January 5, 1990 i
P t
l
- U. S. Nuclear Regulatory Commission Washington, D.C.
20555 l [] ^
Attentiont' Document Control Desk l Reference License DR-10, Docket 50-183 L
Gentlement l
. Enclosed are three signed copies of Annual Report No. 22 l
for the ESADA-Vallecitos Experimental Superheat Reactor (deactivated).
sincerely, l
, c/ /e -
4 L-m c
8 G. E. Cundinghan
. senior Licensing Engineer 1
(415)l862-4330 l
10=
/ca Enclosures 9001190219 gqq m$
^
f/
l PDR ADOCK 05000183
/
1 4
R PDC
\\
\\
s
1
.c ESADA-VALLECITOS EXPERIMENTAL SUPERHEAT REACTOR (DEACTIVATED) i l
ANNUAL REPORT N0. 22 1
L LICENSE DR-10 DOCKET 50-183 i
NUCLEAR OPERATIONS e GENERAL ELECTRIC COMPANY VALLECITOS NUCLEAR CENTER, PLEASANTON, CALIFORNIA 94566 i
...... -.. ~
l n <
i I
)
ESADA-VAT 1FCITOS RYPERIWiWTAL SUPERNRAT REACTOR j
(DEACTIVATED) i ANNUAL REPORT NO. 22 L
i General Electric Company has maintained the ESADA Vallecitos Experimental i
Superheat Reactor (EVESR) in a deactivated status under the authority of Amendment No. 3 to License DR 10. Docket 50183, issued June 11, 1976.
In this twenty-second annual report, a summary is presented as to the status of the facility for the period from January 1,1989, to December 31, 1989, as required by Paragraph 3.E.2. of the license.
I.
SUMMARY
The facility remains in essentially the same condition described in the twenty-first annual report.
Entry into the containment building was made for routine radiation surveys and a general check of conditions throughout the building.
Radiation levels remain essentially unchanged.
11.
STATUS OF THE FACILITY Access to the containment building is controlled by the facility supervisor according to written procedures.
The reactor vessel and head storage shield plugs, the wooden cover over the fuel storage pool, and the locked covers for the personnc3 and equipment hatchways remain in place.
J III.
RALMTION ANJ CONTAMINATION Complete radiation and contamination surveys of the facility indicate that s
the levels remain low.
Survey renuits are tabulated in Table 1.
The radiation / contamination levels listed are representative but not necessarily maximum values.
IV.
ACTIVITIES Routine inspections were conducted during this report period.
1
l-. o..
o 4...-
L',
EVESR Annual Report N). 22 o
V.
ORGANIZATION There were no changes in the organization.
VI.
CONCLUSION D
i-The General Electric Company-concludes.that the deactivated ESADA Vallecitos Experimental Superheat Reactor is being maintained in a safe shutdown condition..The inspections, access control, and administrative 1y controlled activities ensure maximum protection for the public health and safety. The i
procedures will be continued to maintain this high level of protection.
L-CENERAL ELECTRIC COMPANY Irradiation rocessing 4l By
/
h il, W. Titus, Manager Reactor Operations & Support Services 5
5 2
er.3 %
EVESR Annual' Report N). 22 i
9k l
z,_
i f
TABLE 1.
RADIATION AND CONTAMINATION REPORT Reactor Enclosure 10/88 10/89 l
t p
1.
Radiation Readings (mR/h gamma) t a.
Top of spent fuel pool '(main floor) 1.5 l'2 L
b.
549 ft-level (main floor)
<1.0
<1.0 c.
534 ft level 1.0
<1.0 2'
d.
519 ft level
<1.0
<1.0 l:
e.
503 ft level (maximum pipe reading) 3.0 1.5 2.8
- f. - 487-ft level (basement)
<1.0
<1 0
-2.
Air Samples (pci/cc air beta gamma) x 10 10, l'
0.037 0.026-a.
549 ft level
['
b.- $19 ft. level 0.11' O.032 l
i.
c.
487 ft level 0.059 0.031 i
L 3.' Floor Smears (c/m beta-gamma)**
r
$49-ft level 150/ft?
70/ft*
I Eu
<L j
<JI j
- i. r
- ?4-hour decay, e
0-
- For conversion to 6/m, assume an instrumer.t efficiencv of 204.
'EDIg: Radiation' levels, surface amears and air samples may vary from survey to-
[
survey.as they are taken in general areas rather than at specific locations.