Special Rept:On 900110,containment Isolation Valve for Containment Hose Station Riser Failed to Open Upon Remote Initiation from Control Room.Containment Isolation Valve Manually Opened.Detailed Special Rept Will Be Provided
ML20005G265
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 01/11/1990
From: Russell L
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9001180362
Download: ML20005G265 (2)


Text

. c. - ,.

l i +

, V-p . 15ALTIMORE  ?

OAS AND  !

ELECTRIC .

G CHARLES CENTER P.O. BOX 1475 BALTIMORE. MARYLAND 21203 j s l 1y.

LEON B. RUSSELL

-(< ,

&AAhAGl94

. CALvtM CLW78 NWOL( AR POWER PLANT DEPAhW(Idf January- 11, 1990 U. S. Nuclear Regulatory Commission

.. Washington, DC 20555 ATTENTION: Document Control Desk

SUBJECT:

- Calvert Cliffs Nuclear Power Plant Unit No.1; Docket No. 50-317 Technical Snecification 3.7.11.1.c Snecial Renort Gentlemen:

ton. January 10, 1990 at 1005, while Unit I was in Mode 5 (cold shutdown), it was discovered that the ' Unit 1 Containment isolation Valve (MOV-6200) for the Containment Hose Station Riser would not open upor remote initiation from the Control Room. The e isolation - valve is addressed by- Calvert Cliffs Nuclear Power Plant Unit i Technical Specification 3/4.7.l l .l.c. ' The = associated . Action Statement, 3.7. l l . l .b. was entered as 'was : the Action Statement for Unit 1 Technical Specification 3.7.11.4.a,

  • Fire Hose Stations."

Establishment of a . back-up water supply was provided within one hour by manually opening MOV-6200 which pressurized the Unit 1 Containment llose Station Riser.

Therefore all Unit -1 Containment Fire Hose Stations are operable. This action satisfied Action Statement 3.7.ll.l.b.1 and allowed Action Statement 3.7.11.4.a to be exited.-

At 1700 on January 10, 1990 a telephone notification was made by the Shift Supervisor to the Nuclear Regulatory Commission duty officer. This telephone notification j

satisfies ' Action Statement 3.7.ll.l.b.2.a. This letter provides written confirmation 1: of the telephone report no later than the first working day following the event and I satisfies Action Statement 3.7.ll.l.b.2.b.

Immediate corrective actions, in addition to manually opening the valve, are focused on l-restoring- the automatic capability of MOV-6200. A detailed Special Report will be i

, provided within 14 days with additional information.

l l

E 9001180362 900111 ADOCK0500g7 h gDR

/

Il

. a

g-e "Ot

'^*a' Y Document Control Desk

' January 11, 1990 Page 2 i 1

s-Should you have any further questions regarding this matter, we will be pleased to l

(' - discuss them with yoo. l l

Very truly yours,  !