ML20005B909

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Aug 1981
ML20005B909
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 09/01/1981
From: Hairston W
ALABAMA POWER CO.
To:
Shared Package
ML20005B907 List:
References
NUDOCS 8109160102
Download: ML20005B909 (4)


Text

.

JOSEP11 H. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE SU?!>lARY-OF OPERATIONS AUGUST, 1981 There were tuo (2) power reductions in the month of August.

The following safety-related maintenance was performed in the acnth of August:

1.

Performed miscellaneous maintenance on diesel generators.

2.

Major work performed on Diesel Generator IC.

3.

Repacked #2, #4 and #10 River Water Pumps.

k R

OPERATING DATA REPORT DOCKET NO. 50-348 y

DATE 9/1/81 COMPLETED itY W.G.Hairston, III TELEP!IONE (205)899-5156 OPERATING STATUS I. Unit Name:

Joseph M.

Farley - Unit 1 Notes: 1) Cumulative data

2. Repoiting Period:

Aunust, 1981 since 12/1/77, data of 2652 commercial operation.

3. Licensed Thennal Power (MWt):

860

4. Nameplate Rating (Gioss MWe):

829

5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):

844.6 803.6

7. Maximum Dependable Capacity (Net MWe):

S. If Chango Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons:

N/A

9. Power Lesel To Which Restricted,if Any (Net MWe): N/A
10. Reasons For Restrictions. !f Any:

N/A This Month Yr.-t o-Da t e Cumularise

11. ilours in Reporting Period 744 5,831 32,879
12. Number Of flours Reactor Was Critical 744 3,584.8 20,767.1.
13. Reactor Re.crie Shutdown llours 0

374.1 2,820.9

14. liours Generator On-Line 744 3,414.6 20,118.0
15. Unit Resene Shutdown floors 0

0 0

16. Gross Thermal Energy Generated (MWil)

_L 902. 2 2 5.1

,8,402,242.9 50,392,134.7 _

17. Gross Electrical Energy Generated (MWil) 594,430 2,647,304 16,066,712
18. Net Electrical Energy Generated (MWil) 563,044 2,474,430 15,082,180
19. Unit Senice Factor 100.0 58.6 61.2
20. Unit Availability Factor 100.0 58.6 61.2
21. Unit Capacity Factor (Using MDC Net) 94.2 52.8 57.1
22. Unit Capacity Factor (Using DER Net) 91.3 51.2 55.3
23. Unit Forced Outage Rate 00.0 08.6 07.2-
24. Shiitdowns Scheduled Over Next 6 Months (Type. Date.ar.d Duration of Each):
25. If Shut Down At End Of Report Period. Estimated Date of Startup:

N/A

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achiesed INITI A L CRITICA LITY 8/6/77 8/9/77

(

INITIA L ELEC1 RICITY 8/20/77 8/18/77 COMMERCIA L OPERATION 12/1/77

_12/1/77

("/77 )

f

~

DOCKET NO.

50-348 rm

\\

UNIT 1

DATE 9/l/8I COMPI ETED BY W. C. !! air s ton, III i

/

TEl.EPHONE.

(205)899-5156 MONTil August, 1981 DAY AVERAGE DAILY POWER LEVEL

  • DAY AVERAGE DA!LY POWER LEVEL (MWe-Net)

(MWe-Net) 413 756 37

'725 757 2

33 782 761 3

gg 4

781 20 758 5

21 --

760 778 6

777 22 762 7,,

7 770 23 760

~

([f3, i1[

g 784 763 24 s'~

763 9

751 gg.

767 10 784

,j 11 784 27 777 j

780 12 784

^

13 773 780 3

~

753

~

774 g4 30

~

774 IS 754

3; 752 16 i

INSDIUCT;0NS On this form:t. list the average daily unit power icvel in MWe N:: for e:ch day in th: repotting month. Compute to I

the n:: rest whole ny pwatt.

O mg (9p7) k g.

oo r

L

i N.

p 4

A

" ' \\,;,

50-348 DOCKET NO. J.M.1 arley-Unit UNITSilUTDOWNS AND POWER REDUCTIONS UNIT NAME 1

DATE 9/1/81 REPORT MONTII ~Aunus t, 1981 CO%fPLETED UY W.G.Hairston. III TELEPIIONE (205)899-5156 n.

=

~

.! E b'

.Y k Licensee

,E%

h'%

Cause & Corrective No.

Date g

3g g

,g g 5 Event u?

h

\\

Action to

$E j 5; g Report :

tN G H

gU Prevent Recurrence C

021 810801 S

0 B

4 N/A IB INSTRU Unit power reduced to and held at 180 MWE (30%) to place flow trans-mitter FT-426 back in service.

022 810801 F

0 B

4 N/A HH INSTRU Unit held at 643 Mwe (78%) to resolve problems with high pressure heaters 6A & 6B ext raction steam MOV's not opening.

I 2

3 4

F: Forced Reason:

Metimd:

Exhibit G Instructions S: Scheduled A-Equipment Fai'ure(Explain) l-M:mual for Picparation of Data IbMaintenance or Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3 Automatic Scram.

Event Report (1.ER) File (NIIREG-D Regulatory Restrietion 4-.,tiier (lixplain )

01611 E-Operator Training & License Examination F-Adnun'st rative 5

G-Operational !!:ror (Explain)

Exhibit 1 S:me Sourec (9/77)

Ii-Other(Explain)