Exam Rept 50-155/OL-89-01 on 891117-19.Exam Results: Candidates Passed Exam
ML20005E256
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 12/18/1989
From: Nejfelt G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20005E253 List:
References
50-155-OL-89-01, 50-155-OL-89-1, NUDOCS 9001040170
Download: ML20005E256 (2)


Text

y 4 T. [... p-U.S. NUCLEAR REGULATORY COMMISSION REGION III I

Report No.-.

50-155/0L-89-01 Docket No. 50-155 License No. DPR-6 j'-

Licensee: Consumers Power Company b

Big' Rock Point Nuclear Power Plant 10269 US31 North Charlevoix, MI 49720-9458 Facility Name:

Big Rock Point Nuclear Power Plant Examination Administered At: Big Rock Point Nuclear Power Plant Charlevoix, MI Examination Conducted: November 17-19, 1989 ibv

/h//df Examiners:

/G. M. h lt Shief Examiner Date d K cu,,

/3-/T("

E. Rau (

Date lM. Riches.,.lik14<J 4L Si3-34 Date g

MW

/2 /S-?Y R. Peterson Date

/2//g[f7 Approved By:

__.4 MicMt/lJordan, Operator Date Licensing Section No. 1 Examination Summary Examination administered on November 17-19, 1989 (Report No. 50-155/0L-89-01):

Written and Operating Initial Examinations were administered to three Reactor Operator (RO) Candidates and one Senior Reactor Operator (SRO) Candidate.

Results: All candidates successfully past their examinations.

i 9001040170 891219 PDR ADOCK 0500 3

l 1.

W

'..c.

e.

,g REPORT DETAILS 1.-

Examiners G. Nejfelt, Chief Examiner, USNRC E. Rau, USNRC M. Riches Battelle - Pacific Northwest Laboratories (PNL)-

H. Peterson-(under instruction), USNRC 2.

Exit Meeting An exit meeting was conducted on November 19, 1989. The following personnel attended this exit meeting:

Facility Representatives T. W. Elward, Plant Manager C. R. Abel, Production and Performance Superintendent D. G. Lacroix, Training Administrator W. J. Trubilowicz, Operations Supervisor 1

J. R. Hutchison, Senior Training Instructor NRC Representative l

M. Jordan, Section Chief, USNRC G. M. Nejfelt, Chief Examiner, USNRC E. Plettner, Senior Resident inspector, USNRC t

E. Rau, Examiner, USNRC H. Peterson, Examiner, USNRC M. Riches Examiner, PNL The following items were discussed during the exit meeting:

a.

The examiners were favorable impressed by the overall knowledge level and demeanor of the candidates.

b.

Security and radiological accesses for examiners to the plant were

-excellent. No delays occurred.

c.

There were no formal facility written examination comments for either the R0 or SR0 test. These examinations were previewed by your Training Staff at Big Rock Point on October 24-26, 1989, and again reviewed with your Training Staff on November 19, 1989, after the examinations.

Note: The Initial NRC Examination Exit Meeting was conducted in conjunction with the NRC Requalification Exit Meeting on November 19, 1989 (See Examination Report No. 50-155/0L-89-02).