ML20006A269
| ML20006A269 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 01/12/1990 |
| From: | Michael Ray TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20006A270 | List: |
| References | |
| NUDOCS 9001260061 | |
| Download: ML20006A269 (3) | |
Text
g 3
x h
h-1 TENNESSEE: VALLEY AUTHORITY y
CH ATTANOOGA, TENNESSEE 37401 i
p SN 1578 Lookout Place JAN 121990-W
{
TVA-SQN-TS-89-26 10 CFR 50.90
.U.S. Nuclear Regulatory Commission ATTN: Documer.t Control Desk Washington, D.C. _20555' t
, Gentlemen:
m
'In-the Matter of
)
Docket Nos. 50-327
~
Tennessee Valley Authority
)
50-328
\\
SEQUOYAH NUCLEAR PLANT (SQN) - TECHNICAL SPECIFICATION (TS) CHANGE 89.
f BORON INJECTION TANK DEACTIVATION j
In accordance with 10 CFR.50.90,:we are. enclosing a requested amendment to-l clitenses.DPR-77 and:DPR-79-to= change the TSs of SQN Unlts 1 and 2.
The 1 proposed change reflects the effects of the boron injection tank deactivation.
- The proposed TS' change is identified in Enclosure 1.
The justification'for
-the-proposed TS' change is'provided in Enclosure 2.
A proposed determination of no significant hazards consideration performed pursuant to 10 CFR-50;92 is i
provided in Enclosure 3.
For your information, Enclosure =4 contains the exp_ected changes resulting from boron inje_ction-tank deactivation to SQN's
~
y Final _ Safety Analysis Report, Chapter 15 analyses.
This1TS' change is being. requested _for implementation during'the Unit 1. Cycle 4'
.andl Unit 2 Cycle 4 refueling outages. -To support the schedule, we request the approved _ Unit 1-amendment between-Apri1'I and May 15, 1990.
The approved Junit 2 amendment is expected to be required between October 15 and De cember.1, -.1990. TVA will keep NRC project management informed of any
. schedule changes through routine project review meetings.
h I
d' t
D O
9001260061 900112
\\\\\\
PDR ADOCK 05000327
\\\\
i f
l' PDC y
An Equal opportunity Employer
x-y
.7 cc f._{
s U.S. Nuclear; Regulatory Commtsslon
.,h JAN 121990 Please direct questions concerning this issue to K. S. Whitaker at w :,
-(615) 843-7748.-
1 m
Very truly yours, TENNESSEE VALLEY AUTHORITY l
t
-f Ray,Mknager M. J
-Licensing Project Management-Sworn-to nd stEsc ibed before me.
thisl0 day of e
1990 r
.uv!
1
- Notary. K'bl c -
- MyCommiss.?on' Expires //-
Enclosures See page.2' cc: <
s 1
- i b
S
+
o
','.t.
i i.-
r
.p
ma
. p 4
^1 Y
L
- l. '
~~
I U.S. Nuclear Regulatory Commtssion JAN 1P.1990 I
cc:
Ms. S. C. Black, Assistant Director-(Enclosures)
'for Projects TVA Projects Division Y
.U.S. Nuclear Regulatory Commission F
One White Flint, North ll555 Rockville Pike Rockville, Maryland 20852 f
Mr..B. A. Wilson, Assistant Director (Enclosures) i for Inspection Programs.
f.-
TVA Projects Division U.S. Nuclear _ Regulatory Commission p
Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. Michael H. Hobley, Director Division of Radiological Health T.E.R.R.A..Bullding R
150 9th Avenue, N
+.
-Nashville, Tennessee 37203 NRC Resident Inspector (Enclosures)
Sequoyah Nuclear Plant l
2600 Igou-Ferry Road 1
Soddy Daisy, Tennessee 37379 1
l American Nuclear Insurers (Enclosures)
_i Attention:
Librarian-The Exchange.-Sulte 245 270 Farmington Avenue l
-Farmington, Connecticut 06032 I
J i
5