ML20005H143

From kanterella
Jump to navigation Jump to search
Application for Amends to Licenses DPR-77 & DPR-79, Consisting of Tech Spec Change 89-33,allowing Operation W/Vantage 5 Hybrid Fuel
ML20005H143
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 01/12/1990
From: Michael Ray
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20005H144 List:
References
NUDOCS 9001240200
Download: ML20005H143 (3)


Text

y7

+

t

(

S.-l,

j p-TENNESSEE VALLEY AUTHORITY CHATTANOOG A. TENNESSEE 37401 SN 1578 Lookout Place 6

N 18 M i

I

. TV6SQN-TS-89-33 10 CFR 50.90 i:.

i h

U.S. Nuclear Regulatory Commission l

b' ATTN: Document Control Desk p

Washington, D.C.

20555 t

Gentlemen:

4 In the Matter of

)

Docket N'as. 50-327-Tennessee Valley Authority

)

50-328 SEQUOYAH NUCLEAR PLANT (SQN) - TECHNICAL SPECIFICATION (TS) CHANGE 89 o VANTAGE 5 HYBRID (V5H) FUEL'UPGRi.DE In accordance with 10 CFR 50.90, we are enclosing a' requested amendment to licenses OPR-77 and DPR-79 to change the TSs of SQN Units I and 2.

The proposed change is required to allow the SQN units to refuel and operate with V5H fuel.

The proposed TS change is identified in Enclosure 1.

The justification for the proposed TS change is provided in Enclosure 2.

A proposed determination of no significant hazards consideration performed pursuant to 10 CFR 50.92 is provided in Enclosure 3.

A copy of the " Plant Safety Evaluation for Sequoyah Nuclear Plant Units 1 and 2-Vantage SH Fuel Upgrade" that was performed by Westinghouse Electric Corporation is provided in Enclosure 4.

This TS change is being. requested to be implemented during the Unit 1 Cycle 4 refueling outages.s To support this schedule, we request the approved Unit I amendment between April'l and May 15, 1990.

The approved Unit 2 amendment is expected to be required between October 15 e d December 1, 1990.

TVA will

- keep NRC project management informed of any schedule changes through routine project review meetings, ij:,

N yI

}

9001240200 900112 PDR ADOCK 05000327 p

PDC An Equal Opportunity Employer

]

l' i,

U.S. Nuclear' Regulatory Commission Please direct questions concerning this issue to B. S. Schofleid at (615) 843-6172.

L Very truly yours,

r TENNESSEE VALLEY AUTHORITY 0

t

.- T ]

M. J. Ray, Manager Licensing Project Management

-Sworn

d. subs ribed before me thi -

_ day o ms 1990 e

tt NottiryPublic?

/

MyCommissionExpires/ h-A Enclosures cc: See page 3 l

l-n

-)

L

' JAN 121990 U.S. Nuclear Regulatory Commission i

cc: Ms. S. C. Black, Assistant Director (Enclosures) for Projects-TVA Projects Division U.S. Nuclear. Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 o

Nr. B. A. Wilson, Assistant Director (Enclosures) for Inspection Programs TVA Projects Division U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NH, Suite 2900 Atlanta, Georgia 30323 Mr. Michael H. Mobley, Director r

Division of Radiological Health T.E.R.R.A. Building 150 9th Avenue, N Nashville, Tennessee 37203 NRC Resident Inspector (Enclosures)

Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, Tennessee 37379 American Nuclear Insurers (Enclosures)

Attention:

Librarian The Exchange, Suite 245 270 Farmington Avenue Farmington, Connecticut 06032 t

I i

l l

L l