ML20005B473

From kanterella
Jump to navigation Jump to search
Order Extending Time for Commission Review of Aslab 810515 Decision (ALAB-641) Until 810720
ML20005B473
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 07/06/1981
From: Chilk S
NRC OFFICE OF THE SECRETARY (SECY)
To:
NRC COMMISSION (OCM)
References
ALAB-641, NUDOCS 8107080271
Download: ML20005B473 (1)


Text

.

UNITED STATES OF AMERICA 4 p1 pp /.

NUCLEAR REGULATORY COMMISSION A

f(N\\.

94

' 20::czn

\\' \\

fs q

f CO!&iISSIONERS :

\\

3 6()I u

3 Nunzio J.

Palladino 3;

3

-)g s ',/

4/

Victor Gilinsky

,,g.

ps @ f-

.f ;,j Peter A. Bradford N/

St l tt?

$'/ h '

\\8/

John F. Ahearne JE!?l'[O JUI g99

)

In the Matter of

)

)

PENNSYLVANIA POWER & LIGHT COMPANY AND

) Docket Nos. 50-387 ALLEGHENY ELECTRIC COOPERATIVE, INC.

)

50-388

)

(Susquehanna Steam Electric Station,

)

Units 1 and 2)

)

)

)

ORDER Pursuant to 10 CFR 2.772, the time for the Commission to review the May 15, 1981 Appeal Board decision (ALAB-641) in connection with the facility is hereby extended until July 20, 1981.

It is so ORDERED.

gol For the Commission 3

/

l E }l U T.

(j F107090271 810706

[$_ecretary of

/

SAMUEL J.

CHILK DR ADOCK 05000 the Commission dD Dated at Washington, D. C.

/ (d'

- -- hV 1 A>

A:o, cd _stm 51cu6t