Provides Guidance Re SEP Topic Format for DBE Reviews Per NRC Mar 1981 Draft Evaluation.Stresses Flexibility in Following Rept Format.Complete Topic Reviews Will Greatly Facilitate Final Safety Evaluation Issuance
ML20005B358
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 06/23/1981
From: Crutchfield D
Office of Nuclear Reactor Regulation
To: Hoffman D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
References
LSO5-81-06-091, NUDOCS 8107070546
Download: ML20005B358 (3)


Text

- _ _ - ____ - ___-____ -

q a

?

4 DISTRIBUTION:

June 23, 1981,CD_gcke V OELD NRC PDR 01&E (3)

Docket No. 50-155 LPOR ACRS(10)

LSCS06-091 D /,3 TERA HSmith ORB #5 PM NSIC CMiles,OPM@off,

,3 ORB #5 RF g

q DEisenhut RDiggs

/g/

m. J L.)

,Q tir. David P. liof fman Glainas CHamood ldl JUT,. 3. 9 L181 mi. r-tiuclear Licensing Administrator WRussell Gray FileH Consumers Power Cor.pany EMcKenna Xtra Cy (

u.s. g;i;;gramu 1945 W. Parnall Road CBerlinger m

Jackson, Michigan 49201 h

DTfY

Dear Mr. Hoffman:

W

SUBJECT:

SEP TOPIC FORFAT FOR DESIGN BASIS EVDiT REVIEWS - BIG ROCK POINT In fiarch 1981, the !!RC issued a draft evaluation of plant transients and accidents (DBEs) for the Palisades Plant.

Based on this report, each licensee of a SEP facility was to provide safety assessunts of the DBE

' topics for staff review.

The staff prepared an integrated report of all of the events for Palisades for our convenience in performing the integrated assessment.

It was not our 'ntent to require that such a report fornet be strictly followed for the remaining plants.

Individual topic reviews are an equally acceptable forrrat.

In some cases, you may elect to group related topics together to demnstrate that one topic is bounded by otners or that the plant systeas respond similarly.

The topic assessments that you submit should clearly identify how acceptance criteria are r:et and justification or planned resolution of deviations.

Results from FSARs or other docuacnts which support your conclusions shauld be included in the evaluation.

Information on the analysis methods and codes, such as whether the code has been approved by the staff, is also needed.

Co::plete topic assessments will enable the staff to issue final SERs on the DBE topics with rninimal demands on the licensee for additional information.

The guidance provided by this letter is given only to allow more fle::ibility in submittal of DDE topic revicus. No change in schedule should result.

Si ncerely.

Original 81Ened USIMM Ont h]r, Chief d

kDk dor chohhf5]i perating Reactors tiranch #5

PDR, UIViSIOG Of liCORSID9 P

cc: Sec next p;ce omer, DL:

f/,LA DL.:0RBgd/PM DL:

d /C suanaus > HJ 1.

rj...... WP.au.lbh..'..

PC.....i.e..d 6..BJi.1.....h... @.L....4Mzei.

om>

NRCTORM 318 (10-80) NRCM 0040 OFFICIAL RECORD CCPY usam mu_mmo

sn-(

[g4N jg UNITED STATES 4 9 NUCLEAR REGULATORY COMMISSION y

yig g; E WASHINGTON, D. C. 20555 Y

June 23, 1981 Docket No. 50-155 LS05-81-06-091 Mr. Da.'id P. Hoffman Nuclear 1.icensing Administrator Consumers Power Cogany 1945 W. Parnall Road Jackson, Michigan 49201

Dear Mr,

Hoffman:

SUBJECT:

SEP TOPIC FORMT FOR DESIGN BASIS EVENT REVIEWS - BIG ROCK POINT In March 1981, the NRC issued a draft evaluation of plant transients and accidents (DBEs) for the Palisades Plant. Based on this report, each licensee of a SEP facility was to provide safety assessments of thr: DBE topics for staff review.

The staff prepared an integrated report of all of the events for Palisades for our convenience in performing the integrated assessment.

It was not our intent to require that such a report format be strictly followed for the remaining plants.

Individual topic reviws are an equally acceptable format.

in some cases, you may elect to group related topics together to demonstrate th6t one topic is bounded by others or that the plant systems respond similarly.

The topic assessments that you submit should clearly identify how cceeptance criteria are met and justification or planned resolution of deviations.

Results from FSARs cc other documents which support your conclusions should be included in the evaluation.

Information on the analysis methods and codes, such as whether the code has been approved by the staff, is also needed.

Coglete topic assessments vill enable the staff to issue final SERs on the DBE topics with minimal demands on the licensee for additional information.

The guidance provided by this letter is given only to allow more flexibility in submittal of DBE topic reviews. No change in schedule should result.

l Since'ely, Dennis. Crutchfield, C ef Operating Reactors Brane.h #5 Division of Licensing cc: See next page

e

.Mr. David P. Hoffman June 23, 1981 cc:

Mr. Paul A. Perry, Secretary U.

S'. Environmental Protection.

Consumers Power Conpany Agency 212 West Michigan Avenue Federal Activities Branch Jackson, Michigan 49201 Region V Ofif ce ATTN: EIS C00RDINATOR Judd L. Bacon, Esquire 230 South Deaniorn Street Consumers Power Company Chicago, Illinois 60604 l

212 West Michigan Avenue Jackson, Michigan 49201 Herbert Grossman, Esq., Chairman Atomic 'aafety and Licensing Board Joseph Gallo, Esquire U. S. Nuclear Regulatory Commission Isham, Lh.coln & Beale Washington, D. C.

20555 1120 Connecticut Avenue Room 325 Dr. Oscar H. Paris Washington, D. C.

20036 Atomic Safety and Licensing Board U. S. Nuclear Regulatory Commission Peter W. Steketee, Esquire Washington, D. C.

20555 505 Peoples Building Grand Rapids, Michigan 49503 Mr. Frederick J. Shon i

Atomic Safety and Licensing Board Alan S. Rosenthal, Esq., Chairman U. S. Nuclear Regulatory Commission Atomic Safety & Licensing Appeal Board Washington, D. C.

20555 U. S. Nuclear Regulatory Ccnndssion Washington,* 0. C.

20555 Big Rock Point Nuclear Power Plant ATTN: Mr. C. J. Hartman Mr. John O'Neill, II Plant Superintendent Route 2. Box 44 Charlevoix, Michigan 49720 Maplo City, Michigan 45664 l

Christa-Mari a r

l Charlevoix Public Library Route 2, Box 108C l

107 Clinton Street Charlevoix, Michigan 49720 Charlevoix, Michigan William J. Scanlon, Esquire Chairman 2034 Pauline Boulevard l

County Board of Supervisors Ann Arbor, Michigan 48103 l

Charlevoix County Charlevoix, Michigan 49720 Resident Inspector Big Rock Point Plant Office of the Governor (2) c/o U.S. NRC Room 1 - Capital Building RR 43, Box 600 Lansing, Michigan 48913 Charlevoix, Michigan 49720 l

Herbert Semmel

'Mr. Jim E. Mills Council for Christa Maria, et al.

Route 2, Box 10EC Urban Law Institute Charlevoix, Michigan 49720 Antioch School of Law 253316th Street, NW Thomas S. Moore Washington, D. C.

20450 Atomic Safety.& Licensing Appeal Board U. S. Nuclear Regulatory Comission Washington, D. C.

205

lir. David P. Hoffman 3-June 23, 1981 cc:

Or. John H. Buck Atomic Safety and Licensing Appeal Board U. S. Nuclear 'legulatory Comission Washington, D. C.

20555 Ms. JcAnn Bier 204 Clinton Street Charlevoix, Michigan 49720 e

r

+

e l.

\\

I l

L 47---

'g

-w y

$c -fr

--we r

-e-w-sv-=W

-7w+ue wg-m-

ag.

s-w m-c yweye9 w

---wprev--T*va-'q o-yw T

enwetw' r qP-y-wm*wv+

9gy' gy P

wt