_
s
'~
- $C*0h
}
- [
' UNITED STATES g
}~
NUCLEAR REGULATORY COMMISSION o
e k ~ ~ * ~. OFFICE OF INVESTIGATIONS FIELD OFFICES
-l REQlON l 4, * * * * *,o I'
478 ALLENDALE ROAD KING OF PRUSSIA. PENNSYLVANIA 19404 12 FEB E88 MEMORANDUM FOR:
Victor Stello, Jr., Executive Director for Operations FROM:
Chester W. White, Director Office of Investigations Field Office, Region 1
SUBJECT:
ADMINISTRATIVE CLOSURE OF CASE NUMBER Q1-86-005 (TELEMECANIQUE/ SUSPECTED FALSIFICATION OF CERTIF CONFORMANCE FOR MOTOR CONTROL CENTERS SUPPLIED TO V t
NUCLEAR POWER STATIONS)
Office of Investigations (01) procedures call for periodic review.of casas within its inventory to identify those warranting administrative closure.
This case has been reviewed and is being administrative 1y closed by 01 due to
' lack of resources.
We are forwarding it for your further review and whatever action you deem appropriate through the normal inspection program.
Should you.
decide to pursue this matter, both SECY 85-369 and Commission Policy require that any information daveloped by your staff indicative of deliberate violations of NRC requirements, or other natters potentially warranting referral to the Department of Justice or other law enforcement or prosecutive agencies, be brought to the attention of 01.
Enclosure:
As stated cc w/
1 -
/
E. Gilbert, 01:HQ
'W. Russell, RI i
i I
I
/
I 9001120215 900 M
\\
hPE
-404 PDR l
t
pw fi
s u
.i *
Title:
TELEMECANIQUE:
SUSPECTED FALSIFICATION OF CERTIFICATES OF CONFORMANCE FOR MOTOR CONTROL CENTERS SUPPLIED TO VARIOUS NUCLEAR POWER STATIONS.
. Licensee:
Case Number:
Q1-86-005
'Telenecanique, Inc.
Report Date:
February 12, 1988 4
2002 Bethel Road Westminster, Maryland 21157 Control Office: OI:RI Status:
Closed Inquiry Reported By:
Approved By:
Jefbme A. Cullings (investigattr Chester
- 4. White, Director Office of Investigations Office of Investigations Field 0ffice, Region I Field Office, Region !
l l
l l
l --
1
/h,
&&c24 L-
I::
+
i.
DETAILS OF INQUIRY
^
Purpose of Inquiry This Inquiry was initiated on March 4, 1987, at the. request of the _then Acting Executive Director for Operations, Victor STELLO, Jr., to determine if Telemecanique, Westminster, Maryland, was issuing) fraudulent Certificates of Conformance (C00) for Motor Control Centers (MCCs manufactured, assembled, and distributed by them (Exhibit 1).
~
Background
On November 1-9, 1984, NRC Vendor Branch Inspectors Kamalakar R. NAIDU and Joseph J. PETROSINO conducted an inspection of Telemecanique's quality assurance (QA). program. The inspection was conducted to ensure that the MCCs manufactured by Telemecanique and installed with circuit breakers (CBs) l manufactured by Siemens-Allis (SA), Bellefontaine, Ohio, met the 0A requirements of both 10 CFR 50, Appendix B, and ANSI N45.2 (Exhibit 2).
The Inspectors determined that Telemecanique's QA program. failed to meet
)
Criteria VII, X, and XVIII of Appendix B to 10 CFR 50, which requires vendors l
of IE equipment to assure that commercial grade material. purchased from thair sub-vendors that will be dedicated as IE, conform to procurement documents, 4
and that they establish a QA program to test circuit breakers received as commercial grade items.
{
Closure Information Due to a lack of resources and other highar oriority investigative concerns, i
this inquiry is being administratively closed. No further actier will be taken.
3
-t
., ( * -
e-l.i LIST OF EXHIBITS Exhibit No.
Description-1 Request for Investigation,' dated February 5.,'1986.
2 Vendor Branch Inspection Report No. 99900279/84-01, dated March 6, 1985...
.