ML20005D898
| ML20005D898 | |
| Person / Time | |
|---|---|
| Site: | 07100689, 07105908 |
| Issue date: | 12/12/1989 |
| From: | Berlin R MANHATTAN COLLEGE, RIVERDALE, NY |
| To: | Macdonald C NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| Shared Package | |
| ML20005D899 | List: |
| References | |
| 26200, NUDOCS 9001020190 | |
| Download: ML20005D898 (1) | |
Text
RETU M
(~ 068D Ma u s R a n
.~s.m~,m.,
mo ~,cu~omro,~a oma' =T. 59d8 g
'Cdege SLmm-pQV a
,r 4j USNRQ
,i
'{
-T q
>~
Muc DEC211989))
=
}
December 12,1989 nn!L strnom
//
h ss g
Docm ettRK MAIL SIctm Mr. Charles MacDonald, C
%r D ELD 4 j
Transportation Certification y
Mail Stop 4E4 NMSS/SGTB U.S. Nuclear Regulatory Commission Washington, DC 20$$$
SUBJECT:
Transport of Manhattan College Zero Power Reactor (MCZPR) Spent Fuct to ORNL
Dear Mr. MacDonald:
Manhattan College is currently preparing to replace the llEU fuel elements in the MCZPR with LEU fuel that is being fabricated by Babcock and ditcox. The spent fuel, which has essentially negligible burnup and low surface radiation levels because of the very low power level (0.1 watt) and low total operating time, will be shipped to ORNL as scrap in DOT 6m Type B packages. We have been informed by the DOE that B&W will ship the new LEU fuel elements to us in 6M packages, which we will then use for the llEU fuel clements.
We have prepared and are submitting for your approval, as required by 10 CFR Part 71,(1) a Quality Assurance Plan (Attachment 1) for the procurement and use of the 6M containcts to ship the spent fuel to ORNL (2). Procedures for llEU Shipping from Manha: tan College Nuclear Reactor Facility using a DOT 6M type B container (Attachment 11).
We have also included, for completeness, a cepy of the B&W Certificate of Complianee you issued for the DOT 6M Type B containers that will be used in this shipment (Attachment 111). In addition our correspondence with ORO providing the parameters of the spent fuct is included as Attachment IV.
P! case let rn c know if any additional information is required to obtain approval or this shipment.
Sincerely, o
q b
Robert E. Berlin Reactor Administrator p
p' #" {g 1a m=
6 cc:
Ted Michacts, NRC s
Keith Brown, DOE
!L M "
I ROC Members g/gg l
Dr. J. Lesting 9001020190 891212 b'
PDR ADOCK 071*****
[t C
FDC a zoo
.. _