Summarizes Gilinsky 810701 Tour of Units 1 & 2
ML20005B415
Person / Time
Site: Crane  
Issue date: 07/06/1981
From: Joseph Austin
NRC COMMISSION (OCM)
To:
NRC COMMISSION (OCM)
References
NUDOCS 8107080199
Download: ML20005B415 (2)


Text

7 DC0KET NUMBER c

UNITED STATES

- - - *k

      • MA

-f Q

',t NUCLEAR REGULATORY COMMISSION

- 5 h,)nE WASmN GTON. D.C. 20555 i

V

/

%p@

OFFICE OF THE

[ July 6, 1981 D00r g 7

COMMISSIONER (R

~<

6 Ustn,.

V MU 61951 >.:

C MEMORANDUM TO Ffcg,KS

. /Q \\ \\ [0' E: *

4 g FROM:

ohn H.. Austin,' Technical Assistant to b

y Commissioner Cilinsky

,il

SUBJECT:

TOUR OF THREE MILE ISLAND UNITS 1 AND 2 On July 1, 1981, Commissioner Gilinsky visited the Three Mile. Island site principally to see the submerged demineralizer system (SDS) at Unit 2.

During the course of that visit he also toured parts of Unit 1 whose restart is the subject of an adjudicatory proceeding.

This memorandum has been prepared to inform the parties about the visit to Unit 1 and to provide a written, summary of,the discussions held during the tour that related to Unit 1.

A copy of this memorandum will be placed in the case dc ket and served upon the Board and parties.

Commissioner Gilinsky was accompanied by his techni' cal assistant, John Austin, a summer legal intern in Commissioner Gilinsky's office, Glenn liutchins, Lake Barrett of NRC's TMI Program Office and Robert ' Arnold of GPU.

Mike Ross of GPU accompanied the group throughout most of the Unit 1 phase of the visit.

During the review of the SDS in the spent fuel pool area of Unit 2, Mr. Arnold pointed out that Unit 1 and 2 spent fuel pools were in the same bay and were not physically separated.

Mr. Arnold said that the separation of the two units was an issue in the TMI-l restart proceeding.

He said GPU had considered constructing a wall from the edge of the spent fuel pool of Unit 2 to the ceiling to provide for physical separation, but since the wall would have to be seismically qualified and since GPU would not be able to move the overhead crane between the two spent fuel pools, GPU decided that approach was not practical.

Instead, Mr. Arnold indicated, GPU would probably construct an enclosure at the base of the Unit 1 spent fuel pool, forming a corridor

  • hat would allow personnel access to adjoining areas of Unit 1 while providing a barrier between Unit 2 and those areas.

The Company would then isolate the air system of the spent fuel area of Unit 1 from its auxiliary building to ensure that any releaca of 43 radioactive substances during operation of the SDS did not W3 affect Unit 1 operations.

/0 8107080199 810706 P PDR ADOCK 05000289FI PDRj G

-2' A number of sections of Unit 1 were visited.

Mike Ross of'

~

' GPU joined 'Mr. Arnold in : conducting the " tour.

We viewed the

' auxiliary:feedwater pumps.

Mr. Arnold pointed out a new 1 backup air supply for control / manipulation operations.that.

was being installed.

He said a'second backup-(bottled air).

Mas to be_ installed later.

Th'e group nextLvisited the area housing the hydrogen recombiners.

^

Mr. Arnold said the1 system would be operable during plant operation;'this'would.be beyond'the NRC requirements.which allow 1about one month to.make the-system operable following' t

an accident.

We'then toured:the condenser section and the turbine building.

~

While in-the turbine-building,-Mr.-Arnold pointed out a

~

cimulator that had been constructed in one corner.

He said it;was being used to evaluate a new alarm syctem and to walk

'through procedures; the experiences were leading to/some changes-in the Unit 1. control panels.

In the_ Unit l' control room, it was mentioned that the Emergency Safeguards. Feature: panel was being modified and that cathode-ray tubesLwould lie' install'ei to display important_ parameters.

~

The. changes in the control room were reflecting the " Human-Engineering" inputs.

Emergency phone capability was summarized.

The shutdown-panels in the auxiliary building we,re observed.

.GPU ' cersonnel-said this area - wo 21d also serve as'the Technical Support Center.

Mr. Ross said t'e panels would be modified to conform with Appendix R (of Part 50) requirements.-

The group then passed through the corridor betaeen the spent fuel pools; Mr. Arnold pointed out where the new enclosure would beLconstructed to provide separation of Units 1 and 2.

After a walk through of the radwaste control panel area, the group viewed one of the make-up pump cubicles.

The general locations of other ECCS pumps were pointed out.

The waste' gas compressor section was visited.

Mr. Ross mentioned-it was difficult to establish that the walls were seismically qualified or to make them qualified.

.We then visited the video room for the manned entries to the TMI-21 containment.

A video-tape of one of the scrubbing operations was shown.

cc:

Commissioner Gilinsky