Monthly Operating Rept for Dec 1989 for Jm Farley Nuclear Plant Unit 2.W/900112 Ltr
ML20005G737
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 12/31/1989
From: Hairston W, Dennis Morey
ALABAMA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9001230006
Download: ML20005G737 (5)


Text

"fi@

" ,;b

' f,J,, , 4

, , m iiij%l :.&?/

../Jibama Poww Company '.

'sp'j< ,Q %t. " ,40 inverness Center Parkway l 4 ', A

' Post Office Box 1295 : '

,M '-' ~g

, Birmingham, Alabama 35201' Telephono 205 068-5501:

i;i r p ,. s_

r';{ ' ' b ?.

W, G. Hairston, lit -

. . Senior Vice President '

.  : nuciear operation. .- AlabamaPower the southern electrc system .

, ~ Janua ry 12, 1990_

e; A i

Docket No'. 50-364 Y i", ,

g .

. U.ES. Nuclear Regulatory Commission , ,

.m3 ATTN: Document Control Desk- '

'i' , ;Washingtoni D. C.: 20555-Joseph M.~ Farley Nuclear Plant

. . -Unit 2 Monthly operating Data Report-(: l

' Attached is the' December 1989 Monthly operating Report for Joseph M. Farley i oi Nuclear Plant Unit 2, required by Section 6.9.1.10 of the Technical l' Specifications.

~

-If you-have any questions,:please advise. j Respectfully submitted, p .. air on, K II

.c, LJGS:sme/1.6

' Attachment.

m Lcc:'. Mr. S. D.:Ebneter >

Mr. E..A. Reeves Mr. G. F. Maxwell 4

E

+

v ,

9001230006 891231

{DR ADOCK 03000364 //

s PDC e/

6 j>

1'

.- \:N ' h ._ sh_ !

M JOSEPH M. _ FARLEY NUCLEAR PIANT o

UNIT 2 NARRATIVE SlM1ARY OF OPERATIONS December, 1989-c There were no unit shutdowns or significant power reductions during the mont.h of December.

? R e following major safety-related maintenance was performed in the month

. ~ of December:

b '

l'. 'A faulty fuel injection pump was replaced on the 2B diesel generator.

2. The 2B diesel generator lubricating oil storage tank was cleaned and
the fuel was filtered.
3. The 20 incore detector was replaced.

4 .- - h e 2D-incore five path selector was repaired.

'5. Miscellaneous corrective and preventive maintenance was performed on

-the diesel generators.

J 5

t i.

. [ .* ._ _.*

l

,..; OPERATING DAM REPCRT <

.I DOCKET NO. 50-364 DA'IE 1/3/90 OCMPIA" LED BY D. N. Morey .,

TELEPHCME (205)899-5156 I OPERATDE S'm'IUS r'

Notes i

1.: Unit Name: Joseph M. Farley - Unit 2 '

-2.' Reporting Period: December, 1989 1) Cumulative data since

3. Licensed hermal Power (IMt): 2,652 7-30-81, date of
4. Nameplate Rating (Gross PHe): 860 commercial operation
5. Design Electrical Rating (Net MWe): 829
6. Maximum Dependable Capacity (Gross MWe): 870.3

=7.. Maximum Dependable Capacity (Net MWe): 829.7 _

8. If Changes Occur in Capacity Ratings (Items Number 3 2 rough 7) Since Last Report,.

Give Reasons: N/A

.9. Power Level To Which Restricted, If Any (Net MWe): N/A

10. Reasons For Resttictions, If Any: N/A his Month Yr-to-Date cumulative
11. Hours In Reporting Period 744 8,760 73,849
12. Number Of Hours Reactor Was Critical 744.0 7,205.2 56,677.9
13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0
14. Hours Generator On-Line 744.0 7,039.4 63,072.0
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross hermal Energy Generated (MWH) 1,971,879 18,058,631 160,256,267
17. Gross Elec6l :1 Energy Generated (MWH) 657,658 5,931,056 52,666,542
18. Net' Electrical. Energy Generated (MWH) 627,692 5,618,104- 49,943,390 119. Unit' Service-Factor 100.0 80.4 85.4 L20. Unit Availability Factor 100.0 80.4 85.4
21. Unit Capacity Factor (Using MDC Net) 101.7 77.3 82.7
22. Unit capacity _ Factor (Using DER Net) 101.8 77.4 81.6
23. Unit Forced Outage Rate 0.0 4.7 4.6 24.1 Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A

25. If Shut Down At End Of Report Period, Estimated Date of Startup: N/A

.26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY 05/06/81 05/08/81 INITIAL ELECTRICITY 05/24/81 05/25/81 COMERCIAL OPERATION 08/01/81 07/30/81 Form 2/30

m..

e, . ,

iR ' .'

a )

2 .fl j ,,

p  :. -

. ,t

DOCKET NO. 50-364 f[f-- ^

[ ,

UNIT 2-if ,

DATE January 3, 1990 a - '

COMPLETED BY D. N. Morey x-TELEPHONE (205)899-5156 Malmi December-

- DAY- AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL

.L(MWe-Net) (MWe-Net) 1- 847J .17 846

. 2~ 845 18 845 .

3 848 19 845 l4 848 20 844

-5. 846 ~21 845 6 842~ 22 845

7. '837 23 845
8. 839 24 845 i

. 9: 845 25 849-110 845 26 849 l

- 117 841 27 846-12: 840 28 845 i 13> ~846 29 843 l 14 845 30 840 l 1 15 843 31 837 l 16 827 INSTRUCTIONS on this format, list the average daily unit power level in MWe-Net for each day in f the reporting month. Compute to the nearest whole megawatt. i l

l Form 13/21 j

.)

s. -n - .

. .; __-.,,e.,  ;. . . .;--- -

~

'- , j, y p. 5 +-

.- .. _ g

^ ,

~

UNIT SMUTDoWNS AND POWER REDUcTIoWS DoctET 302-. 50-364 q .3 4

' UNIE NAPE - ~J. M.'rARLET - UNIT 2 ~,'

JABUARr 3.' 1990 -' .-?-

DME ~

conetz n D sr- D. s. numer .-

REPORT MoETH DECEMBER-

- TELEPHoWE - (205)s99-5156 1L I 1 I xErs= or. l'r.zcEnsEE I- l 1- cAust a commEctrvE I:

I I I I snurrras. - l EvEur i srsrEn I composEur .I --Acrrow ro i

-1 I I I ovmarrow I ,,

Ino. I Dart I tree 1

1 inouns) 1 mEAsos2  ; ,,,, ,,,c,,,3 , ,,,,,, , ; co,,4 , c ,5  ;; ,,,,,,,,,c,,,,,c,.

I I I i 1 1 -I 1. l' -l I

1 -1 lesEat wEat so unre suurDowns on stourrrcAnr rowEm mEDucrzons Domino est nonen or DEcEnsta. I I I I ~l - l l I I I I I I I I I I I I I l' -1 I I l- 1 I .I I I I I I 1.

I I I I i i 1 l 1- 1 I I I I I I 'l?

I I I I I i 1. I I I I I I I I

i .I I I I I I I:

I I I I I I I ~l_

I I I I I I l .1 -

i I I 1 I I i i l l

I I I I I l~

1 I I I I I I I l i I I I I I

.I I I i i I I i 1 I I i l 1 'l- 1 I I 'I.

i I I

'l I I I I I l- 1 I i 1

1. I I l i i I I I I i I I i I I I I I I I I I I I I I I I l- 1 I I I I I I I I I I I I I I I l 1 i

l i l l I i i l i I I I I I :I I i I I I I I I I I I I I

F: Forced Reason: Method:

  • Exhibit'G-Instructions 1-Manual .for Preparation of Data s: scheduled A-Equipment railure (Explain) 2-Manual scram. Entry sheets for Licensee B-Maintenance or Test e-Refueling 3-Automatic scram. Event Report (LER) rile (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

E-operator Training & License Examination $

Exhibit I -same Source F-Administrative G-operational Error (Explain)

(9/77) H-other (Explain)

M RXIR M

- - ~ ~ - - - - ~ - - - ~- '- -- - ----i-~=~ ^ ' - - ~ -

e__-_____