revised schedule was provided to you in Reference 2.

Plant modifications for installing new intern >adiate range and sour.ce range flux detectors on Unit I will occur during the Unit i Cycle 4 refueling outage,:which is-projected to begin in April 1990 and end in June 1990.

NRC issuance of TVA's proposed TS change for Unit 1 is requested during this outage timeframe to ensure TS compliance for neutron monitoring prior to Unit 1 restart. ' Modifications for Unit 2 will occur during-the Unit 2 Cycle 4 refueling outage, which is projected to begin in October 1990 and end in J

December 1990.

NRC issuance of the Unit 2 TS change is requested during the Unit 2. outage timeframe.

TVA will keep NRC project management informed of any schedule changes through routine project review meetings.

9001260074 900112 g

{DR ADOCK0500g27 An Equal opportunity Employer s

Y gg K

A g;i-g l U.S. Nuclear Regulatory Commission o

JAN 121990 b.

Please direct questions concerning this' issue to D. V. Goodin'at

-(615) 843-7734-,

.J Very.truly yours, TENNESSEE VALLEY AUTHORITY' h

SJ M. J. Ray, Manager Licensing Project Management

. Sworn d subscribed before me l

- thi s-day of h s 1990 aaMi M,# K v.

fotary Public My'CommissionExpiresO-

[

Enclosures; cc: Ms.

S.~C.' Black, Assistant Director (Enclosures) for Projects-TVA Projects-Division ULS.' Nuclear Regulatory ~ Commission One White Flint, North

, ll55i Rockville Pike Rockville, Maryland 20852 Mr.LB.'A.-Wilson, Assistant = Director'(Enclosures) for Inspection Programs

.TVA Projects'DJvision c

.U.S. Nuclear Regulatory Commission Region II

-101 Marietta Street, NW, Suite 2900 C

Atlanta,. Georgia 30323 Mr. Michael H. Mobley, Director Division of Radiological Health T.E.R.R.A.-Building:

150 9th Avenue, N Nashville, Tennessee 37203 NRC Resident Inspector (Enclosures)

Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, Tennessee 37379 American Nuclear Insurers (Enclosures)

Attention:

Librarian

.The' Exchange, Sulte 245 270 Farmington Avenue Farmington, Connecticut 06032