Staff Requirements Memo Re SECY-89-311, Resolution Process for Severe Accident Issues on Evolutionary LWRs Concerning New Generations of Reactor Designs & Approach to Review of Evolutionary LWRs
ML20005E846
Person / Time
Issue date: 12/15/1989
From: Chilk S
NRC OFFICE OF THE SECRETARY (SECY)
To: Taylor J
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
References
REF-10CFR9.7 NUDOCS 9001110166
Download: ML20005E846 (3)


Text

..

4 i

,a ntog '

UNITED $TATES NUCLEAR REGULATORY COMMISSION

].

WASHINGTON, D.C. 20066

\\+,,,.

Decenber 15, 1989 0FFICE oF THE SECRETARY MEMORANDUM FOR:

Jamer M. Taylor Executive Director for Operations hj.6J-}yle Michelson, Acting Chairman, A Car Samuel'J. Chilk, Secretary j

FROM:

SUBJECT:

STAFF REQUIREMENTS - SECY-89-311 -

RESOLUTION PROCESS FOR SEVERE ACCIDENT ISSUES ON EVOLUTIONARY LIGHT WATER REACTORS 1

In SECY-89-311, the staff requested guidance on whether:

a. New generations of reactor designs should be demonstrably safer than the current generation, and
b. The staff's approach to the review of evolutionary LWRs is appropriate.

The Commission, with all Commissioners agreeing, reaffirms its expectation stated in the Policy Statement on Severe Reactor Accidents Regarding Future Designs and Existing Plants, "...

that vendors engaged in designing new standard (or custom) plants will achieve a higher standard of severe accident safety performance than their prior designs."

In order to accomplish this goal, in promulgating 10 CFR 52, the Commission incor-porated the criteria and procedural requirements from the Severe Accident Policy Statement.

Generally, the Commission has indicated that it believes a new design for a nuclear power plant can be shown to be acceptabia for severe accident concerns if it addresses the TMI requirements, unresolved safety issues, the medium and high priority generic safety issues, and the severe accident vulnerabilities exposed by a completed probabilistic risk assessment.

In staff's application of these criteria during reviews, it is expected that significant policy questions may arise.

The staff should elevate to the Commission, as early as possible, all issues dealing with policy considerations as follows:

I 1.

Instances where staff proposes to require measures that depart from current regulatory requirements -- including, but not limited to, design enhancements to address severe accident vulnerabilities -- should be addressed in the Ofoh 0001110166 891213 PDR 10CFR PT9.7 PDC g

l a

(

- i q

licensing review basis (LRB) document prepared for a j

_ proposed design.

Staff should provide comments and j

recommendations to the ACRS and the Commission on all future applicant. proposed LRB documents, so that the Commission can provide policy guidance to the staff before the staff position on a final LRB document is established,

]

(EDO)

(SECY Suspense:

As Appropriate)

Licensing Review Basis documents should be reviewed by the

)

.ACRS and sent to the Commission for approval.

i (EDO)

(SECY Suspense:

As Appropriate) j 1

Vendor or-EPRI goals that go beyond our regulations should not be imoosed as requirements for individual designs, but the LRBs and SERs for specific designs should include a discussion of how the design compares with the EPRI design requirements document.

(EDO)

(SECY Suspense:

As Appropriate)

The ACRS should review both the GE ABWR and the CE System 80+ LRB documents and comment on each.

The ACRS should i

pay particular attention to the issue of whether the approach taken in the two LRB documents is consistent.

(ACRS)

(SECY Suspense:

2/23/90) 2.

Staff should also advise the Commission of additional potential policy issues when they arise during the review of the advanced. plants.

Prior to documentation in the draft Safety Evaluation Reports, staff should provide the Commission an analysis and rationale for any proposed policy and cite how it would be applied in the SER.

If ACRS review has not been provided prior to submitting the policy issue paper to the Commission, the ACRS should provide its comments to the Commission as soon as possible, in order to minimize potential delays in issuing the SERs.

(EDO/ACRS)

(SECY Suspense:

As Appropriate)

With adherence to the above requirements, it should not be necessary for the Commission to become involved in the review and approval of all draft / final Safety Evaluation Reports for the standard plant designs before they are issued.

However, the Commission, for its information, would like to receive a copy of those SERs well in advance of issuance, with all significant policy issues highlighted and discussed in the submittal from the staff to the Commission.

(See SRM on SECY-89-334 for additional guidance regarding Commission review of the EPRI Requirements Document. )

(EDO/ACRS)

(SECY SUSPENSE:

As Appropriate)

1 i

I The commission will provide additional guidance regarding generic rulemaking following receipt of staff's paper on Proposed Departure from Current Regulations.

(EDO)

(SECY SUSPENSE:

12/29/89) cc:

Chairman Carr Commissioner Roberts Commissioner Rogers Commissioner curtiss Commissioner Remick OGC GPA Boards i

/

F l-l t.

,