k;n January 9, 1990
- Docket.Nos. 50-460 and 50-508 r
PARTICIPANT:
Washington Public Power Supply System (WPPSS)
FACILITY:
WNP-1 and WNP-3
)
SUBJECT:
SUMMARY
OF MEETING TO DISCUSS STATUS OF WNP-1 AND WNP-3 l
h On December 5,1989, G. Sorensen, Manager of Regulatory Programs at the WPPSS met with W. Travers,- S. Weiss, and A. Adams of the NRC staff to discuss the status of WNP-1 and WNP-3. Due to a reorganization and staff reassignments in the.0ffice of Nuclear Reactor Regulation, this meeting represented an initial j
l opportunity.for members of'the WPPSS and NRC staff to meet.
4 G. Sorensen outlined the history of. the units, their present status, highlights of-the ongoing; facility preservation program, and the outlook for growth in l power demand in the Pacific Northwest.
No plans are being made at this time to resume construction at either unit, LThe schedule for the preparation of a safety Evaluation Report (SER) :oncerning e
geoscience: reports submitted to NRC for WNP-3 was -discussed. The staff stated that-the' earliest that the SER could be completed would be in the late spring
' 'of 1990; The staff pointed out that this was not a firm commitment and would 2
s m
+,
. depend on; the workload associated with operating plants.
Original signed by:
a Alexander Adams, Jr., Project Manager 1
Ncn-Power Reactor, Decommissioning and 1
Environmental Project Directorate Division of Reactor Projects - III, I
IV, V and Special Projects q
Office of Nuclear'Rehetor Regulation i
cc: See next pages l
DISTRIBUTION I
CDocket:111e9 NRC & Local PDRs H
JSniezek i
L PDNP r/f j
L SWeiss
'AAdams L
OGC-EJordan EHylton 9001160103 900109 DR ADOCK 05000460 PNU
[AALETTER]
i
[0 PDNP:
.AAda ss 1 0
~1/]
1
/90
p
"' 4, UNITED STATES Elf NUCLEAR REGULATORY COMMISSION l F.,
. k-
. WASHINGTON, D. C. 20665
~
gz.,
.c
%, (.... /
Danuary. 9, 1990
! Docket Nos. 50-460-and-50-508-g<
_ PARTICIPANT:
Washington Public Power Supply System (WPPSS) j I
FACILITY:
'WNP-1:and WNP-3
SUBJECT:
SUMMARY
OF MEETING TO DISCUSS STATUS OF WNP-1 AND WNP-3
'On December 5, 1989, G. Sorensen, Manager of Regulatory Programs at' the WPPSS met with W.; Travers, S' Weiss, and A. Adams of.the NRC staff to discuss the M
status of WNP-1 and WNP-3.<.Due to a reorganization and staff reassignments'in.
the Office of Nuclear. Reactor Regulation,.this. meeting represented an: initial.
opportunity for members of the WFPSS and NRC: staff to meet.
c L-LG. Sorensen outlined the history of the units, their present status, highlights, of the-ongoing facility preservation program, and the outlook for growth in L
power demand -in the' Pacific Northwest.- No_ plans are being made at.this time l;
to resume-construction at either unit.
a 1
Theschedulefor,the.preparationofaSafetyEvaluation_ Report'~(SER)concerning.
L
- geoscience' reports suomitted to NRC for WND-3 was discussed.. The staff? stated i
.that the earliest:that the SER could-be completed would be in the late spring f of l990. 'The staff pointed out that this was' not a firm comitment and would depend on'the workload associated.with operating plants.
ds!P,ca <B Alexander Adams, Jr roject Manager Non-Power Reactor, Decomissioning and Environmental Project Directorate Division of Reactor Projects - III, IV, Y and Special Projects-Office of Nuclear Reactor Regulation l.
cc: See next pages f
i
g
% d5
?,'. 3 7 h
Mr.D.W[Mazur WPPSS Nuclear Project No. 1 Washington Public Power Supply System (WNP-1)DocketNo.STN50-460 Z3 6
' cc*
!~
Mr. Robert B.-Borsum Mr. G. C. Sorensen, Manager-Babcock & Wilcox Regulatory Programs-Nuclear Power Generation Washington Public. Power Supply'.
System Division 1700 Rockville-Pike Post Office Box 968.
. Suite 525 Richland, Washington 99352
_Rockville, Maryland 20852
?
- Nicholas S. Reynolds,- Esq..
Bishop, Cook, Purcell.8 Reynolds Law Offices
-1400 L. Street, N.W.
Washington, D.C.
20005-3502-G. E. Doupe, Esq.
Washington Public Power Supply System-l 3000-George Washington Way R1chland,-Washington 99352-L Mr. Curtis Eschels, Chairman Energy Facility Site Evaluation Council Mail.Stop PY-11 Olympia, Washington 98505 Mr'. Richard Latorre Regulatory Programs Washington Public Power Supply System Post Office Box 968 L
Richland, Washington. 99352 Mr. William Ang i
Region _ Inspector /WPPSS 3/5 U.S. Nuclear Regulatory Commission 1;
-1450 Maria Lane - Suite 210 l:
Walnut Creek, California 94596 l
L Mr. Eugene Rosolie, Director n
Coalition for Safe Power l.
408 Southwest Second Avenue i
Portland, Oregon 97204 L
l 1 :.
4
..c n
Mr. D. W. : Mazur -
WPPSS Nuclear Project No. 3
_ ashington Public Power Supply System (WNP-3) Docket No. 50-508 W
I
,cc:
j Mr. Charles B. Brinkman, Manager ~
Mr. G. C. Sorensen, Manager Washington fluclear Operations Regulatory Programs-Combustion Engineering, Inc.
Washington Public Power Supply 12300 Twinbrook Parkway, Suite 330 System Rockville, Maryland 20852 Post Office Box 968 Richland, Washington 99352 Nicholas S. Reynolds, Esq.
Bishop, Cook, Purcell & Reynolds Regional Administrator, Region V 1400 L Street, N.W.
U.S. Nuclear Regulatory.Connission Weshington, D.C.
20005-3502 1450 Maria Lane-Suite 210 G. E. Doupe, Esr..-
Walnut Creek, California 94596 Washington Public Power Supply System 3000 George Washington Way Richland, Washington 99352 Mr. Curtis Eschels, Chairman Energy Facility Site Evaluation Council Mail Stop PY Olympia, Washington 98505 Mr. Richard Latorre Regulatory Programs Washington Public Power Supply L
System L
Post Office Box 968 Richland, Washington 99352 Mr. William Ang Region Inspector /WPPSS 3/5-U.S. Nuclear Regulatory Commission L
1450 Maria Lane - Suite 210 L
Walnut Creek, California 94596 L
l Mr. Eugene Rosolie, Director Coalition for Safe Power 408 Southwest Second Avenue Portland, Oregon '97204
.