Commonwealth' Edison dr$'7N lZitn Genettin St: tion-D
=M i
- 7 101 Shiloh 81 ;:--
,'W,
' Zion, Illinois 60099
@ -4 j
Telephone 312/746 2084" i
... og
.j
),
r, -n'
'i,'
y e '
-l mov v I
January.'2, 1990 i'
N, _.,
.(-
bh!'
lU.S.[NuclearRegul'atoryCommission-WS Document-Control Desk 7 '
l
' l Washington,s DC, J20555 y
m.
r.r
- a,
Dear! Sir:
}
- EnclosedLplease' find 1.the Operating Status. Report for the-6imonth of) December, 1989 for Zion: Generating Station.
,Q;;
kt
/[
'4.
N-t[ '
- s. -
-k "
T.P.' Joyce j
' Station' Manager j
L l
Zion Station
,j m'
'?
s q
4 -LTPJ/JT/im; a
)
N LEhclosure j
+
.lcc-
'T;.Maiman.
z
" A. B'.- Davi s _ (NRC) i l
-L.D.
Butterfield H.Ei Bliss ~
.i ye g,
M?. Finn l I
, L.
L.J.'Ananstasia.
p
, 'a :
.INPO-L, n't
- Div. of Eng. Health 4
. State-of IL L..e Tech Staff File-J.'
Director, Office of Inspection
[
t ('N/
'and Enforcement i, f
,.f.
. Master File
/
i\\
i i.
t
('
p,1 6
{
l j'(
A C
O O
n
.p
.e-3 3
o-OPERATING DATA REPORT DOCKET No. 50-295 DATE l-5-90 e
COMPLETED BY J. Thomas TELEPHONE (7nR1766-2084 OPERATING STA1V8
< g, y,g%.- ' Zion Unit 1 Notes
- 2. % d.000 891201 to 6914J1
- 3. Liseased ThennalPower (MWt):
1250
- 4. Nameplate Rating (Genes WWe):
1085 i >
- S. Design Electr6 sal Rating (Not MWe):
1040
- 6. Maalaum Dependable Capacity (Gross MWe).
1085
- 7. Washness Dependable Caposity (Net WWe):
1040 8.' If Changes Occur in Capacity Ratings (Items Nanber 3 Tluough 7) Since last Report, Give Reasons:
N/A
' 9. Power level Tu Wideh Reserkted,If Any (Net MWe):
N/A i
- 10. Reeseos For Restdetions,If Amy:
N/A This Month Yr..to Dete Cummistive II. Hows Im Reporting Pedod 744.0 8760.O
_140,280.0
. it. Nussbar Of Hoers Reactor Was C$tical 0.0 5268.3 98,077.6
- 13. Reaster Reserve Shaedows Hours 0.0 0.O Z,bZ1.6
- 14. Hours Genssator On.Line 0.0 313z.u 95.299.7
- 58. Unit Rosesse Shutdows Hours n0 0.0 0.0
- 86. Osess Therinal Baergy Generated (WWH) 0.0 15.620,439 276,522,ob9
,17. Gross Electrical Energy Generstad (MWH) 0.0 5,224,653 go n79:aog
- 18. Not Blectrical Basegy Geessated (MWH) o.0 4.999,460 84,706,864
- 19. Unit Servles Factor n0 59.0 68.0 20.' Unit Availability Faster 0.0 59.0 68.0
- 21. Unit Capacity Factor (Using MDC Net) nn 55.0 58.0
. 22. Unit Capacity Factor (Using DER Net) 0.0 53 U 58.0
- 23. Unit Forced Outage Rate 0.0 21.0 13.0
- 24. Sheadowns Scheduled Over Next 6 Months (Type. Dete.and Duration of Each):
nafualIno Unit 1 shutdown on 9-7-89. Unit I went into an extended outage on 11-15-89 at 1900 hours0.022 days <br />0.528 hours <br />0.00314 weeks <br />7.2295e-4 months <br />, the unit remained in an extended outage for.the continuation of the montn.
- 25. If Shut Down At End Of Report Period. EAtimated Date of Startap:
1-14-90
- 26. Unite la Test 8tatus (Prior io Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (4/77)
-(
OPERATING DATA REPORT DOCKET NO. 50-304 DATE 1-5-90 COMPLETED 8Y 1 Thamas TELEPHONE. (7 08) 746-2084 OPERATING STATUS 3, unge m,:
74nn unie
?-
N"
- 2. Reporting Pwled: 0000 891201 to 0000 891231 3250
- (
- 3. Liseased Thermal Power (MWt):
108>
- 4. Nemepiste Rating (Gross WWe):
S. Design Electrimi Rating (Net MWe):
1 nan
' 6. Maximum DependeWe Cepecity (Gross MWe):
1085
[
- 7. Maximum DependeWe Cepecify (ht MWe):
1040 K
' 8. If Cheapse Occur in Cepecify Ratings (Items Number 3 Timough 7) Slace Last Report Give Reasons:
h N/A
- 9. Power level To Whish Restricted,if Any (Net MWe):
M/A
> 10. Rossess For Restrictions,if Any:
N/A' This Month Yr. to Dete Cumulative II; Hours la Reporting Period 766 0 o un n 111 991.0
- 12. Number of Hours Reactor Wes C$tical 744.O R '11t 9 100.111.0
- 13. Reester Reserve Shutdows Hours '
O.0 0.O
?76.1
- 14. Hours Generator On.Line -
679.8 A ??6.6 97.437.0 88.~ Unit Reserve Shutdown Hours 00-nn 0.O p
' 16. Geen Thorinal Energy Generated (WWH) 2.190. R40 24,001,503 789.469.647
- 17. Gross Electrieel Energy Generetsd (MWH) 708.632 A 018.907 92.345.765 l-18; he Electrieel Energy Genented (WWH) 669,607 7.694.444 87,967,290
- 19. Unit Servies Facto, -
91.O oA 0 73.0
- 20. Unit Aveliability Factor 91.0 94.0 73.0
- 21. Unit Cepecity Factor (Using MDC Nt)
R7.0 84.0 61.0
- 22. Unit Capacity Factor (Using DER Net) 87.0 84.0 63.0
- 23. Unit Forced Outege Rete -
9.0 6.0 14,0
- 34. Shutdowns Scheduled Over hat 6 Months (Type. Dete.and Duration of Each t:
nafnaline outane for Unit 2 to start on March 22, 1990 for
'approxinately' ten (10) weeks.
h;'
2$. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (9/77)
1; g.i " ' ' ;; '
7:
i
%;~jfd
. s INNTS1875D08W5 ABEDFUlfERBEDUC19tNIB ffon oit 1 gpggg 01/02/90 000SESTEgpgy J. Thomas gE70RT890Nyg December TER.EFII0ges (708)746-2084 l
~
'5 l
1%
c ac sesse.
No.
Osw
]
Essas Assima se
,j 7
890907 S
744.0 C
1 Unit 1 Shutdown for refueling Cycle XI-XII l
l l
8 2
3 4
F: Forced a:
,, g, g,g go, seg, g gg,,,
S: Scheduled A
Faguse(Espisia)
, %,g
'"""" W h t h a seras Emesy for RJoensee OllefesEnS 3-Acte seras Ewas Repers(t.ER) Fee tNUltEG-4-Centlemed M64)
- ' --- Rasseksges c iposesor M& taraman Esendoselee S-Rechamt Lead Ed N
3 F-Aendsberates
- -" Esser (EmpGsen)
Em 8-Some Samoor GC"(Emplah)
Heeler 89/77) m b
m
~
- L u
- /
y n / g.
' ' !.j s
~ ' '
~ 4-4
,, Jy: ;;, W" - - ~:g ~2 %- M~ : -
+r u r_
at:
"G
.ig g:;3: -
_, f W ; f l-
.b W 33;' y : -
~
~-
3 un m
> ;; y ; n.
,^
- ~ :
g
^
,~
..i$
NJ
_ [_yy
~~h 1.. l3 t
M*"
~
~
3 50-304' ~
^
ISMN A8SN18E EEI8CEME 12ien Unit:2-fA
- 3gg101/02/90 m g.
- '1 Tha==n g.-
l RMORTRIWWIN December?
1m meg g -(708)746-2084; i
Y "g,g,,,,,,
c,,, a c.,,,,gg,,
~ '
See.
Osse E
Esene Acelse se l
F 3
Reyees e havese Assessenes l
12 12/01/89
-F 64.2 A
1
-Unit 2 came off-line'due to i
thru leakage from' Loop D cold leg' i
12/04/89 RCS sample valve 2SS9358C.
The.-
reactor stayed critical.
r 1
1 l
a i
1 2
.3-4 F: Forced Reasse:
Edhis G.insesscelses list 7
_ of Dass ~-
S: Scheduled AgFaAsse(EnpIslo)
- g.ggen g Emery b_ ^^ for useasse of Sua.
- -neessa seras cassesmas s-a.e. seren E,s e aspose(LER) Fee (IEUREG-4
- asustammi 4-8ea*8a**d essel t
S-8*d***8 4*'d E4pssmeer Ma tassess
===a sam-i s
1 F-Adefehasselse G4psessionsIEssur(Empists) i5-
~ ' ' Esteh I.Souw Seusse P/M Hesime(EspIstep
. ~. -,
=.u -.
.-.~=.:
m w
y^'
_g L
p;.
. ;f<.
c AVERAGE DAILY UNIT POWER LEVEL-a e,
i',
1
>s l-3
[5 DOCKET NO, 50-295 Zion Unit 1-
- UNIT
" it..
pan. 01/02/90 z
s COMPLEMD BY c J. Thomas-(708)746-2084 HLEPHONE r-M
[,
ygown December-i DAY!. AVERAGE DAILY POWER LEVEL -
DAY-AVERAGE DAILY POWER LEVEL
. (MWe Net). '
(MWe Net)
. 2 l
g
- _37 f~l
-11
- 21
-27' 18
-31'-
-10 3;
3,
- -14
-10 20
-12!
-10
.g 21
-10 6 ;-
-12' 22 17_
- -12:
-10 23
-b 81
-12'
-11
_ j 3
f,[
-12 ?
25
-12
'so?
-12 26 s
. Ils
-12' 27
-12
-12
-12 i
f
- 12 28 u.;
fis.
-12
-12 2,
m
-12 14.
-12 30
' 1 1'-
-12
- 3; 33 16
-1l' 1
1
~ INSTRUCTIONS On this format, list the average daily unit power level in MWe Net for each day in the reporting month. Compute to
. he nearest whole messwatt.
t (9/77)
.l_.____.___._______.__.___,_____
- 7..,
's ll, ', ;;.
w: 3 8
..b
, ?l:
t vc NS JW;,7 -
1 7
W. ;S; i
NF';
- AVERAGE DAILY UNIT POWER LEVEL 2
QV2 tee,,
);'
f,E DOCKET NO. 50-304
{
Zion Unit 2 I
UNIT
,#.~
bl DATE 01/02/90' 1
g p
COMPLETED BY J. Thomas TELEPHONE (708)746-2084' y
a
(,
);
]'
'{
h p,cember-
~
.i DAY 1. AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL
- (MWe Net)
(MWe Net) c 257-1021 37 3
g 2
-27 18 1027
,3t
-30 1035 g,
4' 397 20 1043
- g. -
- 3; 999 21
'1044 1043-959 22
- 6=
- 7 1021 1042 23 5
'1016, 1026 l ~,<
a 24 1016:
989 9s 25
+
'W 10 1013 26 931'-
1014~
1019
)
. gi; 27 937 12 1019' 28 :
7 c
L
[33
1019 2,
965-m.
1015 1018 pn g4 30 L
1024; 1016 l;
15 31 H
1025
.16,.
p N'_
l l
INSTRUCTIONS On this format, list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to L
the nearest whole nwgawatt, (9/77) 4 4
a, (Y 2
'i in ;
- p i
a Y
+l n
QECEMBER 4
g
SUMMARY
OF OPERATING EXPERIENCE l
UNIT 1 l
The Unit entered the reporting period in cold shutdown for the Lcontinuation of the scheduled refueling outage.
Unit I went into an.
extended outage on 11/15/89 at 1900 hours0.022 days <br />0.528 hours <br />0.00314 weeks <br />7.2295e-4 months <br />, the unit remained offline the
.l entire month.
UNIL2 The Unit entered the report period at a power level of 1071 MHe (99%
reactor power)... Unit 2 came off-line on 12/01/89 at 1022 hours0.0118 days <br />0.284 hours <br />0.00169 weeks <br />3.88871e-4 months <br /> due to leakage from loop D cold leg RCS sample valve 2SS9358C.
The reactor
-stayed critical. On 12/04/89 at 0234 hours0.00271 days <br />0.065 hours <br />3.869048e-4 weeks <br />8.9037e-5 months <br />, Unit 2 was synchronized to 1
- the' grid-The Unit ended the report period at a power level of 1075 MHe (99% reactor power) and having an availability factor of 91.4%.
V T
1
?
-1397t 0934A
my.,
, - ~ -
gy
.j pl.,., 7 ',,
'I h;,,,,..
(d] UlL
=~
e W
+
uv\\
't DECEMBERL y
b'
. MAJOR SAFETY RELATED WAINTENANCI
)
4, W
9-
.y
. Equipment Name-Work Performed
'lVNITL1)L l,
.]
' ^
Unt't in Refueling Outage
,l t.
+
e (UNIT 2)i
' Loop' 0' Pres sur.izer Replaced valve.
V Spray valve
,(
w 2PCV-RC07 i
s 4
s LetdownRelief(Valve'-
Valve replaced due_ to leak through.
l i
- 1...
2VCBil7 Loop D Cold Leg' Replaced. leakage from valve.
RCS Sample; valve e
2SS9358C l
i e
-1 L
(
(
4 4
,\\_s
- \\
4 t
11397t 0934A m
m J
u
G d 5'
~ ^
h e
i 9
a k
p j
REFUELING INFORMATION REOUEST v
r i/
fQuestions::
l '.
Name of facility.
2.-
Scheduled date for next refueling shttdown.
i[<
3.
Scheduled date for restart following refueling.
i 1
4.
Will refueling or resumption of operation thereafter require a
- technical s;;ecification change or other license amendment?
l9 If answer is yes,:what, in general, will_ these be?
If answer is no, has the reload fuel design and core configuration L
been reviewed by your Plant Safety Review Committee to determine whether any unreviewed safety questions are associated with the core reload (Ref. 10 CFR Section 50.59)?
If no such review has taken-place, when is it scheduled?
5.
Scheduled-date(s) for submitting proposed licensing action and supporting information.
6.
Important licensing considerations associated with refueling, e.g.,
-new or different fuel design or supplier, unreviewed design or s,
performance analysis methods, significant changes in fuel design, new H
operating procedures.
7.
The number of fuel assemblies: (a) in the core and (b) in the spent fuel storage pool.
- 8. -
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned,.in number of fuel assemblies.
9'
-The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.
Page 1 of 3
~1397t
. 0934A
,.=:
.u.
.m m
j
,m a
c jff;,{r?'hf;bihb.f '
[
e 9 4 ).-;<,y e -
[;;jf -k; c
_j,,
a r
1 k,'I
)[N,
\\'
@ ' q $ Unit 31 - Aniggri-i:
' ":11 ' Zion Unit 1z h l.
2L:The cbrrent-l refueling-outage began on-September 7, 1989, g-;
p W
3.xCscle(1211sscheduledtogoon'-lineJanuary 14, 1990.
g' y
47 ;Tho:va-11te Review for the Z1C12 reload design has been approved.-
e
- 5[ None:
- 6.:'None:
7.
The number of fuel assemblies
. infthe core is'193, and-a);.
b)
- -inLthe spent-fuel storage pool from Zion Unit 1 is 70B.-
8.
The'present licensed spent fuel pool storage capacity (shared with Zion Unit 2) is 2112 fuel assemblies.
4
- 9.
Zion Station'will lose f011 core ~ discharge capability (for both units) in May 1993, at'the vnd;of Unit-2 Cycle 13, based on the latest Nuclear Stations' Refueling Schedule.
Full. core discharge capability for a single core will.be lost in November, 1994, at the end of Unit 2 Cycle 14..
.g t.s I
s e
I Page 2 of 3 1397t
,0934A W,
+
UA. ' a i
. ~,..
2 j
LltLit 2 - Antwers
([
1.
Zion Unit 2 2.
Cycle 11 is scheduled to shut down for refueling on March 22, 1990.
3.
Cycle 12 is scheduled to start up May 31, 1990.
4.
The reload safety evaluation meeting for Cycle 12 was held on December 12, 1989.
The on-site review for the Z2C1Z reload design will be held prior to Unit start-up, m
5.
None 6.
None 7.
The number of fuel assemblies a) in the core is 193, and.
b) in the spent fuel storage pool from Zion Unit 2 is 664.
i 8.
The present licensed spent fuel pool storage capacity (shared with Zion Unit 1) is 2112 fuel assemblies.
9.
Zion Station will lose full core discharge capability (for both units) in May 1993, at the end of Unit 2 Cycle 13, based on the latest Nuclear Sta'. ions Refueling Sr.hedule, full core discharge capability for a single core will be lost in November, 1994, at the end of Unit 2 Cycle 14.
Page 3 of 3 1397t 0934A
-