ML20005E973

From kanterella
Jump to navigation Jump to search
Notice of Nonconformance from Insp on 881214-15. Nonconformance Noted:Procedures Necessary to Ensure That Certificate of Conformance Received from Subvendors Before Matl Dedicated & Released Not Implemented
ML20005E973
Person / Time
Issue date: 01/05/1990
From:
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20005E972 List:
References
REF-QA-99901011 99901011-88-01, 99901011-88-1, NUDOCS 9001120124
Download: ML20005E973 (1)


Text

.i 6

l.'Telemeconique, Incorporated Docket No. 99901011/88-01

,!*J~

Westminster, Maryland 21157 v

NOTICE OF NONCONFORMANCE Based upon the results of an NRC inspection conducted December 14-15,1988, it appears that certain of your activities were not conducted in accordance with NRC requirements.

1 Criterion V of Appendix B to 10 CFR 50 states:

" Activities affecting quality shall be prescribed by documented instructions, procedures, or drawings, of a type appropriate to the.

R circumstances and:shall be accomplished in accorcance with these instructions, procedures, or drawings.

Instructions, procedures,.or drawings shall. include appropriate quantitative or qualitative dcceptunce Criteria-for been satisfactorily accodetermining that important activities have mplished."

. Contrary to the above, Telemecanique has not implemented procedures as L

necessary to ensure that Certificates of Conformance are received from subvendors before material is dedicated and released by Telemecanique..

i Additionally -the7riginator of the Certificates of Conformance has not been audited by Telemecanique as necessary to verify the validity of the Certificates

'of Conformance.

(88-01-01) 1 I

L L

L l

l u

l l

l

.p00*$$999EMVTEMEC 124 900103 99901n13 PDC l

-