Text
y
- ,;p.
N g
January 11,-1990
[3 : Docket No. 50-5 q
epc q(
' APPLICANT:'
Pennsylvania State University
[
FACILITY:
Penn State TRIGA Research Reactor
- p f
SUBJECT:
SUMMARY
OF MEETING TO DISCUSS INSTALLATION OF A COMPUTERIZED CONTROL SYSTEM FOR THE PENN STATE TRIGA RESEARCH REACTOR On December 18, 1989, M. Yoth, Director of the-Penn State TRIGA Research
-Reactor met with S. Weiss, A. Adams, T. Michaels, and H. Li of the NRC staff
'to discuss the possible. topics of interest for a future meeting with theLstaff'
-to discuss installation of the computerized control system for the Penn State j
TRIGA Research P.eactor.
Topicsofmutual-interestweredeterminedtobe:(1)ageneraldescriptionof
~
the system design; (2) the safety philesophy of the system design; (3) a
- schedule for a -license amendment to permit operation of the system; and (4) the
. validation and verification system for the system software.
Dr. Voth stated that-Penn' State would like installation approval by late summer r
of 1990. A meeting will be scheduled in the near future between representa-
' tives-of Penn. State, the-system vendor and the NRC staff to discuss the topics identified at this meeting.-
L Original signed by:
Alexander Adams, Jr., Project Manager o
l Non-Power Reactor, Decommissioning and l-Environmental Project Directorate Division'of Reactor Projects - III, IV, Y and Special Projects i
Office of Nuclear Reactor Regulation i
cc: 'See next page DISTRIBUTION' (Docketxfjdea AAdams L
NRC & Local PDRs OGC JSniezek EJordan
-PDNP r/f ACRS (10)
SWeiss JDyer, RI MS 17-G-21 EHylton
[AA LETTER /2]
o fh PDNP: V d
/
y AAda j
iss 4
1/$/90 1g/90
/
9001240045 90o113
{DR ADOCK 05000005 PDC
4
,,4,,
t.
^'[-;
- ,,[ '. Q.joWN UNITED STATES.
7
- NUCLEAR REGULATORY COMMISSION.
. ASHINGTON, D. C. 20666 W
0 January 11, 1990 3
p
, Docket No. 50..
}
p 1
j APPLICANT:
Pennsylvania State University iFACILITY:
Penn State TRIGA Research Reactor i
SUBJECT:
SUMMARY
OF MEETING TO DISCUSS INSTALLATION Of A COMPUTERIZED CONTROL SYSTEM FOR THE PENN STATE TRIGA RESEARCH REACTOR On. December 18, 1989,.M.LVoth, Director of the Penn State TRIGA Research i
Reactor met with S. Weiss, A. Adams, T. Michaels, and H. Li of the NRC staff "to discuss the possible topics of interest for a future meeting with the staff-to' discuss installation of the computerized control system for the Penn State e
TRIGA Research Reactor.
Topics of mutual interest were determined to be: (1) a general description of the system design; (2) the safety philosophy of the system design;-(3) 'a schedule for a license amendment to permit operation of the system; and (4) the validation and verification system for the system software.
Dr. Voth stated that Penn State would like installation approval by late sumer
.of 1990. A meeting will be scheduled in the near future between representa-tives of Penn State, the system vendor and the NRC staff to discuss the topics identified at this meeting.
0
/
Alexander Adams, Jr., Projee Manager L
Non-Power Reactor, Decommissioning and Environmental Project Directorate Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation cc: See next page l
l
v..
g :c.... w.
gJ i
k, l'",,: c i: w 1 Pennsylvania _ State University Docket No. 50-5 s.
s i!: !*
cc: Governor's Office of-State Planning i
and: Development
(?' '.
ATTN:- Coordinator, Pennsylvania State ~ Clearinghouse h'
-Post Office-Box 1323 Harrisburg, Pennsylvania 17120 I{
Dr. Marcus.H.3Voth, Director
-Penn State Breazeale Reactor College of Engineering-The Pennsylvania-State University 207: 01d Main Building University Park, Pennsylvania 16802
.s s
t b
l 1_,.