Commits to Completion of long-term Program - plant-unique Analysis for Suppression Pool Chamber,Vent Sys & Suppression Chamber Internals Per NUREG-0661,App a by 820501
ML20005B413
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 07/06/1981
From: Colbert W
DETROIT EDISON CO.
To: Kintner L
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0661, RTR-NUREG-661 EF2-53942, NUDOCS 8107080196
Download: ML20005B413 (2)


Text

..

I

'l M $ $ol'E $ a^a U s*22s July 6, 1981 I

I I (ais)2anecoo EF2-53942 Mr. L. L. Kintner d

4 Division of Project Management g

Office of Nuclear Regulation

)

3 g[

U. S. Nuclear Regulatory Commission Washington, D. C. 20555 O

I

Dear Mr. Kintner:

Reference:

1.

Enrico Fermi Atomic Power Plant, Unit E

%jNk%'/

f i

NRC Docket No. 50-341 2.

Edison letter EF2-53476, " Fermi-2 Containment Long Term Program - Plant Unique Analysis Schedule", W. F. Colbert to R. L. Tedesco, June 8, 1981.

3.

Edison letter EF2-53698,. "rermi-2 Torus Mod-ification Program - Torus Attached Piping",

W. F. Colbert to R. L. Tedesco, June 16, 1981.

Subj ect:

Fermi-2 Containment Long Term Program (LTP) -

Installation of Modifications As described in the reference 2 letter, the Edison approach for the re-solution of the Mark'I Containment issue has provided an early and prompt reassessment of the Fermi-2 containment design for the suppression pool hydrodynamic loading conditions. The attachment to the reference 2 letter identified the status of the Fermi-2 containment modifications and demonstrated that Edison has proceeded at risk to install extensive modifications prior to the final LTP acceptance criteria.

As committed in the reference 2 letter, Edison has been proceeding with maximum effort to complete the LTP-PUA for the suppression pool chamber, vent system, and suppression chamber internals by the NRC requested May 1, 1982 date. Edison anticipates that this aspect of the LTP-PUA will confirm that the installed and currently identified modifications have restored the origiani intended margin of safety in the containment de-sign. However, should it be determined that additional modifications are necessary to establish conformance with the acceptance criteria of Appendix A of NUREG - 0661, Edison is commited to the installation of such modifications prior to fuel load.

^

The program and schedule for reconcilation of the piping attached to the 5

h i

8107080196 810706 PDR ADOCK 05000341 A

PDR

]

1 Memo ts:

L. L. Kintn r

.,Paga 2 EF2-53942 July 6, 1981 torus was provided in the reference 3 letter.

If you have any questions, regarding the information presented here-in, please direct them to this office.

Sincerely, hfC L&t-W. F. Colbert Technical Director Fermi - 2 Project DFL/sim

.