'l M $ $ol'E $ a^a U s*22s July 6, 1981 I
I I (ais)2anecoo EF2-53942 Mr. L. L. Kintner d
4 Division of Project Management g
Office of Nuclear Regulation
)
3 g[
U. S. Nuclear Regulatory Commission Washington, D. C. 20555 O
I
Dear Mr. Kintner:
Reference:
1.
Enrico Fermi Atomic Power Plant, Unit E
%jNk%'/
f i
NRC Docket No. 50-341 2.
Edison letter EF2-53476, " Fermi-2 Containment Long Term Program - Plant Unique Analysis Schedule", W. F. Colbert to R. L. Tedesco, June 8, 1981.
3.
Edison letter EF2-53698,. "rermi-2 Torus Mod-ification Program - Torus Attached Piping",
W. F. Colbert to R. L. Tedesco, June 16, 1981.
Subj ect:
Fermi-2 Containment Long Term Program (LTP) -
Installation of Modifications As described in the reference 2 letter, the Edison approach for the re-solution of the Mark'I Containment issue has provided an early and prompt reassessment of the Fermi-2 containment design for the suppression pool hydrodynamic loading conditions. The attachment to the reference 2 letter identified the status of the Fermi-2 containment modifications and demonstrated that Edison has proceeded at risk to install extensive modifications prior to the final LTP acceptance criteria.
As committed in the reference 2 letter, Edison has been proceeding with maximum effort to complete the LTP-PUA for the suppression pool chamber, vent system, and suppression chamber internals by the NRC requested May 1, 1982 date. Edison anticipates that this aspect of the LTP-PUA will confirm that the installed and currently identified modifications have restored the origiani intended margin of safety in the containment de-sign. However, should it be determined that additional modifications are necessary to establish conformance with the acceptance criteria of Appendix A of NUREG - 0661, Edison is commited to the installation of such modifications prior to fuel load.
^
The program and schedule for reconcilation of the piping attached to the 5
h i
8107080196 810706 PDR ADOCK 05000341 A
]
1 Memo ts:
L. L. Kintn r
.,Paga 2 EF2-53942 July 6, 1981 torus was provided in the reference 3 letter.
If you have any questions, regarding the information presented here-in, please direct them to this office.
Sincerely, hfC L&t-W. F. Colbert Technical Director Fermi - 2 Project DFL/sim
.