ML20005C129
| ML20005C129 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 11/06/1981 |
| From: | Baxter T SHAW, PITTMAN, POTTS & TROWBRIDGE |
| To: | Bright G, Gleason J, Kline J Atomic Safety and Licensing Board Panel |
| References | |
| ISSUANCES-OL, NUDOCS 8111180429 | |
| Download: ML20005C129 (7) | |
Text
t..
SHAW, PITTMAN, PoTTs & TROWBRIDGE 8800 M ST ACCT N. W WASHINGTON. O C. 20036 NAMSA< o po,TTM AN tTS MAR = AuGENeLiCm QAvio M Rust NSTEiN MowAmo M SMAF FE RM AN S?CUARt L e ERNESTL BLAME sm
'202 822-s000
"'T' AS r TRaviESO-DIA2 DEGORAM S EAuSER GEORGE F TROwSR'OGC CARLE? ope S SONES VICTORIA J PERasNS SCOTTA ANENBERG S1 EpMEN O POTTS TMOM AS A SAATER JOMNM O NEILL. JR SETH H MOOG AS6 AN GE RALD CM ANNCFF J AMES M SURGER Jaf a E PST'EN SMEIL A E *deC AFF E RTY peestLip D SOSTWsCE SHELDONJ wErSEL T E LECopiE R RANO L ALgEN DEgeSSA A RtDG A Ay R TwCTMv MANLON JOmeN A McC ubLOUGM 5MOTMv3 MesRiDE MENNETM J ** A UTMAN
' 202' 522 eO99 6 822-t99 GECRGE M ROGERS sR J PATR8CM ***C"[Y EUSABETM M PEN DL ETON DAvr0 LAWRENCE MtLLER FRED A LsTTLE GEORGC p M'CM AEkv. JR JOMN 8 R**eN E L AN C E R J AMES TMO** A? LF NMART PAUL A nAptAN ANNE M wmAuSaCor Mammy M GLAS$ps E G E L FREcCaiCm L s LEsN '
3RvCE w C6euRCMeLL STEVEN L AE672Em TELEX RANDAg g agth GonOONN m ANOrsa y LESut A N t C MO LSO N JR DEAND AuktCM TMOM AS ** McCORM'CM SALLv C ANCREws M ARTIN O 4RALL JOMN ENGEL SF2693 iS**AwLAW wSMs SUSAN O FAL= SON JEFFREV S GiANCOLA R:CMARO J RENOALL STEpMEN 5 MuTTLER CASLC ' SM AwLAw*
A MANNA"E " k'EEERMAN Su'bU A**8 E*"uND J Af E StLSERG WINTMROp N BRO W N SAN M FRC SANDR A E. FOLSOM SARSARA M R<,,$3OTTI JAMES S 6eAMUN JOMN L. CARR JR M ARCIA R NpWENSTEIN R
R C ARD GA wei'ER S DIRECT De AL NUMgER G RDON O
e.O CRASN.S.TERRO.E RT.ERO.L.E.N
..R..RT M wJcbu EN..E NS RA J MO Ro ~
Mm 822-1090
ON~'tS GortuC
SV d{ &p REEo JR STEVE ~ M 'ucAS NATMa~ EEL p vc= = c d mMul H'l) Co>
s November 6, 1981 u
tj NOV17 Iggy.j gA u.s.,umm=rou wxasm
~
James P.
Gleason, Esquire Mr. Glenn O. Bright 4'j Chairman Atomic Safety and Licens:, Lng
%g/fz Board Panel Nd//q (s
Atomic Safety and Licensing Board Nuclear Regulatory CoMm)ili 513 Gilmoure Drive U.S.
o Silver Spring, Maryland 20901 Washington, D.C.
20555 Dr. Jerry R. Kline Atomic Safety and Licensing W
Board Panel U.S. Nuclear Regulatory Commission
(,
Washington, D.C.
20555 9
CC W
'\\
em~
In the Matter of 5
NOV 101981 - di Union Electric Company
,, h j
- p.,,,,
(Callaway Plant, Unit 1) i, p/
Docket No. STN 50-483 OL c
'D ob Administrative Judges Gleason, Bright and Kline:
y-Pursuant to the Atomic Safety _and Licensing Board's Memorandum and Order (Modification of Hearing Schedule), dated September 24, 1981, please find enclosed Applicant Union Elec-tric Company's testimony and exhibits to be presented at the hearing beginning on November 17, 1981, on Joint Intervenors' construction defects contentions.
I have also enclosed an " Order of Presentation,"
which indicates Applicant's present plans for the sequence of evidentiary presentations.
Because we are unable to pre-dict the length of the cross-examination by Joint Intervenors, I cannot rule out the possibility that witness schedule con-flicts will yet require some minor adjustments to this order of presentation.
b
( 00 8111180429 8111'~7 h\\
~
l PDR ADOCK 05000 G
pg
~
o
~ ~
SHAW, PITTMAN, POTTS & TROWBRIDGE James P. Gleason, Esquire Mr. Glenn O.
Bright Dr. Jerry R.
Kline November 6, 1981 Page Two Please note that Mr. Schnell's testimony, identified as item no. 1 on the ' Order of Presentation," is being served today under separate cover from Union Electric's offices in St. Louis.
Respectfully submitted, Yns k.
Thomas A. Baxter Counsel for Applicant TAB:jah Enclosures cc:
per Certificate of Service 8
4
4
'~
CALLAWAY:
Joint Intervenors' Contention 1 ORDER OF PRESENTATION 1.
Introduction and
Background:
D. F. Schnell (UE) 2.
I.C.1, Honeycombing, Reactor Building Base Mat:
B. L. Meyers (B) l T. H.'McFarland (UE)
D. W. Pfeifer (WJE) 3.
I.A, Embedded Plates:
D.
F. Schnell (UE)
B. L. Meyers (B)
E. W. Thomas (B)
K. G. Parikh (B)
J. W.
Fisher (Lehigh U.)
R. G.
Slutter (Lehigh U.)
[NRC Staff witnesses on 2 and 3) 4.
II.A.2, SA-312 Piping:
B.
L. Meyers (B)
M. F.
Stuchfield (B)
N. P. Goel (B)
G.
R.
Egan (Aptech) 5.
II.B, Preassembled Piping:
B. L. Meyers (B)
M. F.
Stuchfield (B)
H. J.
Porter (B)
R. L. Powers (UE)
J. V. Laux (UE) 6.
II.A.1, SA-358 Piping:
M.
F.
Stuchfield (B)
J. V. Laux (UE)
[NRC Staff witnesses on 4, 5 and 6]
7.
I.C.2, Concrete Imperfections, Reactor Building Dome:
E. W. Thomas (B)
G. H. Goddard (B)
B.
C.
Tye (DIC) i R. A. Muenow
[NRC Staff witnesses on 7]
S
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of
)
)
UNION ELECTRIC COMPANY
)
Docket No. STN 50-483 OL
)
(Callaway Plant, Unit 1)
)
CERTIFICATE OF SERVICE I hereby certify that copies of the documents identi-fied on the attached Enclosure List were served this 6th day of November, 1981 by deposit in the U.S. mail, first class, postage prepaid, upon the following:
James P. Gleason, Esquire A. Scott Cauger, Esquire Chainnan Assistant General Counsel Atanic Safety and Licensing Board Missouri Public Service Catmission 513 Gilmoure Drive P.O. Box 360 Silver Spring, Maryland 20901 Jefferson City, Missouri 65102 Mr. Glenn O. Bright Kenneth M. Chackes, Esquun Atardc Safety and Licensing Chackts and Hoare Board Panel 314 N. Broadway U.S. Nuclear Regulatory Comnission St. Icuis, Missouri 63102 Washington, D.C.
20555 Mr. John G. Reed Dr. Jerry R. Kline Foute 1 Atanic Safety and Licensing Kingdan City, Missouri 65262 Board Panel U.S. Nuclear Regulatory Conmission Washington, D.C.
20555 Roy P. Iessy, Jr., Esquire Office of the Executive Ingal Director U.S. Nuclear Regulatory Comnission Washington, D.C.
20555 Docketing and Service Section Office of the Secretary U.S. Nuclear Regulatory Camassion Washington, D.C.
20555 (without enclosures)
~
Thomas A.
Baxter
ENCLOSURE LIST _
l.
Applicant's Testimony of Bernard L. Meyers, Thomas H. McFarland and Donald W.
Pfeifer in Response to Intervenors' Contention No. 1, Part I.C.1 (Honeycombing, Reactor Building Base Mat)
" Investigation of Concrete Base Slab at callaway Nuclear Plant for Union Electric 1
Company", WJE No. 77401, Wiss, Janney, Elstner & Associates, Inc.
- NCR No. 2-0856-C-A 2
Applicant's Testimony of Donald F.
Schnell, Bernard L. Meyers, Eugene W. Thomas, Karit G. Parikh, John W.
Fisher and Roger G.
Slutter on Joint Intervenors' Contention No. 1, Part I.A
(
j (Embedded Plates)
" Final Report - Investigation of Welded Studs", Bechtel Power Corporation, August 10, 1977 i
" Report on Testing to Evaluate Welds of Anchor Rods and Studs to Embedded Plates",
Bechtel Power-Corporation, September 15, 1980
- ULNRC-238, dated March 10, 1978, and attached report, " Acceptability of Manually Welded Embedded Plates"
" Final Report - Investigation of Documentation Supporting NCR 2-0831-C-B", Bechtel Power Corporation, January 16, 1978
- 3. Applicant's Testimony of Eugene W. Thomas, Guy H. Goddard, Jr.,
B. Christopher Tye and Richard A. Muenow in Response to Joint Intervenors' Contention No. 1, Part I.C.2 (Reactor Building Dome Concrete Imperfections)
" Revised Final Report of Containment Dome Concrete Imperfections at Callaway Unit 1",
SNUPPS Project, Job Number 10884-001, Bechtel Power Corporation, Gaithersburg, Maryland, Revision 1, September 1, 1981 4.
Applicant's Testimony of Bernard L. Meyers, Michael F. Stuchfield, Naranjan P. Goel and Geoffrey R.
Egan in Response to Joint Intervenors' Contention No. 1, Part II.A.2 (Centerline Lack of Penetration in SA-312 Piping)
- ULNRC-314, dated May 11, 1979
" Report on Investigauion of Weld Imperfections in ASME SA-312 Double Welded Austenitic Stainless Steel Pipe for Compliance with NRC I&E Bulletin 79-03", Bechtel National Corporation, August 9, 3979 m
2
?\\
' Significance of Centerline Lack-of-Penetration in Double Welded, Stainless Steel Pipe-Fracture Analysis", Aptech Report No. AES-79-08-8, August, 1979
" Significance of Centerline Lack-of-Penetration Defects in Double-Seam Welded SA-312 Stainless Steel Pipe", Aptech Report No. AES-80-03-15, May, 1980 SLNRC 80-33,' dated August 20, 1980 5.
Applicant's Testimony of Robert L. Powers, Joseph V.
- Laux, Bernard L..Meyers, Michael F.
Stuchfield and Harry J.
Porter in Response to Joint Intervenors' Contention No. 1, Part II.B (Preassembled Piping) 6.
Applicant's Testimony of Michael F. Stuchfield and Joseph V.
t Laux in Response to Joint Intervenors' Contention No. 1, Part II.A.1 (SA-358 Piping) 4 4
)
e O
3 V-s'm,4-W9-g
,Mth-w==vtg g
+ge y-e g
+'W%w,y,a.-
9vygrw-9 g y e gay-fw,s 9y,ig-3m n-3--yywp-+--vgmrq yep,y,y,yn-ee+r-99 g-
- g-g-9-e*+-p-9 9 - Tt Nr-y'PMC'*'FT--P*
t'-Y 't-d
-W FTrY'Y**V9'P"^'-