ML20006A160

From kanterella
Jump to navigation Jump to search
Application for Amends to Licenses DPR-77 & DPR-79, Consisting of Tech Spec Change 89-02,reducing Min RHR Flow Rate During Mode 6 Operation
ML20006A160
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 01/12/1990
From: Michael Ray
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20006A161 List:
References
NUDOCS 9001250382
Download: ML20006A160 (2)


Text

, --

.,e s yj b

' ' ~ ' '

TENNESSEE VALLEY AUTHORITY-1 CH ATTANOOG A. TENNESSEE 37401 SN 1578 Lookout Place JAN 121990 TVA-SQN-TS-89-02 10 CFR 50.90 d.S. Nuclear Regulatory Commission ATTN: Document Control Desk Hashington, D.C. 20555 Gentlemen:

In the Matter of ) Docket Nos.~50-327 Tennessee Valley Authority ) 50-328-SEQUOYAH NUCLEAR PLAN 1 (SQN) - TECHNICAL SPECIFICATION (TS) CHANGE 89-02 In accordance with 10 CFR 50.90,-we are enclosing a requested amendment to licenses DPR-77-and DPR-79 to change the TSs of SQN Units 1 and 2. The proposed change reduces the minimum residual heat removal flow rate during Mode 6 operation.

4 The proposed TS change is identified in Enclosure 1. The justification for-the proposed TS change ls provided in Enclosure 2. A proposed determination of no significant hazards consideration performed pursuant to 10'CFR 50.92 is provided-in Enclosure 3.

This TS change is being requested for implementation during the Unit 1 Cycle 4 refueling outage. To support the schedule, we request the approved amendment by February 26, 199.0. TVA will keep NRC project management informed of any schedule changes through routine project review meetings.

Please direct questions concerning this issue to Kathy S. Whitaker at (615) 843-7748.

Very truly yours, w TENNESSEE VALLEY AUTHORITY

^

M. J. t , Mana er Licensing Project Management d subsc Ibed before me Sworn this o/' t,9pday

- of 1990 L '

.. Notary Publ1c ~

My Commission Expires /[ b _

Enclost;res cc: .See page 2 0$0 pO h b$bk E

{7 An Equal opportunity Employer ,

- 4. {

U.S. Nuclear Regulatory Commission- Q { g jQgQ cc: Ms. S. C. Black, Assistant Director (Enclosures) for Projects TVA Projects Division U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike .

Rockville, Maryland 20852 Mr. B. A. Wilson, Assistant Director (Enclosures)

for Inspection Programs _'

TVA Projects Division U.S. Nuclear Regulatory Commission Region II 101 Harletta Street,.NH, Suite 2900 Atlanta, Georgia 30323 Mr. Michael H. Mobley, Director Division of Radiological Health T.E.R.R.A. Building 150 9th Avenue, N Nashville, Tennessee 37203

-NRC Resident Inspector (Enclosures) '

Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, Tennessee 37379 ,

American Nucicar Insurers (Enclosures)

Attention: Librarian i The Evenange, Suite 245 270 Farmington Avenue Farmington, Connecticut 06032 1

I I

I