ML20005D696
| ML20005D696 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 11/24/1989 |
| From: | Jordan E Committee To Review Generic Requirements |
| To: | Taylor J NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) |
| References | |
| RTR-NUREG-CR-2719, RTR-REGGD-01.135, RTR-REGGD-1.035, RTR-REGGD-1.035.01, RTR-REGGD-1.135 NUDOCS 8912140177 | |
| Download: ML20005D696 (2) | |
Text
p-q,
.c h-November 24, 1989 MEMORANDUM FOR:
James M. Taylor Acting Executive Director for Operations f'
e FROM:
Edward L. Jordan, Chairman Committee to Review Generic Requirements-I 5UBJECT:
MINUTES OF CRGR MEETING NUMBER 172
/
The Comniittee to Review Generic Requirements (CRGR)' met on Wednesday, October 25,1989 f rom 1: 00-5: 30 p.m.-
A list of attendees for this meeting is enclosed (Enclosure 1).
The following items were addressed. at the meeting:
ll 1.-
The Committee reviewed proposed Revision 3 to-Reg. Guide 1.35,MInservice Inspection of Ungrouted Tendons in Prestressed Concrete Containments,"
and proposed Reg. Guide 1.35.1, " Determining Prestressing Forces for
-t Inspection of Prestressed Concrete Containments." The Committee did not.
recommend in favor of issuing the proposed guidance in its current. form.
This matter is discussed in Enclosure 2.
2.
The Committee discussed, but did not complete their review of, the NUBARG appeal to the EDO of the staff position that prohibits use of nuclear heat and requires pressurization using solid water for hydrotesting of BWRs.
The Committee will give'further consideration to this item at-the next CRGR meeting.
This matter is discussed in Enclosure 3.
3.
The Committee discussed a proposed standard format for backfit discus-sions to be included in future generic letters and bulletins.
Several changes were suggested to further clarify the intent of the proposed format.
This matter is discussed in Enclosure 4.
In accordance with the E00's July 18, 1983 directive concerning " Feedback and
-Closure of CRGR Reviews," a written response is required from the cognizant office to report agreement or disagreement with the CRGR recommendations in these minutes.
The response, which is required within five working days after receipt of these minutes, is to be forwarded to the CRGR Chairman and if there is disagreement with CRGR recommendations, to the EDO for decisionmaking.
Questions concerning these meeting minutes should be referred to Jim Conran (492-9855).
Odginal Shned by:
il L Jo m n Edward L. Jordan, Chairman Committee to Review Generic Requirerents
Enclosures:
cc:
See next page
~As stated L
Distribution: (w/o enclosures)
D. Allison (w/ enc.)
N. Randall (w/ enc.)
PDR (NRC/CRG )
P. Kadambi (w/ enc.)
CRGR SF (w/ enc.)
E. Jordan (w/ enc.)
S. Treby 0
M. Tay1or (w/ enc.)
T. Marsh (w/ enc.)
J. Heltemes'(w/ enc.)
W. Little R. Bosnak (w/ enc.)
K. Wichman (w/ enc.)
J. Conran (w/ enc.)
p g
A AE0 D
- C/pRG OD :
A00:CyR
-OFC :
l
: G NAME :J ra.'cg
- CJH temes :
dan
...........................--.......................--......---------.--------........----,)
11889 11ff/89 DATE : 11/9/89
- g). /
. Q21g g Q OFFICIAL RECORD COPY f,'
M8 6.TZ AG ~. I'"
hh fh ((&h hfI Il
e&:,, U.: gy,
.. g
.o 1 1 if,
zA3" 06/ j..,
- !ti f
1 i,;
- W,, Qu s
I I
.g.
i L
1,,,
e f?
- 9 f'J
[
- cc w/ enclosures:
' Commission (5)
SECY:
H.-
. J. Liebbrman
.; p P.;Norry b
M. Malsch S:
- Regional. Administrators
", 1
. CRGR Members' s
f.'
(
>].
(
'?
i,
- ,4' 3
1
=
?
J
. 4
.h
- I'
)
r 1-
..