ML20005C025

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 70-0754/81-02 on 810915-18.No Noncompliance Noted.Failure to Follow Internal Procedures in Loading Nuclear Matl Vault Not Cited as Noncompliance
ML20005C025
Person / Time
Site: 07000754
Issue date: 10/30/1981
From: Book H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Darmitzel R
GENERAL ELECTRIC CO.
Shared Package
ML20005C026 List:
References
NUDOCS 8111180237
Download: ML20005C025 (2)


Text

-Y e-@gm

/

)

W 4

t.

4 4

OCT 3 0 %i Docket No. 70-/54 General Electric Company Vallecitos Nuclear Center 1

b EQ/

P. O. Box 460 O

Pleasanton, California 94566

  • i Attention: Mr. R. W. Damitzel, Manager

\\

4'0VJ 71981%.

Irradiation Processing Operation T

u.s m,d@"cer cod Gentlemen:

Subject:

Inspection of Vallecitos Nuclear Center 4

9 (n

\\u This refers to a routine safety inspection conducted by Mes

. J. Cooley and P. R. Zurakowski of this office on September 15-18, 1981, of activities authorized under NRC license Number SilM-960 and to the discussion of the findings held with members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed inspection report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, inter-views with personnel, and observations by the inspector.

In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.

If this report contains any information that you (cr your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone within ten (10) days from the date of this letter of your intention to file a request for withholding; and (b) submit within 25 days from the date of this letter a written application to this office to withhold such information.

If your receipt of this letter has been delayed such that less than seven (7) days are available for your review, please notify this office promptly so that a new due date may be established. Consistent with section 2.790(b)(1), any such application must be accompanied by an affidavit executed by the which identifies the document or part sought to be, owner of the information withheld, and which contains a full statement of the basis on which it is claimed that the 8111180237 G11030 PDR ADOCK 07000754 C

I E 01 o

.'k.

W.

...b.........

[..

"'c5..W!Q...,JURAK0gKL}i

.,U@ MAS,...,

,,, BOO K

$,d 5""'>

.C,0g g,,,

c4 1047/81 10Rf/81 10

/81

%/M,,

/O[

f/,,

OFFICIAL RECOFiD COPY '

""*-"8" we rom re no,8omecu o2"

F General Eie.ctric Company DCT37.ES3 information should be withheld from public disclosure. This section further requires the statement to address with specificity the considerations listed in 10 LFR 2.790(b)(4). The information sought to be withheld shall be incorpo:'ated as far as possible into a separate part of the affidavit.

If we do not hear from you.in this regard within the specified periods noted above, the report will be placed in the Public Document Room.

Should you have any questions concernir.g this inspection, we will be glad to discuss ther.: with you.

Our offices have recently moved. We call your attention to the new railing address on the letterhead above.

Sincerely, h@33 dn; ki

a. r!
mb N H. E. Book, Chief Fuel Facility and Materials Safety Branch

Enclosure:

IE Inspection Report No. 70-754/81-02 bcc: DMB/ Document Control Desk (RIDS)

Distributed by RV:

LFMB l

State of CA Engelken(1tr) l 4"

a

--a