Application for Amends to Licenses NPF-3,removing Tech Spec Table 3.6-2, Containment Isolation Valves & Relocating List of Containment Isolation Valves & Associated Info to Updated SARML20005E806 |
Person / Time |
---|
Site: |
Davis Besse |
---|
Issue date: |
12/22/1989 |
---|
From: |
Shelton D TOLEDO EDISON CO. |
---|
To: |
|
---|
Shared Package |
---|
ML20005E803 |
List: |
---|
References |
---|
1737, NUDOCS 9001110089 |
Download: ML20005E806 (5) |
|
|
---|
Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARML20216E6051999-09-0707 September 1999 Application for Amend to License NPF-3,revising Tech Specs 3/4.3.2.1,safety Features Actuation Sys Instrumentation & Associated Bases 3/4.3.1 & 3/4.3.2,reactor Protection Sys & Safety Sys Instrumentation ML20210H0631999-07-28028 July 1999 Application for Amend to License NPF-3,revising TS 3/4.7.5.1, Ultimate Heat Sink, by Allowing Plant Operation in Modes 1-4 with Water Temp Less than or Equal to 90 F ML20210G4131999-07-27027 July 1999 Application for Amend to License NPF-3,changing TSs 6.4, Training, 6.5.2.8, Audits, 6.10, Record Retention, 6.14, Process Control Program & 6.15, Odcm ML20210G8831999-07-26026 July 1999 Application for Amend to License NPF-3,revising TSs 3/4.3.3.1, Radiation Monitoring Instrumentation, 3/4.3.3.2, Instrumentation - Incore Detectors & 3/4.3.3.9, Instrumentation - Waste Gas Sys Oxygen Monitor ML20210G5251999-07-26026 July 1999 Application for Amend to License NPF-3,revising Tech Specs for Implementation of 10CFR50,App J,Option B for Type B & C Containment Leakage Rate Testing ML20210G4631999-07-26026 July 1999 Application for Amend to License NPF-3,revising Tech Specs 3/4.3.2.1, Safety Features Actuation Sys Instrumention & Associated Bases 3/4.3.1 & 3/4.3.2, Reactor Protection Sys & Safety Sys Instrumentation ML20195F9121999-06-10010 June 1999 Application for Amend to License NPF-3,changing TS 3/4.6.4.4 Hydrogen Purge Sys, TS 3/4.6.5.1, Shield Bldg Emergency Ventilation Sys & TS 3/4.7.6.1, Crevs ML20207E7861999-05-21021 May 1999 Application for Amend to License NPF-3,allowing Use of Expanded Spent Fuel Storage Capability ML20205E4961999-03-19019 March 1999 Application for Amend to License NPF-3,requesting Withdrawal of Proposed New Action B to TS 3.6.5.2,previously Submitted in 981027 Application ML20204F1691999-03-0909 March 1999 Application for Amend to License NPF-3,adopting Changes in Frequency & Scope of Volumetric Exams Justified by W TR WCAP-14535A ML20196F3791998-11-30030 November 1998 Supplemental Application for Amend to License NPF-3, Proposing Changes to License Conditions 2.C(6) & 2.E by Transferring Operating Authority for DBNPS from Toed & Centerior Svc Co to Firstenergy Nuclear Operating Co ML20155E3181998-10-28028 October 1998 Application for Amend to License NPF-3,revising Various Sections of TS 6.0, Administrative Controls, Including Relocation of Contents of 6.11 to Plant Ufsar,Per NUREG-1430,Rev 1 ML20155E0701998-10-27027 October 1998 Application for Amend to License NPF-3,revising TSs 3/4.3.1.1 Re RPS Instrumentation & 3/4.3.2.3 Re ARTS Instrumentation by Providing Potential Reduction in Spurious Trip Rate to Provide Cost Savings in Excess of $50,000 ML20155D7731998-10-27027 October 1998 Application for Amend to License NPF-3,relocating Existing TS SR 4.6.5.1.d.4 Re Evs Negative Pressure Testing to TS 3/4.6.5.2,deleting TS Definition 1.24 & Making Related Changes Associated with Deletion of Subject Definition ML20155D8481998-10-27027 October 1998 Application for Amend to License NPF-3,revising Existing TS SRs 4.8.2.3.2.d,4.8.2.3.2.e,4.8.2.3.2.f & Table 4.8-1 Re Testing of 125 Volt DC Station Batteries & Applicable TS Bases ML20151W2811998-09-0808 September 1998 Application for Amend to License NPF-3,permitting Use of Framatome Cogema Fuels M5 Advanced Alloy Fuel Rod Cladding & Fuel Assembly Spacer Grids ML20151W2851998-09-0808 September 1998 Application for Amend to License NPF-3,revising TS Section 3/4.7.6, Plant Systems - CREVS & Associated Bases ML20236G6461998-06-29029 June 1998 Application for Amend to License NPF-3,transferring Operating Authority for DBNPS from TE & Centerior Svc Co to New Operating Company Called Firstenergy Nuclear Operating Co.Marked Up License,Safety & Environ Assessments Included ML20236R2301998-06-29029 June 1998 Resubmitted Application for Amend to License NPF-3, Transferring Operating Authority for DBNPS from Teco & Centerior Svc Co to New Operating Company Called Firstenergy Nuclear Operating Co.Safety Assessment & EA Included ML20217P8671998-04-24024 April 1998 Application for Amend to License NPF-3,modifying Existing TS 3/4.3.1.1,3/4.3.2.1,3/4.3.2.2 & Associated Bases by Relocating Tables of Response Time Limits from TS to Plant USAR Technical Requirements Manual ML20217P8251998-04-24024 April 1998 Application for Amend to License NPF-3,clarifying Discussion of Margin Between RPS High Pressure Trip Setpoint & Lift Setting for Pressurizer Code Safety Valves ML20203L0861998-02-26026 February 1998 Application for Amend to License NPF-3 to Revise TS 3/4.4.5 & TS 3/4.4.6.2,incorporating New Repair Roll Process for SG Tubes W/Defects in Upper Tube Sheet ML20197J2511997-12-23023 December 1997 Application for Amend to License NPF-3.Amend Changes TS Definitions 1.12,TS 3/4.9.5 & New TS 3.0.6 ML20197J5861997-12-23023 December 1997 Application for Amend to License NPF-3,revising TS Surveillance Requirements for ISI Requirements of Internal Auxiliary Feedwater Header,Header to Shroud Attachment Welds & External Header Thermal Sleeves ML20217R2801997-08-26026 August 1997 Application for Amend to License NPF-3,clarifying LCO 3.6.1.3.a & Revising Surveillance Requirement 4.6.1.3.c ML20217R2831997-08-26026 August 1997 Application for Amend to License NPF-3,modifying TS 3.2.5 Action Statement to Require Power Reduction to Less than 5% of Rated Thermal Power within Four Hrs If RCS Flow Rate Is Less than Specified Limit for Greater than Two Hrs ML20217G5931997-07-29029 July 1997 Suppl 950929 to Application for Amend to License NPF-3, Change TS 3/4.4.3 Re Safety Valves & Pilot Operated Relief valve-operating & Associated Bases 3/4.4.2 & 3/4.4.3 ML20141F1051997-06-24024 June 1997 Application for Amend to License NPF-3,deleting Requirements for Safety Features Actuation Sys Containment High Radiation Monitors ML20138A3201997-04-18018 April 1997 Application for Amend to License NPF-3,requesting Conversion to 24-month Fuel Cycle ML20138C3131997-04-18018 April 1997 Application for Amend to License NPF-3,requesting Rev to TS 3/4.7.6 to Include New Required Actions in Event That One or Both Channels of Radiation Monitoring Instrumentation Becomes Inoperable ML20137M1061997-03-31031 March 1997 Application for Amend to License NPF-57,revising TS to Improve Consistency Between TS & Plant Configuration, Operation & Testing & Complete Required CA to Resolve TS Discrepancies Identified in CA Program ML20138M1251997-02-14014 February 1997 Application for Amend to License NPF-3,requesting Delay of Heat Removal Sys Valve Pit Surveillance Requirements ML20134D7461997-01-30030 January 1997 Application for Amend to License NPF-3,revising SR Intervals from 18 to 24 Months Based on Results of DBNPS Instrument Drift Study & TS 2.2, Limiting Safety Sys Settings, Based on Results of Revised Framatome RPS Instrument String Error ML20134B0561997-01-20020 January 1997 Application for Amend to License NPF-3,involving TS 3/4.5.3 Re ECCS Subsystems ML20132C7771996-12-13013 December 1996 Application for Amend to License NPF-3,authorizing Transfers of Control ML20132B6871996-12-11011 December 1996 Application for Amend to License NPF-3,revising TS Definitions,Instrumentation TS & ECCS TS for Conversion to 24 Month Fuel Cycle ML20134F1851996-10-28028 October 1996 Application for Amend to License NPF-3,requesting Revisions to 3/4.8.1.1,3/4.8.1.2,3/4.8.2.3,3/4.8.2.4 & 3/4.8 Re Electrical Power Systems ML20117P5301996-09-17017 September 1996 Application for Amend to License NPF-3,supporting Conversion of DBNPS from 18 Month to 24 Month Fuel Cycle ML20117N8441996-09-12012 September 1996 Application for Amend to License NPF-3,revising Reactivity Control Systems & Emergency Core Cooling Systems ML20117M1971996-09-0404 September 1996 Application for Amend to License NPF-3,App A,Modifying TS 6.2.3 by Removing Specific Overtime Limits & Working H from TS Consistent W/Nrc Recent Determination,On Generic Basis, That Limits Need Not Be Specified ML20116K2601996-08-0707 August 1996 Application for Amend to License NPF-3,changing Tech Specs 1.0, Definitions, Bases 3/4.0, Applicability & 3/4.6.2.1, Containment Sys - Depressurization & Cooling Sys - Containment Spray Sys ML20117K1871996-05-28028 May 1996 Application for Amend to License NPF-3,revising TS 3/4.3.1.1 RPS Instrumentation & TS 3/4.3.2.2 - Anticipatory RTS Instrumentation to Increase Trip Device Test Interval ML20107L3541996-04-18018 April 1996 Application for Amend to License NPF-3,requesting NRC Review & Approval to Use Alternate Electrical Lineup.Station Blackout DG as Standby Emergency Power Source to Supply Loads Normally Supplied by EDG 1,while Being Reworked ML20101M1601996-03-29029 March 1996 Application for Amend to License NPF-3,App A,Re Surveillance Requirements for Charcoal Filter Lab Testing to Revise Testing Methodology Used to Determine Operability of Charcoal Filters in ESF Air Handling Units ML20101C6911996-03-0606 March 1996 Application for Amend to License NPF-3,revising TS 3/4.5.2 to Allow Deferment of SR 4.5.2.b for ECCS Flowpath Containing HPI 1-2 Pump Until 10th Refueling Outage, Scheduled to Begin 960408 ML20100E0051996-02-0505 February 1996 LAR 93-0003 to License NPF-3,revising Table 3.3-3 of TS 3/4.3.2.1 Re Safety Features Actuation Sys Instrumentation to More Accurately Reflect Design & Actuation Logic of Plant Sequencers & Undervoltage Relays ML20095F5861995-12-12012 December 1995 Application for Amend to License NPF-3,revising TSs Re Containment Sys ML20098C5131995-10-0202 October 1995 Application for Amend to License NPF-3,revising TS Section 5.0,design Features & Adopting Improved STS for B&W Plants Format & Content ML20098C1071995-09-29029 September 1995 Application for Amend to License NPF-3,modifying TS 3.4.3 & Associated Bases for Pressurizer Code Safety Valve Lift Setpoint Tolerances ML20098C3931995-09-29029 September 1995 Application for Amend to License NPF-3,revising Tech Spec 3/4.1.2.8, Reactivity Control Sys - Borated Water Sources - Shutdown, Tech Spec 3/4.1.2.9, Reactivity Control Sys - Operating & TS 3/4.5.1, ECCS - Core Flooding Tanks 1999-09-07
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20216E6051999-09-0707 September 1999 Application for Amend to License NPF-3,revising Tech Specs 3/4.3.2.1,safety Features Actuation Sys Instrumentation & Associated Bases 3/4.3.1 & 3/4.3.2,reactor Protection Sys & Safety Sys Instrumentation ML20210H0631999-07-28028 July 1999 Application for Amend to License NPF-3,revising TS 3/4.7.5.1, Ultimate Heat Sink, by Allowing Plant Operation in Modes 1-4 with Water Temp Less than or Equal to 90 F ML20210G4131999-07-27027 July 1999 Application for Amend to License NPF-3,changing TSs 6.4, Training, 6.5.2.8, Audits, 6.10, Record Retention, 6.14, Process Control Program & 6.15, Odcm ML20210G8831999-07-26026 July 1999 Application for Amend to License NPF-3,revising TSs 3/4.3.3.1, Radiation Monitoring Instrumentation, 3/4.3.3.2, Instrumentation - Incore Detectors & 3/4.3.3.9, Instrumentation - Waste Gas Sys Oxygen Monitor ML20210G5251999-07-26026 July 1999 Application for Amend to License NPF-3,revising Tech Specs for Implementation of 10CFR50,App J,Option B for Type B & C Containment Leakage Rate Testing ML20210G4631999-07-26026 July 1999 Application for Amend to License NPF-3,revising Tech Specs 3/4.3.2.1, Safety Features Actuation Sys Instrumention & Associated Bases 3/4.3.1 & 3/4.3.2, Reactor Protection Sys & Safety Sys Instrumentation ML20195F9121999-06-10010 June 1999 Application for Amend to License NPF-3,changing TS 3/4.6.4.4 Hydrogen Purge Sys, TS 3/4.6.5.1, Shield Bldg Emergency Ventilation Sys & TS 3/4.7.6.1, Crevs ML20207E7861999-05-21021 May 1999 Application for Amend to License NPF-3,allowing Use of Expanded Spent Fuel Storage Capability ML20205E4961999-03-19019 March 1999 Application for Amend to License NPF-3,requesting Withdrawal of Proposed New Action B to TS 3.6.5.2,previously Submitted in 981027 Application ML20204F1691999-03-0909 March 1999 Application for Amend to License NPF-3,adopting Changes in Frequency & Scope of Volumetric Exams Justified by W TR WCAP-14535A ML20196F3791998-11-30030 November 1998 Supplemental Application for Amend to License NPF-3, Proposing Changes to License Conditions 2.C(6) & 2.E by Transferring Operating Authority for DBNPS from Toed & Centerior Svc Co to Firstenergy Nuclear Operating Co ML20155E3181998-10-28028 October 1998 Application for Amend to License NPF-3,revising Various Sections of TS 6.0, Administrative Controls, Including Relocation of Contents of 6.11 to Plant Ufsar,Per NUREG-1430,Rev 1 ML20155E0701998-10-27027 October 1998 Application for Amend to License NPF-3,revising TSs 3/4.3.1.1 Re RPS Instrumentation & 3/4.3.2.3 Re ARTS Instrumentation by Providing Potential Reduction in Spurious Trip Rate to Provide Cost Savings in Excess of $50,000 ML20155D7731998-10-27027 October 1998 Application for Amend to License NPF-3,relocating Existing TS SR 4.6.5.1.d.4 Re Evs Negative Pressure Testing to TS 3/4.6.5.2,deleting TS Definition 1.24 & Making Related Changes Associated with Deletion of Subject Definition ML20155D8481998-10-27027 October 1998 Application for Amend to License NPF-3,revising Existing TS SRs 4.8.2.3.2.d,4.8.2.3.2.e,4.8.2.3.2.f & Table 4.8-1 Re Testing of 125 Volt DC Station Batteries & Applicable TS Bases ML20151W2811998-09-0808 September 1998 Application for Amend to License NPF-3,permitting Use of Framatome Cogema Fuels M5 Advanced Alloy Fuel Rod Cladding & Fuel Assembly Spacer Grids ML20151W2851998-09-0808 September 1998 Application for Amend to License NPF-3,revising TS Section 3/4.7.6, Plant Systems - CREVS & Associated Bases ML20236G6461998-06-29029 June 1998 Application for Amend to License NPF-3,transferring Operating Authority for DBNPS from TE & Centerior Svc Co to New Operating Company Called Firstenergy Nuclear Operating Co.Marked Up License,Safety & Environ Assessments Included ML20236R2301998-06-29029 June 1998 Resubmitted Application for Amend to License NPF-3, Transferring Operating Authority for DBNPS from Teco & Centerior Svc Co to New Operating Company Called Firstenergy Nuclear Operating Co.Safety Assessment & EA Included ML20217P8671998-04-24024 April 1998 Application for Amend to License NPF-3,modifying Existing TS 3/4.3.1.1,3/4.3.2.1,3/4.3.2.2 & Associated Bases by Relocating Tables of Response Time Limits from TS to Plant USAR Technical Requirements Manual ML20217P8251998-04-24024 April 1998 Application for Amend to License NPF-3,clarifying Discussion of Margin Between RPS High Pressure Trip Setpoint & Lift Setting for Pressurizer Code Safety Valves ML20203L0861998-02-26026 February 1998 Application for Amend to License NPF-3 to Revise TS 3/4.4.5 & TS 3/4.4.6.2,incorporating New Repair Roll Process for SG Tubes W/Defects in Upper Tube Sheet ML20197J2511997-12-23023 December 1997 Application for Amend to License NPF-3.Amend Changes TS Definitions 1.12,TS 3/4.9.5 & New TS 3.0.6 ML20197J5861997-12-23023 December 1997 Application for Amend to License NPF-3,revising TS Surveillance Requirements for ISI Requirements of Internal Auxiliary Feedwater Header,Header to Shroud Attachment Welds & External Header Thermal Sleeves ML20217R2801997-08-26026 August 1997 Application for Amend to License NPF-3,clarifying LCO 3.6.1.3.a & Revising Surveillance Requirement 4.6.1.3.c ML20217R2831997-08-26026 August 1997 Application for Amend to License NPF-3,modifying TS 3.2.5 Action Statement to Require Power Reduction to Less than 5% of Rated Thermal Power within Four Hrs If RCS Flow Rate Is Less than Specified Limit for Greater than Two Hrs ML20217G5931997-07-29029 July 1997 Suppl 950929 to Application for Amend to License NPF-3, Change TS 3/4.4.3 Re Safety Valves & Pilot Operated Relief valve-operating & Associated Bases 3/4.4.2 & 3/4.4.3 ML20141F1051997-06-24024 June 1997 Application for Amend to License NPF-3,deleting Requirements for Safety Features Actuation Sys Containment High Radiation Monitors ML20138A3201997-04-18018 April 1997 Application for Amend to License NPF-3,requesting Conversion to 24-month Fuel Cycle ML20138C3131997-04-18018 April 1997 Application for Amend to License NPF-3,requesting Rev to TS 3/4.7.6 to Include New Required Actions in Event That One or Both Channels of Radiation Monitoring Instrumentation Becomes Inoperable ML20137M1061997-03-31031 March 1997 Application for Amend to License NPF-57,revising TS to Improve Consistency Between TS & Plant Configuration, Operation & Testing & Complete Required CA to Resolve TS Discrepancies Identified in CA Program ML20138M1251997-02-14014 February 1997 Application for Amend to License NPF-3,requesting Delay of Heat Removal Sys Valve Pit Surveillance Requirements ML20134D7461997-01-30030 January 1997 Application for Amend to License NPF-3,revising SR Intervals from 18 to 24 Months Based on Results of DBNPS Instrument Drift Study & TS 2.2, Limiting Safety Sys Settings, Based on Results of Revised Framatome RPS Instrument String Error ML20134B0561997-01-20020 January 1997 Application for Amend to License NPF-3,involving TS 3/4.5.3 Re ECCS Subsystems ML20132C7771996-12-13013 December 1996 Application for Amend to License NPF-3,authorizing Transfers of Control ML20132B6871996-12-11011 December 1996 Application for Amend to License NPF-3,revising TS Definitions,Instrumentation TS & ECCS TS for Conversion to 24 Month Fuel Cycle ML20134F1851996-10-28028 October 1996 Application for Amend to License NPF-3,requesting Revisions to 3/4.8.1.1,3/4.8.1.2,3/4.8.2.3,3/4.8.2.4 & 3/4.8 Re Electrical Power Systems ML20117P5301996-09-17017 September 1996 Application for Amend to License NPF-3,supporting Conversion of DBNPS from 18 Month to 24 Month Fuel Cycle ML20117N8441996-09-12012 September 1996 Application for Amend to License NPF-3,revising Reactivity Control Systems & Emergency Core Cooling Systems ML20117M1971996-09-0404 September 1996 Application for Amend to License NPF-3,App A,Modifying TS 6.2.3 by Removing Specific Overtime Limits & Working H from TS Consistent W/Nrc Recent Determination,On Generic Basis, That Limits Need Not Be Specified ML20116K2601996-08-0707 August 1996 Application for Amend to License NPF-3,changing Tech Specs 1.0, Definitions, Bases 3/4.0, Applicability & 3/4.6.2.1, Containment Sys - Depressurization & Cooling Sys - Containment Spray Sys ML20117K1871996-05-28028 May 1996 Application for Amend to License NPF-3,revising TS 3/4.3.1.1 RPS Instrumentation & TS 3/4.3.2.2 - Anticipatory RTS Instrumentation to Increase Trip Device Test Interval ML20107L3541996-04-18018 April 1996 Application for Amend to License NPF-3,requesting NRC Review & Approval to Use Alternate Electrical Lineup.Station Blackout DG as Standby Emergency Power Source to Supply Loads Normally Supplied by EDG 1,while Being Reworked ML20101M1601996-03-29029 March 1996 Application for Amend to License NPF-3,App A,Re Surveillance Requirements for Charcoal Filter Lab Testing to Revise Testing Methodology Used to Determine Operability of Charcoal Filters in ESF Air Handling Units ML20101C6911996-03-0606 March 1996 Application for Amend to License NPF-3,revising TS 3/4.5.2 to Allow Deferment of SR 4.5.2.b for ECCS Flowpath Containing HPI 1-2 Pump Until 10th Refueling Outage, Scheduled to Begin 960408 ML20100E0051996-02-0505 February 1996 LAR 93-0003 to License NPF-3,revising Table 3.3-3 of TS 3/4.3.2.1 Re Safety Features Actuation Sys Instrumentation to More Accurately Reflect Design & Actuation Logic of Plant Sequencers & Undervoltage Relays ML20095F5861995-12-12012 December 1995 Application for Amend to License NPF-3,revising TSs Re Containment Sys ML20098C5131995-10-0202 October 1995 Application for Amend to License NPF-3,revising TS Section 5.0,design Features & Adopting Improved STS for B&W Plants Format & Content ML20098C1071995-09-29029 September 1995 Application for Amend to License NPF-3,modifying TS 3.4.3 & Associated Bases for Pressurizer Code Safety Valve Lift Setpoint Tolerances ML20098C3931995-09-29029 September 1995 Application for Amend to License NPF-3,revising Tech Spec 3/4.1.2.8, Reactivity Control Sys - Borated Water Sources - Shutdown, Tech Spec 3/4.1.2.9, Reactivity Control Sys - Operating & TS 3/4.5.1, ECCS - Core Flooding Tanks 1999-09-07
[Table view] |
Text
p.
s..
[ ,', ;, Docket Nu;ber 50-346 i ,
y c nse Nu;b;r NPF-3 ,
Serial Number 1737 l .
Enclosure -
Page 1 APPLICATION FOR AMENDMENT TO '
FACILITY OPERATING LICENSE NUMBER NPF-3 DAVIS-BESSE NUCLEAR POWER STATION UNIT NUMBER 1 Attached are requested changes to the Davis-Ber,se Nuclear Power Stat. ion, Unit Number 1 Facility Operating License Number hit-3. Also included are the
. Technical Description and Significant Hazards Consideration.
The proposed changes (submitted under cover letter Serial Number 1737) concern Section 3/4.6.3.1, Containment Isolation Valves, Table 3.6-2, Containment Isolation Valves Section 3/4.6.1.1, Conta.inment Integrity p Definition Section Number 1.8, Containment Integrity Bases Section 3/4.6.3, Containment Isolation Valves.
By: 7 D. C!-Shelton, Vice. President, Nuclear l
Sworn and Subscribed before me this 22nd day of December, '989 YlicAUN Y. JN!
Notary Pyblic, State bf Ohio EVELYNL DRESS NOTARYPUBUO. STATE OF0H!O MyCommissionEgiresJu!y28,1994
(
90011100B9 G9122Z PDR ADOCK 03000346 P PDC
v L
(
. - Dockst Nu b;r 50-346
-Lic:nsa_Nurb;r NPF-3 r
. ' Serial Number-1737 Enclosure
.Page 2 i
The following information is provided to support issuance of the requested changes to the Davis-Besse Nuclear Power Station, Unit Number 1 Operating License Number NPF-3, Appendix A, Technical Specifications, Section 3/4.6.3.1, Containment Isolation Valves, Table 3.6-2, Containment Isolation Valves, Section 3/4.6.1.1, Containment Integrity, Definition Section Number 1.8, i Containment Integrity, Bases Section 3/4.6.3, Containment Isolation Valves. !
A. Time Required to Implement: This change is to be implemented within 45
' days after the NRC issuance of the License Amendment. _
I B. Reason for Change (License Amendment Request Number 89-0017):
I Removal of TS Table 3.6-2 vill remove an administrative burden from both the utility and the NRC in that changes to the table vould be accomplished.in-accordance with 10CFR50.59. The test requirements for containment isolation .;
valves vill remain in the TS.
l 5
C. Technical Descriptions- See attached Technical Description (Attachment 1). -
D. Significant Hazards Consideration: See attached Significant Hazards Consideration (Attachment 2).
(
1 i
l l
l 1.
l' l
. Dock 0t Nu;ber'50-346 Lic;ns) Nu2bsr NPF-3
. -S: rial Nu2ber 1737 Attachment 1 Page 1 TECHNICAL DESCRIPTION Description of Proposed Technical Specification Change This Technical Description discusses proposed changes to Davis-Besse Nuclear Power Station (DBNPS), Unit Number 1 Operating License, Appendix A, Technical Specifications (TS) 3/4.6.3.1, Containment Isolation Valves, Table 3.6-2, Containment Isolation Valves, TS 3/4.6.1.1, Containment Integrity, TS Definition 1.8, Containment Integrity, and TS Bases 3/4.6.3, Containment Isolation Valves. This request proposes to remove TS Table 3.6-2 from the TS and relocate the list of containment isolation valves and associated information to the Updated Safety Analysis Report (USAR). This change vould allow future changes to be made to the table in accordance with 10CFR50.59 while maintaining the surveillance test requirements for containment isolation i valves in the TS. The change also removes the applicability of TS 3.0.4 to TS ,
3.6.3.1 which will allow mode changes to be made with inoperable containment isolation valves provided compliance with the action statement of LCO 3.6.3.1 is maintained. This request is similar to the License Amendment issued by the NRC on May 22, 1989, that deleted the Containment Isolation Valve table from the Operating License Technical Specifications for the Crystal River Unit Number 3 Nuclear Generating Plant.
Systems Affected Containment Isolation Valves (no hardware change) l l Safety Function of System Affected i
l -The safety function of the containment isolation valves is to isolate those L containment penetrations which are not required.to open or remain open to
( mitigate the consequences of an accident. The operability of containment
- isolation valves ensures that the containment atmosphere vill be isolated from I the outside environment in the event of a release of radioactive material to the containment atmosphere or pressurization of containment. Containment isolation within the time limits specified ensures that the release of radioactivity to the environment vill be consistent with the assumptions used in the safety analysis for a loss-of-coolant-accident (LOCA).
Effects on Safety / Proposed Change All items and information currently contained in the containment isolation valve Table 3.6-2 vill be removed from the TS and relocated to the USAR. In '
addition, this information vill be maintained within another controlled document for updating with changes that occur during the time period between USAR revisions. The requirement for containment isolation valve operability along with the associated action statements and surveillance requirements will remain in the TS. The relocation of Table 3.6-2 is an administrative matter which would allow futuce changes to be made without a license amendment, relieving both the NRC and Toledo Edison of an administrative burden.
Maintaining information from Table 3.6-2 in the USAR also assures that the information is still available to the operators. Furthermore, maintaining
4 L
, Dock 3t Nu;ber-50-346
- -( serial Numb 2r 1737 Attachment'1 Page 2 containment isolation valve information from Table 3.6-2 within another controlled document which is updated with approved changes during the time !
period between published USAR revisions will ensure that an up-to-date listing of containment isolation valve information vill be e.vailable to the operators between USAR revisions. Future-changes to the table vould only be implemented after an evaluation in accordance with 10CFR50.59 has been completed.
The proposed change to Surveillance Requirement (SR) 4.6.3.1.1 clarifies that when vork is done on a valve that would not affect the valve's performance, a valve stroke test to demonstrate isolation time compliance is not required.
For example, an activity like handvheel replacement which would not degrade _ r valve performance vould not need a stroke test. Vork which could affect valve performance would still require retesting for operability, thun no existing safety margins are affected.
In order to ensure that surveillance requirements address the isolation time requirements in the Limiting Condition for Operation (LCO), Surveillance s Requirement 4.6.3.1.3 has been added to reflect the requirement to determine isolation times are within limits for power operated or automatic containment isolation valves during TS 4.0.5 testing.
A footnote has been included which will maintain an existing provision in Table 3.6-2 which allows for not surveillance testing valves MS100, MS101, ICS11A, and ICS11B prior to entering Mode 4, but requires that the valves be tested before entering-Mode 3. This is an administrative change which allows this previously approved provision to remain in the Technical Specification.
A footnote has been added to remove the applicability of TS 3.0.4 to TS 3.6.3.1 which vill allow mode changes to be made with inoperable containment isolation valves. This change vould permit plant startup with any of the containment isolation velves listed in Table 3.6-2 inoperable as long as action statement b or c of TS 3.6.3.1 is satisfied. For the rurposes of containment isolation function, the isolated position is the safe position for an inoperable containment isolation valve and the associated containment penetration. However, certain containment isolation valves are required to open following an accident to mitigate the consequences of that accident (e.g., High Pressure Injection line valves). Securing the valves in the required safety related systems in a closed position would impact the use of those valves. However, the operability of those systems with containment isolation valves secured in a closed position vill be governed by the LCOs for those systems.
References to the Containment Isolation Valve table have been deleted in Definition 1.8, SR 4.6.1.1.a.1, TS 3.6.3.1, SR 4.6.3.1.1 and SR 4.6.3.1.2.
The present exception in Table 3.6-2 allowing opening of certain valves under administrative control has been retained in Definition 1.8, SR 4.6.1.1.a.1 and TS 3.6.3.1 by adding appropriate wording. Bases 3/4.6.3, containment Isolation Valves, has been revised to reflect the Technical Specification changes. Concurrent with removal of Table 3.6-2, these changes are administrative in nature only.
l l
1
,- Dockatt Number 50-346. ';
.. Lictn20 Nunb;r NPF-3 Serial Number 1737
-Attachment 1
. .Page 3 TheLexisting footnote in Table 3.6-2 which indicates the valves which are not subject to 10CFR50 Appendix J Type C testing is a clarifying note. Therefore, this~ note vill not be maintained in the TS, but the information on which valves do not require Type C testing vill be maintained in the USAR for clarification and reference.
Unreviewed Safety Question / Evaluation The proposed changes vould not increase the probability of occurrence of an accident previously evaluated in the USAR because no hardware changes are being made and no initiators are affected or created-(10CFR50.59(a)(2)(1)).
The proposed changes would not increase the consequences of an accident previously evaluated in the USAR because the accident conditions and assumptions are not affected since the changes are administrative and no hardware changes are being made. The TS vill continue to require operable s containment isolation valves and appropriate surveillance requirements (10CFR50.59(a)(2)(1)).
The proposed. changes would not increase the probability of occurrence of a malfunction of equipment important to safety previously evaluated in the USAR because no station equipment or operation is being modified. The TS will continue to require operable containment isolation valves and appropriate surveillance requirements-(10CFR50.59(a)(2)(i)).
The proposed changes would not increase the consequences of a malfunction of equipment.important to safety previously evaluated in the USAR because no station equipment or operation is being modified and TS vill continue to ensure operable containment isolation valves (10CFR50.59(a)(2)(1)).
The proposed changes would not create the poscibility for an accident of a different-type than any evaluated previously in the USAR'because no hardware changes are being made and no initiators are affected or created (10CFR50.59(a)(2)(1)).
The proposed changes vould not create the possibility for a malfunction of a different' type than any evaluated previously in the USAR because no station equipment is being modified (10CFR50.59(a)(2)(ii)).
The proposed changes would not reduce the margin of safety as defined in the basis for any Technical Specification since the TS will continue to require operable containment isolation valves and appropriate surveillance requirements ((10CFR50.59(a)(2)(iii)).
Based on the above, it is concluded that the proposed Technical Specification changes do not constitute an unreviewed safety question.
,