ML20005E702
| ML20005E702 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 01/02/1990 |
| From: | Scace S NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| MP-90-001, MP-90-1, NUDOCS 9001100141 | |
| Download: ML20005E702 (1) | |
Text
.
?
i
' - *k General Offices
- Selden Street, Berlin, Connecticut T4 CC8ehtCIW LEW asepoeta gnaa>Ahv 1
.esis suc. mets niet : c'"""
P.o. BOX 270 uYu'$.iYsi H ARTFORD. CONNECTICUT OS141-0270 j
,.a.
g J
(203) 665-5000 u.v.
onr4a, wem i av ccup,
RE:
10 CFR 50.74(a) 10 CFR 55.55(a)?
l January 2, 1990 MP-90-001 U.S. Nuclear Regulatory Commission Document' Control Desk Washington, D.C.
20555 lc
REFERENCE:
Facility Operating License No. DPR-65 l
Docket No. 50-336 L
Notification of_ Change in Operator or Senior Operator.
l>
Status, Millstone Unit 2 l< _
Dear Gentlemen E
j.
Northeast Nuclear Energy Company has determined-that their no longer exists the1need to maintain the Senior Operating License of the following' personnel of Millstone, Unit 2.
This determination is
' effective = December 15, 1989.
J i:
Ralph W. Bates SOP-2993-5 i
Steven K. Brinkman OP-10671
[
l-Yours truly, NORTHEAST NUCLEAR ENERGY COMPANY W/
~
l:
Stephen E.
cace.
Station Superintendent Millstone Nuclear Power Station SES/MJW/pab l
l c:
W.
T.
Russell, Region 1 R.
M.
Gallo, Region 1 l-W.
J. Raymond, Senior Resident Inspector 9001100141 900102 ON PDR ADOCK 05000336
(
, l0 V
PDC s.
General Offices
- Selden Street, Berlin, Connecticut 9
.' siiYEcNiNiYEcw=5 P.O. box 270 avat ="t"ma c"g" "
H ARTFoRD. CONNECTICUT 03141-0270
[ *', "j' [','
(203)665-5000 L
L j
RE:
10 CFR'50.74(a)
-January 2, 1990 MP-90-002 U.S.' Nuclear' Regulatory Commission Document Control Desk-
' Washington, D.C.
20555
REFERENCE:
Facility Operating License No. DPR-65 Docket No. 50-336 Notification of Change in operator or Senior Operator Status, Millstone Unit-2 Gentlemen:-
.The following Millstone Unit 2 licensed senior operator has been reassigned'to-.a position for which a-need to maintain a license does not exist.
This reassignment is effective on the date. indicated.
Fred R. Dacimo SOP-10545-1 December 1, 1989 Yours truly, 4
NORTHEAST NUCLEAR ENERGY COMPANY
/ M Stephen E.
Scace Station Superintendent Millstone Nuclear Power Station SES/MJW/pab c:
W.
T. Russell, Region 1
'R.
M. Gallo, Region 1 W.
J.
Paymond, Senior Resident Inspector
.