ML20006A182

From kanterella
Jump to navigation Jump to search
Memorandum & Order (Denying Petition to Intervene).* Denies in Entirety,Nuclear Accountability & Tj Saporito 891022 Petition for Leave to Intervene on Basis of Not Complying W/ Commission Rules.W/Certificate of Svc.Served on 900119
ML20006A182
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 01/16/1990
From: Bright G, Cotter B, Harbour J
Atomic Safety and Licensing Board Panel
To:
NUCLEAR ENERGY ACCOUNTABILITY PROJECT
References
CON-#190-9705 89-584-01-OLA, 89-584-1-OLA, LBP-90-05, LBP-90-5, OLA-4, NUDOCS 9001250416
Download: ML20006A182 (18)


Text

,

g* 703?

(gp qc-5 LBP-90 C

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION 10 M 19 N1:49 ATOMIC SAFETY AND LICENSING BOARD FMCE OF SECRETARY Before Administrative Judges:

BhkC B. Paul cotter, Jr., Chairman Glenn O.

Bright Jerry Harbour BERVED JAN 191990 In the Matter of FLORIDA POWER AND LIGHT Docket Nos. 50-250-OLA-4 COMPANY 50-251-OLA-4 (Turkey Point Nuclear Generating (Pressure-Temperature Plant, Units 3 and 4)

Limits)

(ASLBP No. 89-584-01-OLA)

January 16, 1990 MEMORANDUM AND ORDER (Denying Petition to Intervene)

On October 19, 1988, notice was published in the Federal Register specifying that persons whose interest might be affected by this proceeding and who wished to participate as a party "must file (by November 18, 1988) a written petition for leave to intervene."

53 Fed. Reg. 40981, 40988 (1988).

Eleven months after the close of the time specified in that notice, the Nuclear Energy Accountability Project (NEAP) and its Executive Director, Thomas J.

Saporito, Jr., seek leave to intervene in this 9001250416 900116 PDR ADOCK 05000250 0

PDR

?

, D 50 '

1

fu l ',s ' -

~

L

' proceeding.'

Both the Licensee and the NRC staff oppose

~

' intervention by these petitioners, principally on--standing and lateness grounds.2 For the reasons set out below, we-deny the petition as to both petitioners.3 s

Our authority to entertain a late-filed petition for leave to intervene turns on a balancing of five factors set out at 'liO CFR S 2.714 (a) (1).

Those factors are:

'(i)

Good cause, if any, for failure to file on time.

(ii)

The availability of other means whereby the i

petitioner's interest will be protected.

1 (iii)

The-extent to which the petitioner's participation: may reasonably be expected to assist in developing a sound record, i

(iv)

The extent to which the petitioner's interest will be represented by existing. parties.

' Petition for Leave to Intervene (October 22, 1989) (hereinafter cited as " Petition at __");

Clarification of Contentions and Answer to Licensee's Response in Opposition to NEAP /Saporito Petition for Leave to Intervene (November'16, 1989) (hereinafter cited as " Clarification at

__").

2. Licensee's Response in Opposition to NEAP /Saporito Petition for Leave to Intervene (November 13, 1989); NRC Staff's Response to Petition for Leave to Intervene of Thomas J. Saporito, Jr. and the Nuclear Energy Accountability Project (November 16, 1989).

3 For a discussion of the history of this proceeding and the specific nature of the license amendments at issue, see Florida Power and Licht Comoany (Turkey Point Nuclear

~

Generating Plant, Units 3 and 4), LBP-89-15, 29 NRC 493, 495-98.

In addition, in a separate Memorandum and Order issued contemporaneous with this decision, we resolve all issues remaining in this proceeding in the licensee's favor, and sustain the Staff's issuance of the license amendment under challenge here.

)

4 4

{t 3-(v) f The extent to which the petitioner's participation will broaden the issues or delay the

, proceeding.-

While all five must be considered and none is dispositive, L

the most important of the five factors is the presence or e

' absence of " good cause" justifying the lateness of the petition.

Absent " good cause", a petitioner bears a heavy burden to justify a late intervention based on the remaining four factors.

Missi.ssioni Power & Licht Co. (Grand Gulf Nuclear Station, Units-1 and 2), ALAB-704, 16 NRC 1725, 1730 (1982);-Wisconsin Public Service Corooration (Kewaunee 5

Nuclear Power Plant), LBP-78-24, 8 NRC 78, 83 (1978).

L I.

Good Cause=

Mr. Saporito advances three reasons for his failure to file a petition to intervene in this proceeding within the.

r time specified in the Notice of Opportunity for Hearing.

Those reasons are:

(1) he was an employee of the licensee; l

L (2) he was not aware of the severe radiation damage to the Turkey Point facility; and (3) he did not have actual notice of the opportunity for a hearing.

Petition at 20; Clarification at 6.

Whether viewed individually or jointly,

- these reasons fail to support a finding of " good cause."'

i L

. ' Because we find each of the reasons advanced by Mr.

Saporito wanting, we need not address the question of whether otherwise meritorious but, under the applicable facts, hypothetical justifications for a late-filed petition can satisfy 10 CFR S 2.714(a).

In our view, they cannot.

Because we read S 2.714 to require us to engage in a balancing of the competing factual equities, we believe a petitioner has an obligation to advance those reasons, and

~"

P-

-- m

--m

- m m -

m.5

hI : 0

)

1

-4 s

As a general rule, a decision to remain silent, and I

refrain from intervening in a timely manner is no 4

justification for a Board to permit intervention in an.

untimely manner.. Sag Lona Island Liahtina Co. (Shoreham Nuclear Power Station, Unit 1), ALAB-743, 18 NRC'387, 396 n.37 (1983).

Mr. Saporito asserts, however., that he was unable to initially file a timely petition because he was employed during the relevant filing period by Licensee, Florida Power and Light Company, implicitly suggesting that the threat of employer retaliation explains and justifies his-inaction.

Petition at 6; Clarification at 20.

We are unable'to find and petitioners fail to identify, any i

statute,. regulation, policy statement or commission case law that even suggests that employees of an applicant or-licensee are entitled to a generic exemption from the Commission's procedural rules.

We decline to author such a rule here.

Employees of an applicant or licensee are in a unique position to know of potential safety problems that might exist at a particular nuclear power facility yet may confront practical difficulties in identifying those only those reasons, which in fact reasonably caused the failure to act in the timely manner.

For example, reading Mr. Saporito's first three reasons for his inaction together, he in essence asks this Board to excuse his one year delay because, as an employee of the licensee, he could not raise concerns he didn't have in a proceeding he knew nothing about.

J t

t r

+ ;

potential problems for evaluation and, if necessary, resolution.- In our view, the purpose of Section 210 of the Energy Reorganization Act, as amended, 42 U.S.C.

S 5851(a),

' " Employee Protection,"5 is to ensure that these potential problems are raised in a timely manner and to the proper forum by broadly prohibiting, inter alia, retaliation against an employee who commences or participates in any manner in a proceeding under the Atomic Energy Act of 1954 as amended.'

4 i

5 In pertinent part, 42 U.S.C.

S 5851 provides that:

(njo employer...may discharge any employee or otherwise discriminate against any employee with respect to his compensation, terms, conditions, or privileges of employment because the employee (or any person acting pursuant to a request of the employee)--

(1) commenced, caused to be commenced, or is about to commence or cause to be commenced a proceeding under (the Energy Reorganization Act'of 1974) or the Atomic Energy Act of 1954, as amended, or a proceeding for the administration or enforcement of any requirement imposed under (those Acts);

(2) testified or is about to testify in any such proceeding or; (3) assisted or participated or is about to assist or participate in any manner in such a proceeding or in any other manner in such a proceeding...

42 U.S.C. S 5851(a).

' While it appears that, ordinarily, the commission's regulations implementing Section 210 contemplate that employees of an applicant or licensee would participate in a licensing proceeding by way of testimony (ggg 10 CFR S 50.7(a)(1)), the regulation does not exclude participation as an intervenor from the scope of protected activities.

Moreover, the express language of Section 210 clearly encompasses such participation.

~-

,k'

. l The Commission has successfully argued elsewhere that the courts must construe Section'210 in a manner that give its protections: practical, meaningful and broad effect.

[

' Egg, Kansas Gas & Electric Comnany v.

Brock, 780 F.2d 1505 (10th Cir. 1985), cert. denied, 478 U.S. 1011 (1986).

Presumably, that argument applies with-equal, if not greater, force to the Commission's own adjudicatory bodies.

Yet, to adopt Mr. Saporito's proposition that his employment status, standing alone, constitutes " good cause" for late intervention requires that we find Section 210 to be a meaningless'and ineffective protection in one of the very situations and for the very class of individuals it was intended to serve.

Mr. Saporito's own experience in exercising his rights under Section 210 argues to the contrary.7 It would be inconsistent to affirmatively give effect to Section 210 in one context while at the same time I Mr. Saporito's employment with the licensee was terminated December 22, 1988.

Based on complaints filed l

pursuant to Section 210(b) (1) of the Energy Reorganization Act, as amended, the District Director for the U.S.

. Department of Labor made a preliminary investigative finding that the termination of Mr. Saporito's employment constituted retaliation in violation of Section 210(a) of the Act.

The District Director went on to order Mr.

Saporito's reinstatement and the payment of compensatory money damages in the amount of $100,000.

In re Thomas J.

Sacorito,. DOL Nos. 89-ERA-7 and 89-ERA-17.

While this unrelated case is currently pending before the Secretary of Labor on appeal, it indicates that Mr. Saporito was personally aware of the steps necessary to invoke the protection of Section 210 and the scope of potential remedies that Section provides.

'7 conclude that the statutory provision must be assumed to be y

ineffective in'another' context.

2 Moreover, one of the guiding principles underlying both hD the commission's rules of practice and Section 210 is that y

potentially important and significant safety information c

should and must be aired identified, evaluated and resolved in a timely manner.

Thus, we are troubled by any rule which could encourage individuals to delay entering a proceeding, awaiting an opportune time to spring forth to claim intervenor status. based on potentially significant safety concerns or information.

Not-only would such a' rule wreak' havoc with-the concept of finality and the orderly conduct of administrative proceedings, it gives rise to the possibility that such concerns might never come to light because, in the mind of the silent employee, the " opportune time" never arrives.

Notwithstanding the absence of a generic exemption for I

licensee or' applicant employees, we do not foreclose the possibility that special facts might exist which would warrant a departure from the general rule that one cannot successfully stand on his rights to file an untimely petition after sitting on his rights to file a timely petition.

While petitioners allude to a pervasive fear of employer retaliation, mere assertions of fears of retallation do not come close to the type of special facts we believe necessary.

Nor do we find sufficient the fact

' that Mr. Saporito may'have been'the victim of such-retaliation at-some point after November 18, 1988, the date i

relevant here.

Without more than was offered by Petitioners, we'cannot find (nor will we assume) that Mr.

Saporito's employer's actions after November 18 so infected l

or controlled Mr. Saporito's actions prior to November 18 so ac-to render him effectively-incapable of exercising his rights under the' Commission's rules of practice as protected I

L by Section 210-of the Energy Reorganization Act.

As to his second justification, Mr Saporito appears to suggest that he originally had no safety concerns (or didn't realize that he should.have had concerns) regarding the license amendment at issua here.

Stated another way, during the filing period.specified in the October 1988 Federal Register notice, he had yet to put the pieces of his safety puzzle together.

This does not excuse the failure to comply with the Commission's procedural rules.

While newly-arising information has been recognized as " good cause," Consumers Power Co. (Midland Plant, Units 1 and 2), LBP-82-63, 16 NRC 571, 577 (1982), previously available information newly-acquired by a petitioner has not.

Kansas Gas and Electric ggt (Wolf Creek Generating Station, Unit 1), LBP-84-17, 19 NRC 878, 886 (1984).

Finally, Mr. Saporito's claim that he lacked actual notice of the license amendment or its attendant opportunity for a hearing is without merit.

While an early decision of

t i

. the. Appeal Board suggested that the door was open on the question whether publication'in the Federal Register was sufficient, standing alone, to put potential intervenors on notice, Pennsylvania Power and Licht Co. (Susquehanna Steam Electric Station, Units 1 & 2), ALAB-148, 6 AEC 642, 643 n.2 (1973), that door was subsequently closed in Tennessee a

Vallev Authority (Browns Ferry Nuclear Plant, Units 1 & 2),

{

ALAB-341, 4 NRC 95 (1976), wherein the Appeal Board summarily rejected a petition to intervene filed beyond the period specified in the applicable Federal Register.

Moreover, even assuming arauendo that'Mr. Saporito's employment status, his lack of actual notice, and his

- failure to comprehend the existence of possible safety problems justifies the failure to file a timely petition to

~ intervene, these reasons only excuse a portion of the delay that-accompanied Mr. Saporito's instant petition.

.His employment with the licensee terminated in December L

1988.8 Mr. Saporito certainly had actual notice of this proceeding and the issues before us as early as the March 1989 pre-hearing conference, a conference he attended.

And

- while-the record is unclear as to when Mr. Saporito's safety concerns "came together," that event must have occurred prior to April 6, 1989, when he served the first of a series 7

a See note 7, supra.

q

+1 m

i of filings with this Board.'

Thus, as of April 1989, all the disabilities identified by Mr. Saporito as rendering him unable to file a timely petition to intervene had been cured.

Yet', another 31x months passed before the instant petition was filed with the Board."

As to this additional delay, Mr. Saporito offers two justifications.for.the lateness of the instant petition:

(1) the'NRC staff advised him that his concerns would be

~ addressed in this proceeding and (2) he relied upon Intervenors to address his copper content concerns through their Contention No.

3.

Petition at 21; Clarification at 6-7.

Once again, the reasons proffered to justify the

. additional six months delay in the filing of the instant petition fall far short of the mark.

e Mr. Saporito originally sought to raise his safety l

concerns through a request filed with the NRC staff under 10 1

CFR S 2.206 (1989).

According to petitioners, the staff p"

' Prior to the instant Petition for Leave to Intervene, Mr. Saporito filed five documents with the Board.

Sag, fu

" Statement for Reconsideration," (April 6, 1989)' " Amended l;

Petition for a Limited Appearance Statement," (August 30, l'

1989); " Notice of Appearance," (August 30, 1989); Request for Contention Reconsideration," (September 7, 1989);

" Relevant Information for Consideration," (October 14, 1989).

" We note that the Commission summarily rejected as L

untimely a request-for a hearing filed five months late by this same petitioner for the purpose of challenging a license amendment involving this same facility.

Unpublished Order Denying Request for Hearing (May 30, 1989), Florida Power and Licht Company (Turkey Point Plant, Units 3 and 4),

Docket Nos. 50-250 and 50-251.

i>

=,

1

, declined.to take action on Mr..Saporito's request because his copper content concern was the subject of this proceeding.

Petitioner at 21.

However,.Mr. Saporito makes

- no effort to explain how this action by the NRC staff can'be translated into " good cause" justifying a late-filed petition to intervene."

We can only read curious absence of argument to mean that'Mr. Saporito cites the staff's action not as justification for his delay in seeking intervention, but rather, as the justification for his t

reasonable reliance upon the existing Intervenors to address

- his copper content concerns through their Contention No.

3.

l Unfortunately, a claim by a petitioner that it was lulled into inaction because it relied on another party or entity to represent its interests does not constitute " good cause."

l l

333, Gulf-States Utilities Co. (River Bend Station, Units 1 r

& 2),'ALAB-444, 6-NRC 760, 796 (1977).

As to NEAP, Mr. Saporito argues that as its founder and Executive Director, the organization stands in his shoes, L

with the lateness of its organizational and representative petition to intervene justified to the same extent the lateness of his individual petition is justified.

l i

" Indeed, having been advised that his concerns would be addressed in this proceeding, one would have expected Mr.

Saporito to expeditiously seek intervention to ensure that he might participate in how those concerns were resolved.

Yet, as best as we can determine from the face of petitioners' various filings, the staff's response apparently did not galvanize petitioners to action.

I J

1 s <

- Clarification at'7.

He alternatively argues that NEAP had not obtained incorporated status as of the close of the time specified'in the Notice of Opportunity for Hearing, and thus could not file a. timely petition to intervene.

Petition at 20.

Having-found Mr. Saporito's individual petition to

- intervene inexcusably late, his own logic requires that we

. similarly find the lateness of NEAP's petition wholly i

unjustified.

As to his alternative argument, newly-acquired organizational existence does not constitute " good cause."

Cincinnati Gas'and Electric Co. (William H.

Zimmer Nuclear Station), LBP-80-14, 11 NRC 570 (1980).

Neither petitioners have advanced any reasons which, either' singly or in combination, constitute " good cause" for their eleven month delay in filing their petition to

. intervene.

This being the case, we turn to the other four factors to determine whether petitioners make a compelling argument justifying intervention notwithstanding their b

inexcusable delay.

4 II.

Other Means to' Protect Rights The Licensee argues that intervention in this

- proceeding is not the only mechanism through which the petitioners can protect their interests, noting that they can file a petition for staff enforcement action under 10

- CFR S 2.206 (1989).

However, we have already held that a petitioner's rights under S 2.206 are poor substitutes for

.s

. 13 -

i their participation in an adjudicatory hearing.

LBP-89-15, i

29 NRC 493, 506 (1989).

Egg, Washincton Public Power Suoply System.(WPPSS Nuclear Project No. 3), ALAB-747, 18 NRC 1167,

[

1175-76 (1983).

Accordingly, this factor weighs in favor of intervention.

III.

Contribution to Development of Record

^

Where, as here, a compelling. argument for intervention must be made due to the absence-of " good cause" explaining a late-filed petition to intervene, a petitioner has a special-responsibility to particularize how its participation can reasonably be expected to assist in the development of a sound record.

Petitioners suggest that this, factor should be-found to support _ intervention'because they will attempt y

to' retain a metals fracture expert to testify at hearing,.

and because of Mr. Saporito's experience and knowledge of particular aspects of the operational procedures and history of the Turkey Point facility.

Petition at 22; Clarification L

L at 9..

l.

The do not doubt the sincerity of petitioners' 1

conviction that their information and assistance would help in developing a sound and complete record in this I

. proceeding.

However, in light of petitioners' avowed interest in pursuing areas of inquiry no longer at issue p'

before this Board, the potential significance of their l

contribution to the resolution of the issues currently 1

pending before this Board is, at best marginal.

Moreover,

R.

n-\\ n

.even if the issues before us were to be broadened, the proposed' participation-by the petitioners does not, in our view,' rise to the level-of a compelling case supporting the

. grant of a late-filed petition to intervene.-

IV.-

Representation by Other Parties Petitioners-argue that no other party.can represent their particular interests since Intervenors do not presently advance any contentions identical to those which petitioners seek to litigate. Petition at 22; Clarification at 10-13.

Because we have already concluded'that petitioners' relianco upon the Intervenors to represent their interests does not constitute " good cause" justifying their late-filed petition, it would be contradictory to suggest nonetheless that they can rely upon the Intervenors to represent their interests under this factor. Accordingly, we view this factor as supporting intervention.

V.

Potential-for Delay / Broadening of Issues As of the-date of the' instant petition, discovery had already taken place in this proceeding, summary disposition motions had been filed and responded to by all parties, and the hearing, if necessary, had been scheduled to begin in less than three months.

Thus, petitioners' eleven month-late petition comes at the eleventh hour of this proceeding.

Nonetheless, petitioners argue that a grant of their petition to intervene would neither unduly delay the proceeding nor broaden the issues currently pending before l

T-0 o

w

- 15'-

wf this-Board.

Petition at 22; ' Clarification at 13.

We 4

y

disagree, t

The existing parties, the public and this Board have a

(

cognizable interest in the timely and orderly conduct of our

- proceedings.

SAA,. Houston Lichtina and Power Co. (South

' Texas Project, Units.1 and 2), ALAB-549, 9 NRC 644, 648-49 (1979).

Thus, the fact that these petitioners are prepared to go forward with their arguments immediately, and that intervention would not delay already issued license amendments does not fully answer the policy consideration underlying the Commission's concerns under this factor.

Under.the Commission's rules of practice, a party has' a l

right to discover, prior to hearing, the nature and factual i

bases of all other parties' litigation positions.

Should we grant intervention at this late date, a significant delay could be avoided only at the expense of the discovery rights 3

i of the existing parties to the detriment of the orderly and i

L efficient conduct of any future hearing, if necessary, in i

this case.

Moreover, despite claims under this factor to the contrary, we note that petitioners strenuously argue in terms of the ability of others to represent their interests L

that petitioners proffered contentions focus on different

-matters than those addressed in Intervenors' remaining contentions.

333, Clarification at 10-13.

Thus, the purpose of the instant petition is, in fact, to broaden the l

4 Y

- - L -

q: MUb E

(

scope of'this proceeding.

While this consequence of a late

. intervention might'not be of critical importance at the n:

earlier stages of a case, we find it to be a strong argument against such intervention where it occurs'toward the end of the' proceeding, particularly where no " good cause" exists to justify the delay in seeking intervention.

12 CONCLUSION

' Based on our assessment of each of the five factors governing late-filed petitions to intervene, we have concluded that only the absence of other means to protect their interests and'the inability of other parties to represent their interests favor granting petitioners' late-filed motion to intervene.

In a case presenting a strikingly.similar balance, the Appeal Board has held that

...it is most difficult to envicage a situation in which (these two factors) might serve to justify granting intervention, after the hearing date was set, : to one _who - (1) is inexcusably late; (2) seeks to expand materially the scope of the proceeding; and (3) offers, at best, a marginal showing with respect to its ability to make a truly significant, substantive contribution.

By... remaining on the sidelines-while the proceeding moved closer and closer to trial, 12 Because we conclude that the instant petition was inexcusably ~1 ate and its acceptance is not supported by a balancing of the other factors set out at 10 CFR S 2.714 (a) (1), we need not address the standing arguments made by the parties.

Egg, Licensee Response at 2-7; Staff Response at 6-9; Clarification at 2-5.

Nonetheless, we note that even if petitioners' assertions supporting their standing are given all reasonable weight possible, an affirmative finding of either individual or organizational standing would be at best a close call.

4.

's '

e

' 1 (petitioners) voluntarily assumed the precise risk which has now materialized:

that its participation in the proceeding could no longer be sanctioned without destructive damage.to both the-rights of other parties and the integrity of the adjudicatory _ process itself.

South Carolina Electric and Gas Co. (Virgil C.

Summer Nuclear Station, Unit 1), ALAB-643, 13 NRC 881, 895 (1981).

The Petition for Leave to Intervene dated October'22, 1989 filed by.the Nuclear Energy. Accountability Project and Thomas J. Saporito, Jr. is denied in its entirety.

Pursuant to 110 C.F.R. S 2.760 of-the Commission's Rules of Practice, this decision will constitute the final decision of the Commission. thirty (30) days from the date of its issuance, unless an appeal is taken in accordance with 10 C.F.R.

S 2.762'or the Commission directs otherwise.

Egg also 10 C.F.R..SS 2.785 and 2.786.

ATOMIC SAFETY AND LICENSING BOARD Y 0, 88 Glenn O.

Bright U-ADMINISTRATIVE JUDGE l

  • W Jefry H6rbour ADMINISTRATIVE DGE

.sa/dNk B. Paul Cott Dr., Chairman ADMINISTRATI JUDGE Bethesda, Maryland

uv

=

lVi-

01 L,

rb UNITED STATES OF AMERICA r0 NUCLEAR REGULATORY COMMISSION l "b u

~1n-the Matter'of i

In i

FLORIDA POWER AND LIGHT COMPANY-Docket No.(s) 50-250/251-OLA-4' 1

7 1

(Tur rey Point' Plant, Unit ~ Nos. 3 & 4) i V

n CERTIFICATE OF SERVICE I hereoy certify that copies of the foregoing LB M&D (DENYING FETITION...)

-have been served upon the following perrons by U.S. mail, first classi except v

45 otherwise-noted and in accordance with the requirements of 10 CFR Sec. 2.712.

t

~

Atoste_ Safety and Licensing Appeal Administrative Judge Board-D. Paul Cotter, Jr., Chairman U.S. Nuclear Regulatory CoJ.mtssion Atomic $aiety and Licensing Board Washington, DC 20555 U.S. Nuclear Regulatory Commission Washington, DC 20555 i

Administrative Judge Administrative Judge Glenn 0F Bright Jerry Harbour Atomic Saf ety and Licensing Board Atomic Safety and Licensing Board

+

ju.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC' 20555:

Washington, DC 20555 9

Jantee E.-Moore, Esquire Patricia Jehle, Esquire Office of the General Counsel Office of the General Counsel U.S._t4uclear Regulatory Commission U.S. Nuclear Regulatory C:mmission Washington, DC 20:55 Washington, DC 20555 L;

Harold F.Reis,'Esquare Joette Lorion, Director Attorney for FP&L Center for Nuclear Responsibility i

Newman & Holtzinger, P.C.

7210 Red Road, #208 1615 L. Street, N.W., Suite 1000 Miami, FL 33143-Washington, DC 20036

  • Thomas J. Saporito, Jr., Exec. Director Nuclear Energy Accountability Project 1202:Sions Street

_ Dated at Rockville, Md. this 19 day.of January 1990 Offi e of the Secretary of the Commtssten P