ML20005B483

From kanterella
Jump to navigation Jump to search
Order Extending Commission Time to Review ALAB-640 to 810714
ML20005B483
Person / Time
Site: Peach Bottom, Hope Creek, Crane  Constellation icon.png
Issue date: 07/06/1981
From: Chilk S
NRC OFFICE OF THE SECRETARY (SECY)
To:
NRC COMMISSION (OCM), Public Service Enterprise Group
References
ALAB-640, NUDOCS 8107080282
Download: ML20005B483 (1)


Text

I UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION gggyg

)

In the Matter of

)

PHILADELPHIA ELECTRIC COMPANY, Docket Nos. 50-277 et al.

)

50-278

)

(Peach Bottom Atomic Power Station,

)

Units 2 and 3)

)

METROPOLITAN EDIS0N COMPANY, et al.

Docket No.

50-320

)

(Three Mile Island Nuclear Station,

)

Unit No. 2)

)

)

PUBLIC SERVICE ELECTRIC AND GAS

)

Docket Nos. 50-354 COMPANY

)

50-355 (Hope Creek Generating Station, Units 1 and 2)

)

)

ORDER Pursuant to 10 CFR 2.772, the Comission's time to consider whether to review ALAB-640 is extended to July 14, 1981.

gi

~

It is so ORDERED.

/f q,

00 % ED 1Q Ustore 11 For the Commissidn N 6198f, 7 f

e?nf$

11

/ [R/1A \\

8 O

, (AdC cp '

/

NN

[ Secretarj of t SA J.

HILK M.

Comn.ission s

gkd E

g 2

JUL 0 71981*

~

{'- u.s, W " M 3

Dated at Washington, DC.

,A thishdayofJuly,1981.

W 9eVR

  • i 9 so I f1070GO282 810706 PDR ADOCK 05000277 ~

CjO t

PDR

-