Approves 810430 & 0602 Proposed Revision 10 to ETR-1001, Ebasco Nuclear QA Program Manual,Re General Organization & Programmatic Changes.Programmatic Changes Must Be Submitted for Review Prior to Implementation
ML20005B264
Person / Time
Issue date: 06/10/1981
From: Haass W
Office of Nuclear Reactor Regulation
To: Tenzer B
EBASCO SERVICES, INC.
References
NUDOCS 8107070044
Download: ML20005B264 (1)


Text

r c'

(~

n s.

e ?Nh67h p/[', b.(Lud JUN 101981 D_IS1 RIBUTION:

,i O

sCentral File LPDR 1!,

NRC PDR Mr.. B. E. Tenzer NSIC 3g y 9198W C9 pon t--

Vice President QAB Projects C

u.5 %sse 2

Materials Engineering &

QAB Chron. File E QD Quality Assurance WJohnston, DE M

D b

Ebasco Services Incorporated RDiggs, LFMB Two World Trade Center VWilson, MAB New York, NY 10048 WBelke, QAB

Dear Mr. Tenzer:

SUBJECT:

NRC ACCEPTANCE OF REVISIONS TO QA TOPICAL REPORT We have completed our review of proposed Revision 10 (dated April 30, 1981 and June 2,1981) to Ebasco Topical No. ETR-1001, "Ebasco Nuclear Quality Assurance Program Manual." The revisions concern general organizational and progransnatic changes.

Based on our evaluation of the proposed changes described in Revision 10, we find that your revised topic 6! report continues to meet the criteria of Appendix B to 10 CFR Part 50 cnd is, therefore, acceptable.

To use the topical. report in future license applications, Ebasco need only reference this topical report in Section 17 of the Safety Analysis Report. We do not intend to repeat our review of this topi-cal report when it is referenced in an application unless changes occur in our acceptance criteria.

Should regulatory criteria or regulations change such that our conclusions about this topical report are invalidated, we will not:fy you. You will be given the opportunity to revise and resubmit it should you ri desire.

As noted above, should you desire to reference this topical report in support of quality assurance programs for new nuclear power projects, the basis of our evaluation will be the acceptance criteria given in the revisicn to SRP Section 17.1 in use at that time.

Progransnatic changes by Ebasco to the quality assurance program described in this topical rep 6rt are to be submitted to the NRC for review prior to implementation.

Organizational changes are to be submitted no later than 30 days after announcement.

Please replace our letter of January 5,1981 with this letter, renumber the report as ETR-1001, Rev.10A, and sibmit 36 copies to the NRC. Your submittal should iden-tify the changes by use of a black bar in the margin, and the revision number should be shown adjacent to the bar. Your transn'ittal letter should also identify the nuclear units to which this revised topical report will apply.

Should you have any questions regarding our review or if we can provide assistance,,g please feel free to contact me or Mr. William Belke at (301) 492-7741.

Sincerely,

/

bg 8107070044 810610

/)g PDR TOPRP EECEBAS Original signed by C

PjR Walter P. Haass

(/

Walter P. Ha nss, Unlet

- ).Quali.ty. Assu

...DE.;@h O,..

can ce.. Branch.

"'c'>

aa~*>.WBelke d

,4,a ss.

Divisipn,0f,Eggipeerigg, 6M.U81..

6!k.!.81..

' m es2n24 NRC FORM 3f 8 00 8CINRCM O240 OFFICIAL RECORD COPY